04 b Ressourcenschichtplan. © beas group 2011 / Page 2 This documentation and training is provided to you by beas group AG. The documents are neither.

Slides:



Advertisements
Ähnliche Präsentationen
ES Community Definition Group – Bundle for Customer Billing and Payment In-Person Meeting April 29, 2008 Ratingen, Germany.
Advertisements

Verschnittfaktoren
Betriebskalender
Inventur
12a Produktkonfigurator
19 Datenimport. © beas group 2011 / Page 2 This documentation and training is provided to you by beas group AG. The documents are neither approved nor.
07 Stammdaten Werkzeuge
16 Kostenrechnung
04 c Ressourcengruppen
Templates. © beas2009 / Page 2 This documentation and training is provided to you by beas group AG. The documents are neither approved nor in any way.
04 Stammdaten Ressourcen
13 APS
Kundenspezifische Anpassungen - Ändern von Objekten
14 Lagerplatzverwaltung. © beas group 2011 / Page 2 This documentation and training is provided to you by beas group AG. The documents are neither approved.
20 Chargenumbuchung. © beas group 2011 / Page 2 This documentation and training is provided to you by beas group AG. The documents are neither approved.
05 Stammdaten Arbeitsgang. © beas group 2011 / Page 2 This documentation and training is provided to you by beas group AG. The documents are neither approved.
08 Materialbedarfsplanung
12 Produktkonfiguration
17 Personalzeiterfassung
06 Stammdaten Artikel
01 Installation / Support. © beas group 2011 / Page 2 This documentation and training is provided to you by beas group AG. The documents are neither approved.
09 Kalkulation
10 Fertigung
Ingenieurbüro für Informationssysteme Konzepte und Marketing Himmelsweg 4-4a Tostedt Telefon (04182) Telefax (04182) D110 - IFI-Dienstplan.
Separable Verbs There is a group of verbs in German called separable verbs = trennbare Verben.
GERMAN 1013 Kapitel 2 3.
1 Juni 05 Lernen Sie doch wann Sie wollen... (Konzeption) eLearning bei der SKC GmbH Zorneding.
Kooperationsmöglichkeiten im Bereich Medienkompetenzförderung Heidelberg, 06.Juni 2011 Jürgen Nilgen Area Sales Lead Germany | Microsoft Learning.
SAP AG 2011, Introduction to SAP Business One 8.8, GTM Rollout Services Page 1 SwissAddOn Installation und Setup Allgemein: Zur Abdeckung Schweiz-spezifischer.
Übersicht Auf den folgenden Seiten wird Ihnen anhand einer kleinen Abteilung gezeigt, wie Sie PQM an Ihre Bedürfnisse anpassen können. Mitarbeiter einrichten.
Voraussetzung für die Einführung eines BGM-Lern-Zyklus ist die Einrichtung eines Steuerkreises.
Vorgehen bei der Entwicklung mobiler Lösungen
Sprachneuerungen des .NET Frameworks 3.5
Perfekt-Quiz Sven Koerber-Abe, 2014.
Filmtechnische Geräte in dem Film Farben (colours) Humor (humour) Musik (music) Symbole und Leitmotive (symbols and themes)
Einfaches Erstellen von Präsentationen aus Einzelfolien heraus.
Review of Verb Tense & Expressing Opinions
Arbeiten in einem agilen Team mit VS & TFS 11
The sole responsibility for the content of this presentation lies with the Clean Fleets project. It does not necessarily reflect the opinion of the European.
Artikel Mengeneinheiten
Preisfindung Rabattgruppen
Kapitel 4: Mein Tag Sprache.
Lagerverwaltung Inventur
© Crown copyright 2011, Department for Education These materials have been designed to be reproduced for internal circulation, research and teaching or.
INTERN Preisfindung Zeit- und Mengenrabatte SAP Business One, Version 9.0.
1 Suchprofile erstellen und verwalten. 2 Suchprofile bei Registrierung Hier können Sie bis zu drei Suchprofile einrichten. Diese finden Sie später unter.
Indico Meeting Dennis Klein 4. August Übersicht  Korrespondenz CERN  Trouble Ticket Queue  Integration GSI-Accounts  Subversion & Wiki  Todo.
Technische Universität München Institute of Aeronautical Engineering Prof. Dr.-Ing. Horst Baier Presentation of the Institute (December 2009)
(Name of presenter) (Short title of presentation).
14 Lagerplatzverwaltung
Azure Active Directory und Azure Active Directory Domain Services
Premiere Conferencing GmbH
12a Produktkonfigurator
you: ihr ( familiar plural ) you: du ( familiar singular)
09 Kalkulation
10 Fertigung
17 Personalzeiterfassung
04 Stammdaten Ressourcen
20 Chargenumbuchung
07 Stammdaten Werkzeuge
12 Produktkonfiguration
16 Kostenrechnung
Betriebskalender
04 c Ressourcengruppen
Templates
Ereignissteuerung
Beuth Hochschule Berlin, Juni 2017, Uwe Löhr
Verschnittfaktoren
06 Stammdaten Artikel
The new online recognition process
 Präsentation transkript:

04 b Ressourcenschichtplan

© beas group 2011 / Page 2 This documentation and training is provided to you by beas group AG. The documents are neither approved nor in any way acknowledged or endorsed by SAP. For SAP Business One, only the documentation and training officially released by SAP shall be binding upon SAP. SAP shall not be responsible for any content of this documentation and training and this documentation and training shall not be binding upon SAP in any way. The official current SAP Business One documentation and training for SAP Business One is available at and

© beas group 2011 / Page 3 Voraussetzungen für diese Lerneinheit Was Sie sicher beherrschen sollten Grundlagen SAP und beas Gute Kenntnisse von Produktionsprozessen

© beas group 2011 / Page 4 Lern-Ziele Nach Bearbeiten der Lektion können Sie: Ressourcenschichten erstellen und verwalten Arbeitsweise der Ressourcenplanung verstehen

© beas group 2011 / Page 5 Agenda Ressourcenschichtplan 1: Früheres Vorgehen (SP0) 2: Neu in SP 1 3: Anmerkungen

© beas group 2011 / Page 6 Ressourcenschichtplan Allgemein In be.as 2009 SP1 wurde der Betriebskalender erweitert. Ressourcenschichtpläne wurden eingeführt. Hier können Start- und Endzeiten definiert werden und die verfügbare Kapazität kann eingeplant werden.

© beas group 2011 / Page 7 Ressourcenschichtplan Früher in SP 0 Bisher: Jede Ressource hatte eine Start- / Endzeit, welche folgendermaßen berechnet wurde: 12 Uhr minus ½ Tageskapazität. Beispiel: Ressource mit 8 h/Tag aktueller Kapazität Start: 12:00 – (8/2) = 8:00 End: 12:00 + (8/2) = 16:00 Tageskapazität hing ab von der Einstellung in Ressource / Planung und von der Kapazität entsprechend Betriebskalender.

© beas group 2011 / Page 8 Agenda Ressourcenschichtplan 1: Früheres Vorgehen (SP0) 2: Neu in SP 1 3: Anmerkungen

© beas group 2011 / Page 9 Ressourcenschichtplan Schichtdefinition Administration – Einstellungen – Produktion – Ressourcenschichtplan Beas 2009 Menü: Produktion – Stammdaten Diese Schichten gelten nur für die Ressourcen. Es gibt keine Verbindung zum Personal !

© beas group 2011 / Page 10 Ressourcenschichtplan Neue Möglichkeiten in SP1 Der neue Betriebskalender erlaubt die Einrichtung einer 7-Tage Woche. Im Kalender wird die Kapazität jeder Ressource für jeden Tag festgelegt. Wird eine Schicht diesem Kalender zugeordnet, kann die Ressource auf Basis einer 7-Tage-Woche geplant werden.

© beas group 2011 / Page 11 Ressourcenschichtplan Neue Möglichkeiten in SP1 Schicht definieren und einem von 7 möglichen Kalendern zuordnen. Anfangs- und Endzeiten für die Tagmuster festlegen. Ressource einer Schicht zuordnen. Ohne eine Festlegung, berechnet be.as die Start/End- Zeit nach der Regel: 12 h – ½ Tageskapazität

© beas group 2011 / Page 12 Ressourcenschichtplan Neue Möglichkeiten in SP1 Zusätzlich kann die Plankapazität für jedes Tagmuster unabhängig vom Betriebskalender geändert werden.

© beas group 2011 / Page 13 Agenda Ressourcenschichtplan 1: Früheres Vorgehen (SP0) 2: Neu in SP 1 3: Anmerkungen

© beas group 2011 / Page 14 Ressourcenschichtplan Hinweise zur Kapazitätsplanung Bei der Kapazitätsplanung ist folgendes zu beachten: Vorwärtsterminierung: nur die Startzeit wird berücksichtigt Rückwärtsterminierung: nur die Endzeit wird berücksichtigt Für parallele Ressourcen, wird diejenige Schicht mit der spätesten Startzeit oder frühesten Endzeit berücksichtigt. ´ Achtung: Um korrekte Ergebnisse zu erhalten müssen folgende Bedingungen eingehalten werden: die tägliche Kapazität ist auf 24 Stunden begrenzt, Startzeit + Plankapazität darf diesen Zeitraum nicht überschreiten, Endzeit darf nicht nach 24:00 liegen. Pausen werden nicht berücksichtigt und können auch nicht eingerichtet werden.

© beas group 2011 / Page 15 Ressourcenschichtplan Hinweise zur parallelen Ressourcen Maschine Mitarbeiter Zeitrahmen zur Planung des Fertigungsauftrages Ein Fertigungsauftrag kann nur zwischen 10 und 18 Uhr eingeplant werden, auch wenn die Ressource sonst verfügbar ist.

© beas group 2011 / Page 16 Ressourcenschichtplan Hinweise zur Geschwindigkeit der Berechnung Ressourcenschichten machen die Berechnung der täglichen Kapazität komplexer. Die Kapazität wird im Voraus berechnet. Eine nachträgliche Berechnung nach einer Änderung kann über den Schalter neu berechnen erfolgen. Grundsätzlich empfiehlt sich eine Neuberechnung nach Änderungen in der Ressourcenplanung.

© beas group 2011 / Page 17 Zusammenfassung Jetzt können Sie: Ressourcenschichten erstellen und verwalten Arbeitsweise der Ressourcenplanung verstehen

Vielen Dank für Ihre Aufmerksamkeit!