H.-G. Moser July 25, 2012 PXD Summary Agenda: PXD Session: July 23, 2012 This talk: selected topics (excuses, don’t feel neglected!) 1 17:00Introduction.

Slides:



Advertisements
Ähnliche Präsentationen
Die Entwicklungspartnerschaft Beruf und Arbeit im Pakt! wird im Rahmen der Gemeinschaftsinitiative EQUAL aus Mitteln des Europäischen Sozialfonds und aus.
Advertisements

Using TopReX 4.23 – study in HEPG/generator level- by Adonis Papaikonomou for the KA-Top-Meeting 10/09/07 Simulating Problems found in Gen6 simulation.
Holger Flemming, GSI, EE DVEE-Palaver, th Workshop on Electronics for LHC and Future Experiments , Heidelberg.
The Male Perspective! Ever got sick of those luvy-duvy s that women seem to love to proliferate? Die Perspektive des Mannes! Schon mal genug gehabt.
CALPER Publications From Handouts to Pedagogical Materials.
+ Arbeitsbericht mit Blick in die Zukunft M. Pernicka
Titelmasterformat durch Klicken bearbeiten Textmasterformate durch Klicken bearbeiten Zweite Ebene Dritte Ebene Vierte Ebene Fünfte Ebene 1 Titelmasterformat.
Die Mission der STA Seit 2005Tell the World Im Jahr 2010 wurde das Projekt vervollständigt mit Reach up Reach Across Reach Out.
Titelmasterformat durch Klicken bearbeiten Textmasterformate durch Klicken bearbeiten Zweite Ebene Dritte Ebene Vierte Ebene Fünfte Ebene 1 Titelmasterformat.
KIT – die Kooperation von Forschungszentrum Karlsruhe GmbH und Universität Karlsruhe (TH) The dependence of convection-related parameters on surface and.
Trouble with Time Travel Part 2b 2b = to be = sein.
1 Public libraries’ perspectives in the digital media world Doom or bloom: reinventing the library in the digital age 29th October 2009 Christian Hasiewicz.
J. Neymeyer, T. Wülfing, W. Abdul-Wahab Al-Ansari, A. Apostolidis, S
Institut für Angewandte Mikroelektronik und Datentechnik Phase 5 Architectural impact on ASIC and FPGA Nils Büscher Selected Topics in VLSI Design (Module.
Mein Arbeitspraktikum. Today we are learning to talk about work experience we have done, giving facts, details and opinions The bigger picture: We are.
1IWF/ÖAW GRAZ Data Combination David Fischer, Rumi Nakamura (IWF/OeAW)  Fluxgate: noise + distortion gets worse than the searchcoil at ~ 6 Hz.  Searchcoil:
Synchronization: Multiversion Concurrency Control
Institut für Angewandte Mikroelektronik und Datentechnik Course and contest Results of Phase 4 Nils Büscher Selected Topics in VLSI Design (Module 24513)
Beam Dynamics Meeting March Professur für Theoretische Elektrotechnik und Numerische Feldberechnung Sebastian Lange Simulation of Longitudinal.
16/04/15Matthias Bergholz DESY Zeuthen 1 Untersuchung von strahlenharten Multigeometrie-Pixelsensoren für den zukünftigen CMS Spurdetektor im Rahmen der.
Institut für Angewandte Mikroelektronik und Datentechnik Course and Contest Results of Phase 5 Eike Schweißguth Selected Topics in VLSI Design (Module.
Literary Machines, zusammengestellt für ::COLLABOR:: von H. Mittendorfer Literary MACHINES 1980 bis 1987, by Theodor Holm NELSON ISBN
Teammeeting NTW, Uta Bilow International Masterclasses 2013.
Institut für Angewandte Mikroelektronik und Datentechnik Results of Phase 4: Layout for ST65 technology by Christoph Niemann Selected Topics.
The influence of spatial variability of polar firn on microwave emission Martin Proksch 1, Henning Löwe 1, Stefanie Weissbach 2, Martin Schneebeli 1 1.
Turkish Assimilation in Germany The past, the present, the future.
Pierre Auger Observatory. Pierre Auger( ) Was a nuclear physics and cosmic ray physics. Made cosmic ray experiments on the Jungfraujoch Discovery.
Nachweis von B 0 s -Oszillationen mit dem ATLAS Detektor am LHC B. Epp 1, V.M. Ghete 2, E. Kneringer 1, D. Kuhn 1, A. Nairz 3 1 Institut für Experimentalphysik,
Zeit, Tempus und Aspekt im Englischen
The Journey to America… The Immigrant Experience.
Studentenstreik 2009, 2010 in Deutschland Part 1: Studiengebühren.
© Crown copyright 2011, Department for Education These materials have been designed to be reproduced for internal circulation, research and teaching or.
Lecture slides for Training Curriculum TIA Portal
EUROPÄISCHE GEMEINSCHAFT Europäischer Sozialfonds EUROPÄISCHE GEMEINSCHAFT Europäischer Fonds für Regionale Entwicklung Workpackage 5 – guidelines Tasks.
Fakultät für Gesundheitswissenschaften Gesundheitsökonomie und Gesundheitsmanagement Universität Bielefeld WP 3.1 and WP 4.1: Macrocost.
Heavy duty asphalt; The Hamburg Way Bergisch Gladbach June
Outline Collaborators HgTe as a 3D topological insulator Sample design
Prof. Peter Mustermann | Institut xxxxx | Seite 1 Dr. Lothar Naumann | Institute of Radiation Physics | Timing RPC for prompt gamma.
Klinik und Poliklinik für Augenheilkunde Morphology, Accuracy, and Histology of Corneal Flap Cuts Using a 200 kHz Femtosecond Laser Augenklinik, Klinikum.
Daniel Britzger, MPI für PhysikSoftware-Implementierung des DEPFET Vertex Detectors für ILC Simulation des DEPFET Vertex Detectors Daniel Britzger MPI.
Essay structure Example: Die fetten Jahre sind vorbei: Was passiert auf der Almhütte? Welche Bedeutung hat sie für jede der vier Personen? Intro: One or.
DPG Frühjahrstagung „Teilchenphysik“ Heidelberg, Photon identification in double beta-decay experiments using segmented germanium detectors.
The Umlaut “Ü” in German: Exercises Based on chapter 5.8 of Rundblick 2 and online Speaking Practice Chapter 7.8 and 9.9.
Mitglied der Helmholtz-Gemeinschaft PANDA LV. Collaboration Meeting - Wien FEM Simulation – strip barrel staves D. Grunwald, V. Fracassi, E.
Strukturen 3B.2 LEKTION 3B 3B.2-1© 2014 by Vista Higher Learning, Inc. All rights reserved. Time expressions Startblock German has two main concepts related.
Impeachment of a US President Impeachment of a US President.
High-beta Experiment on
Freizeit Thema 5 Kapitel 1 (1)
Du bist am dicksten und am dümmsten.
Electronics: Overview
Grundlagen Englisch Passive voice HFW Bern.
The dynamic ultrasound
Process and Impact of Re-Inspection in NRW
IETF 80 Prague DISPATCH WG
Get your Project started
Weihnachten in Deut sch land.
CERN – TUD – GSI Webmeeting
Results from CO2 heat pump applications
Ferrite Material Modeling (1) : Kicker principle
Collaborative Webmeeting November 24th, 2010 Geneve / Darmstadt
Institut für Experimentelle
Uranus. Uranus is the seventh in terms of distance from the Sun, the third in diameter and the fourth in mass of the planet of the Solar System. It was.
ELECTR IC CARS Karim Aly University of Applied Sciences.
CSL211 Computer Architecture
Practical Exercises and Theory
Calorimetry as an efficiency factor for biogas plants?
Niedersächsisches Ministerium
Grundlagen Englisch Revision: HFW Bern Philipp Brunner Present tenses
Cooling R&D plans in Aachen
 Präsentation transkript:

H.-G. Moser July 25, 2012 PXD Summary Agenda: PXD Session: July 23, 2012 This talk: selected topics (excuses, don’t feel neglected!) 1 17:00Introduction (15')Christian Kiesling 17:15DEPFET Status (30')Rainer Richter 17:45EMCM, 3rd metal, flip-chip (15')Laci Andricek 18:00Lab Tests, Irradiations (20')Jelena Ninkovic 18:20Test Beam Results (15')Carlos Marinas 18:35Electronics (ASICs, DHH, DCE) (30') Ivan Peric 19:05Services, Power (20')Stefan Rummel 19:25Cooling/Mockups (15')Carsten Niebuhr 19:40Summary of PXD/TRG workshop at Bayrischzell (10') Allen Campbell

H.-G. Moser July 25, 2012 Highlights 2 SOI wafers PXD9 production start Gated Mode Irradiations ASIC,Testbeam, EMCM, DAQ Milestones

H.-G. Moser July 25, 2012 Thin Sensors -> SOI Material 3 Wafer bonding SOI process Thinning of top wafer (CMP) Processing etching of handle wafer (structured) 450  m 50  m Cut through the matrix Many steps performed by industry Result must comply with our qualtiy requirements

H.-G. Moser July 25, 2012 SOI: ICEMOS 4 February 2012: ICEMOS SOI wafers had rough surfaces in the terrace area which caused unacceptable particle contamination Had to stop sensor production New wafers arrived in May Thinned and polished by Rockwood Quality ok Diode production showed acceptable currents Start PXD9 with 13 wafers Ordered additional 40 SOI wafer from ICMOS for 2 nd PXD9 batch

H.-G. Moser July 25, 2012 SOI: Shin Etsu 5 Shin Etsu agreed to produce 5 test wafers First two wafers show good quality: Very good polishing Extremly low metal contaminations However some roughness of the top wafer edge and (very few) etch pits were found Recently we got the remaining wafers, Shin Etsu ‘fine tuned’ their process Quality improved and is now very good We gave Shin Etsu green light to produce 30 SOI wafers Thanks to Laci Andricek who worked on the SOI for years!

H.-G. Moser July 25, 2012 PXD9 Production Inner outer 6 Wafer bonding SOI process Thinning of top wafer (CMP) Processing etching of handle wafer (structured)

H.-G. Moser July 25, 2012 PXD9 Production Inner outer 7 RR: 1Feuchte Oxidation, fox2-950, 90nm, davor DCE-clean, evtl. trocken in MPI Litho ALIP neu, justiert auf vergra. ALIB, MA-IR, p-Seite Litho ALIN neu + DWL-Wafernummern, MA-VR auf ALIP Th. Oxid durchätzen, beidseitigx 52. Implantation ND0N, P 500 keV, 1E11 cm-2, n-Seite, unmaskiertx 6LPCVD-Nitrid1, 20 nmx 7LPCVD-Poly1, 550°C, 600 nmx 8LPCVD-LTO1, 105nmx 93. Implantation Poly1, n-Seite, P 140keV, 8E15cm-2x 10Rekristallisation, EANN-900, 1hx 112. Lithographie PO1N, justiert auf ALINx 12Strukturierung LTO1 n-Seite, SEZx 13Strukturierung Poly1 n-Seite, SEZ, defreckle (30% + 30sek defreckle)x 14LTO1 beidseitig abätzen, SEZx 153. Lithographie PSHNx 164. P-Kanal Implantation, 30keV, 1.5E12, Dualmodex 174. Lithographie PDPNx 185. Deep P-Implantation, B 210 keV, 1.5E12 cm-2x 19Oxidation Poly1, FOX2-900, 215nmx 20Oxinitridschicht entfernen, 2 min HF-Dipx 21Nitrid1 durchätzen, n-Seitex 227. Lithographie NOXNx 238. N+ Implantation, As 180keV, 7E14, Quadmode, Strombegrenzung (300µA)!x 245. Lithographie ND1Nx 256. Deep N-Implantation, P 500 keV, 8E11 cm-2, Dualmode?x 26LPCVD-Nitrid2, 730°C, 30nmx 27LPCVD-Poly2, 550°C, 500nmx 28LPCVD-LTO2, 105nmx 299. Implantation Poly2, n-Seite, P 140keV, 8E15cm-2x 30Rekristallisation, EANN-900, 1hx 318. Lithographie PO2Nx 32Strukturierung LTO2 n-Seite, SEZx 33Strukturierung Poly2 n-Seite, SEZ, defreckle (30% + 30sek defreckle)x 34LTO2 beidseitig abätzen, SEZx 35Poly2, p-Seite abätzen, SEZx 36Poly2 FOX2-900, 215nm?, evtl. wird die POXN vorgezogen! Rarx 37Nitrid2 durchätzen, beidseitig, davor 2min HF-Dipx 389. Lithographie POXNx 398. P+ Implantation, B 25keV, 1E15cm-2, Quadmode!!x 40Polyoxid1 p-Seite abätzen, SEZx 41Poly1 p-Seite abätzen, SEZx 42defreckle p-Seitex 43LPCVD-Nitrid3, d=30nmx 44LPCVD-LTO3, d=300nmx 45LTO3 abätzen ganzflächig, p-Seite, SEZx Lithographie NITNx 47LTO3 strukturieren, n-Seite, SAT1x 48Nitrid beidseitig durchätzen, n-Seite Nitrid3, p-Seite Nitrid1+3 -> th. Ox liegt freix 49NITDANN+H2T-450x Lithographie CO1Nx 51Oxide öffnen, n-Seitex 52Metallisierung hot alu, n-Seitex Lithographie AL1Nx 54Hotalu strukturieren n-Seitex Litho FRECN (invertierte und vergrößerte KO1N)x 56Defreckle-etch, n-Seitex 57El. Messenx Lithographie AOXNx 59Aluoxidation HOT-DIx 60LPCVD-LTO4 600/1000nm?x Lithographie KO2N, justiert auf al1nx 62LTO4 strukturieren, n-Seite, SAT2-padetchx 63Metallisierung cold alu, n-Seite, softetch!x Lithographie AL2Nx 65Alu2 strukturieren n-Seitex 66El. Messen Lithographie WINP, p-Seite, justiert auf ALIPx nm LTO4 + 85nm th. Oxid durchätzen, p-Seitex 69H2T-400x 70BCBNx 71BCBP, als Schutz für die TMAH-Ätzungx Entwicklungslabor:x 72Waferholder n-Seite, TMAH-Ätzung p-Seitex 738. Lithographie KONP, p-Seite, MA Justage auf ALIPx 74Therm. Oxid p-Seite durchätzenx 75Sputtervorreinigung: Schutzlack n-Seite, HF-Dip 60 sek, LM-Reinigungx RR: 76Metallisierung cold alu, p-Seitex Entwicklungslabor:x Lithographie ALUP, MA justiert auf ALIPx 78Alu strukturieren p-Seitex 79H2T-320, davor + danach el. Messenx 80Endreinigung, Endkontrollex 81bcbn/bcbp?x 92cutn/cutpx 92 steps/25 Masks Many improvements in design and technology to improve yield but keep performance of PXD6 E.g. Al 2 O 3 protection layer to reduce hillocks (Al – Al shorts) Increase internal spacing to provide more room for contact lines

H.-G. Moser July 25, 2012 Production Schedule 8 Total production time of a batch: 2 years First wafers leave clean room (before thinning): End 2013: yield test! First sensors available (thinned and cut): July 2014

H.-G. Moser July 25, 2012 Injection Noise & Gating 9 Normal operation: Signal charge drifts into internal gate Gated Mode Charges from background drift directly to clear gate Signal already stored in internal gate is protected

H.-G. Moser July 25, 2012 Gated Mode: Measurements 10 Gated mode successfully tested in the lab (laser) and test beam TB: Signal distribution of pixels which have been hit by a track when gated was on (from track extrapolation) MC: normal noise distribution A real signal should be here Protection: the signal of a real hit is still present after gating: Signal before gate (not cleared) Signal after gate Gate on

H.-G. Moser July 25, 2012 Gated Mode: System Aspects 11 Problem: the clear gates of all pixels have to be pulsed within 1µs => Large capacitance (16nF), large peak currents, instable control signals Decoupling 10nF Decoupling 100nF More simulations needed Have to optimize circuit and place additional decoupling capacitors (where?) Switcher modified for gating has already been submitted (back in September) Exact timing and synchronization still needs to be fixed Gating w/ or w/o readout?

H.-G. Moser July 25, 2012 Radiation Hardness 12 PXD6 matrix was irradiated with 10MeV electrons and tested with a Strontium source  Matrix works fine after irradiations (15kG)  Threshold voltage shift ~0.5V higher than after  irradiation Threshold voltage shift of 10V after 100kG (10Mrad) for clear gates is a bit on the high side  parameter for PXD9 changed to reduce effect  3-times segmentation to fine tune along matrix (but: background seems to be uniform anyway) Low energy electrons from background cause bulk damage. => increase leakage currents  however, measured damage factor only 1% instead of 6% compared to 1 MeV neutrons!  Expected effect very small: additional 19e noise

H.-G. Moser July 25, 2012 AOB 13 ASICs: Have prototypes of all ASICs Switcher18: resubmitted with mods. for gating DHP: to be re-designed for TSMC 65nm (test chip works, irradiation tested (damage and SEU): ok Test Beam: nice, new results Efficiency > 99.5% 3 rd metal copper: Nice progress Flip chip tests started EMCM: 50% produced, Ready in September DCD Switcher DHPDCE

H.-G. Moser July 25, 2012 PXD/DAQ/TRG workshop Bayrischzell, July Many points to discuss, e.g.timing of trigger signals

H.-G. Moser July 25, 2012 Milestones 15 done next

H.-G. Moser July 25, 2012 Conclusions Good news: SOI problems resolved (ICEMOS & Shin Etsu). PXD9 production has started Injection Noise: Gated operation demonstrated in test beam Working on system implementation Modified switcher submitted Background occupancy and radiation damage under control We have working prototypes of all ASICs (Milestone!) Not covered in this talk: Good progress for: DHH/DAQ, Power Supplies, Services, Cooling … 16