Integration of large scale renewable energy into the grid 7th Inter-Parliamentary Meeting on Renewables Berlin, October 5th + 6th 2007 Integration of large scale renewable energy into the grid Ralf BISCHOF Managing Director German Wind Energy Association / Bundesverband WindEnergie (BWE)
Example: Wind energy in Germany
Status quo 2006
Wind Energy in Germany – data end 2006 Installed capacity 20,622 MW Turbines 18,685 Electricity generation 35 billion kWh Share in gross electricity consumption 6.7% Employment 82,100 total value added 7.2 billion Euro Export rate 74 %
Wind energy in Europe: installed capacity
Target 2020
Target 2020 = 150 TWh/a = 36 TWh/a
Vorher Windpark Simonsberg (Schleswig-Hostein) Nachher
Repowering Double capacity [MW] + tripple power [kWh]
Are 100% wind power feasible? target: 55.000 MW until 2020! Are 100% wind power feasible?
Yes! – 2006 in West-Denmark Quelle: DENA
Technology developemt – full load hours
Increase in capacity and efficiency: Development of turbine technology
Verbesserung der Erträge und Verstetigung – Beispiel I Modellentwicklung eines deutschen Herstellers Alle Anlagen: 2.000 kW Nennleistung 98 m Nabenhöhe mittlere Windgeschwindigkeit 6,64 m/s (Durchschnitt) Rotordurch- Prototyp Ertrag Steigerung Volllast- messer aufgestellt p.a. stunden 70,4 m 2002 4,31 GWh/a 2.156 h/a 71,0 m 2003 4,87 GWh/a + 13% 2.434 h/a 82,0 m 2005 5,82 GWh/a + 35% 2.909 h/a #
Verbesserung der Erträge und Verstetigung – Beispiel II Zusätzlich am gleichen Standort mit 138 m Nabenhöhe: Rotordurch- Prototyp Ertrag Steigerung Volllast- messer aufgestellt p.a. stunden 82,0 m 2005 >6,5 GWh/a >+ 50% >3.250 h/a Nächste Schritt: 90 m Rotordurchmesser?
Die Entwicklung geht weiter …. … 160 m Nabenhöhe in Laasow/Brandenburg
Die Entwicklung geht weiter …. … Nabe einer 6-MW-Anlage mit 114 m Rotordurchmesser
Grid integration issues
General grid and system issues Quelle: DENA
Relation between costs and benefits Requirements for „low shares“ of wind energy in the system (WEC capacity < minimum system load) Requirements for “high shares” of wind energy in the systems (WEC capacity > minimum system load)
Focus: Requirements for „low shares“ of wind energy in the system System services can be provided by residual conventional power plants But some contributions of wind farms are indispensable already now Reactive power (decentral!) Congestions management (distribution level) Low voltage ride through = LVRT Reaction to disturbances (e.g. under-/overfrequency) … Some examples
Simple reactive power requirement: limits for power factor Stand: 31.03.2002 Germanischer Lloyd WindEnergie GmbH
Advanced requirement: reactive power – voltage regulation
LVRT: Grid code requirements for new (and old?) turbines Quelle: DENA
Disturbance 4.11.2006: Overfrequency in North/East-UCTE
Disturbance 4.11.2006: Overfrequency in North/East-UCTE
Disturbance 4.11.2006: Reaction of WECs in E.on grid Quelle: DENA
Grid capacity
Grid integration – current issues in Germany Production management already applied in some regions – grid expansion needs to happen more speedy Grid operators are obliged to expand grid In the meantime: demand for optimised use of grid, consideration of application of underground cable Example for optimised grid use through overhead-line monitoring: Depending on ambient temperature and wind speed increase of transmission capacity up to 50 % Only temperature: 1 % capacity per degree (ambient temperature / Celsius)
Netzausbau, Netz- und Erzeugungsmanagement Strombelastbarkeit eines Freileitungsseiles mit und ohne Sonneneinstrahlung als Funktion der Umgebungs-temperatur bei erhöhter Windgeschwindig-keit (Queranströmung 1,8 m/s) blau: Einfluß der Umgebungs- temperatur rot: Einfluß der Sonnenein- strahlung
High shares
Lastgang bei zunehmender Windeinspeisung
Lastgang bei zunehmender Windeinspeisung Quelle: DENA
Lastgang bei zunehmender Windeinspeisung Quelle: DENA
Lastgang bei zunehmender Windeinspeisung Quelle: DENA
Ergebnis Mit zunehmenden Anteilen von Windstrom verschwindet der Bedarf an Grundlastkraftwerken Faustformel: 40.000 MW Wind verdrängen 10.000 MW Grundlast Detailuntersuchung: in Dena-Netzstudie
Dena-Netzstudie: Residuale Last im Jahr 2015 35,9 GW bzw. 77 TWh/a Wind (13,9% d. Verbrauchs) Stand: 31.03.2002 ~ 10 GW
Lastgang bei zunehmender Windeinspeisung Quelle: DENA
What happens when the wind stops blowing?
Biogas Tagesspeicher
Plug-in-Hybrid
Biogas - Langzeitspeicher In Deutschland gibt es Erdgasspeicher mit einem Volumen von 32,6 Mrd. Kubikmeter. Das Arbeitsvermögen entspricht über 80 Tagen Speicherkapazität.
Speicherwasserkraft in Skandinavien Speicherinhalte (100%) Norwegen 84 TWh Schweden 34 TWh Finland 5 TWh Summe 123 TWh = 3 Monate des deutschen Stromverbrauchs
Speicherwasserkraft im Nordpool Stand: 31.03.2002 Quelle: www.nordpool.no 100% = 123 TWh
Stand: 31.03.2002
Stand: 31.03.2002
Stand: 31.03.2002
Seekabel Kontinent - Skandinavien Vorhanden 3 x West-Dänemark – Norwegen (Skagerrak), 1.000 MW West-Dänemark – Schweden (Konti-Skan), 380 MW Deutschland - Ost-Dänemark (Kontek), 550 MW Deutschland – Schweden (Baltic), 450 MW Polen-Schweden (SwePol), 450 MW
Geplante Seekabel Kontinent - Skandinavien 2008: Niederlande – Norwegen (NorNed), 700 MW, 580 km, 550 m€ 2008+: West-Dänemark – Ost-Dänemark (Großer Belt), 600 MW 2011: Deutschland – Norwegen (NorGer - EWE/EGL/Agder/Lyse), 700 MW, 500 m€ 2012+: West-Dänemark – Norwegen (Skagerrak 4), 600 MW 201x: Deutschland – Schweden (Vattenfall), ??? MW
Thank your for your attention! Ralf Bischof German WindEnergy Association (BWE) Marienstraße 19-20 D - 10117 Berlin Tel.: +49 / (0)30 - 28482-105 Fax: +49 / (0)30 - 28482-107 mailto: r.bischof@wind-energie.de