TÜV Rheinland Consulting ENGAGE High Speed Broadband for Rural Europe County Donegal 12.02.2013 20.11.2018 ENGAGE High Speed Broadband fur Rural Europe.

Slides:



Advertisements
Ähnliche Präsentationen
An new European Power Network: Student Power
Advertisements

Abkürzungen mit Präpositionen German Prepositional Contractions
How to use this powerpoint by yourself…
Laurie Clarcq The purpose of language, used in communication, is to create a picture in the mind and/or the heart of another.
1 Juni 05 Lernen Sie doch wann Sie wollen... (Konzeption) eLearning bei der SKC GmbH Zorneding.
| DC-IAP/SVC3 | © Bosch Rexroth Pneumatics GmbH This document, as well as the data, specifications and other information set forth in.
You need to use your mouse to see this presentation © Heidi Behrens.
You need to use your mouse to see this presentation © Heidi Behrens.
You need to use your mouse to see this presentation © Heidi Behrens.
Welcome Instructor: Dominik Dwight Zethmeier
By: Jade Bowerman. German numbers are quite a bit like our own. You start with one through ten and then you add 20, 30, 40 or 50 to them. For time you.
Titelmasterformat durch Klicken bearbeiten Textmasterformate durch Klicken bearbeiten Zweite Ebene Dritte Ebene Vierte Ebene Fünfte Ebene 1 Titelmasterformat.
Universität StuttgartInstitut für Wasserbau, Lehrstuhl für Hydrologie und Geohydrologie Copulas (1) András Bárdossy IWS Universität Stuttgart.
Garmisch-Partenkirchen Garmisch-Partenkirchen is a mountain resort town in Bavaria, southern Germany. Nearby is Germany's highest mountain, Zugspitze,
Titelmasterformat durch Klicken bearbeiten Textmasterformate durch Klicken bearbeiten Zweite Ebene Dritte Ebene Vierte Ebene Fünfte Ebene 1 Titelmasterformat.
Sponge Bob Square Pants Im Café. Snacks WALT: Order food and drink from a menu and take part in a short role play. WILF: Greetings at the start of the.
AUDIT More Complexity of IFRS – more benefit for the investor? Dr. Anne Schurbohm, Partner, KPMG Germany 6. Dezember 2006.
SiPass standalone.
Literary Machines, zusammengestellt für ::COLLABOR:: von H. Mittendorfer Literary MACHINES 1980 bis 1987, by Theodor Holm NELSON ISBN
Arbeiten in einem agilen Team mit VS & TFS 11
Pierre Auger Observatory. Pierre Auger( ) Was a nuclear physics and cosmic ray physics. Made cosmic ray experiments on the Jungfraujoch Discovery.
Arbeitsblatt A Look at the range of Visiting Cards carefully and try to answer the following questions: 1.Diplom-BetriebswirtA.Graduate in Physics 2.Diplom-KaufmannB.Engineering.
DEUTSCHE INITIATIVE FÜR NETZWERKINFORMATION E.V. Regine Tobias & Dr. Barbara Ebert CRIS in German universities and research institutions - position paper.
How does the Summer Party of the LMU work? - Organizations and Networks -
The Journey to America… The Immigrant Experience.
1 Konica Minolta IT Solutions Prinzip Partnerschaft MANAGED MONITORING ÜBERWACHJUNG DER SERVERINFRASTRUKTUR UND ANWENDUNGEN DIREKT AUS DER CLOUD.
KLIMA SUCHT SCHUTZ EINE KAMPAGNE GEFÖRDERT VOM BUNDESUMWELTMINISTERIUM Co2 online.
Magnetenzephalogramm, MEG
Gregor Graf Oracle Portal (Part of the Oracle Application Server 9i) Gregor Graf (2001,2002)
© Crown copyright 2011, Department for Education These materials have been designed to be reproduced for internal circulation, research and teaching or.
COST working group 2 – EMM Erreichbarkeitsatlas
EUROPÄISCHE GEMEINSCHAFT Europäischer Sozialfonds EUROPÄISCHE GEMEINSCHAFT Europäischer Fonds für Regionale Entwicklung Workpackage 5 – guidelines Tasks.
Fakultät für Gesundheitswissenschaften Gesundheitsökonomie und Gesundheitsmanagement Universität Bielefeld WP 3.1 and WP 4.1: Macrocost.
What do you think this is? Draw a picture of a plug that Would fit this outlet.
Memorisation techniques
EUROPÄISCHE GEMEINSCHAFT Europäischer Sozialfonds EUROPÄISCHE GEMEINSCHAFT Europäischer Fonds für Regionale Entwicklung Workpackage 5 – guidelines Tasks.
Der AUDITOR Der Rohstoffinformationsdienst The commodity information service.
GBG Gebäude- und Baumanagement Graz GmbH Facility Management – Energiestabsstelle – Ing. Bernhard Wallner 1 GBG Gebäude- und Baumanagement Graz GmbH Energiemonitoring.
Rheinisch-Westfälisches Institut für Wirtschaftsforschung Rüdiger Budde Analysis with Remi Policy Insight in Nordrhein Westfalen – Including.
Successfull Recipies for the Future Tim Cole Internet-Publizist Salzburg/München.
Standort assurance for companies Industrie- und Handelskammer Lippe zu Detmold 01. Juni 2010 Seite 1 What does the IHK do against the crisis?
Money rules the medicine?! A presentation by Jan Peter Hoffmann European healthcare systems in comparison.
Technische Universität München Alexander Neidhardt Forschungseinrichtung Satellitengeodäsie 1 Concepts for remote control of VLBI-telescopes: on the way.
Essay structure Example: Die fetten Jahre sind vorbei: Was passiert auf der Almhütte? Welche Bedeutung hat sie für jede der vier Personen? Intro: One or.
What’s the weather like?. Look at the question above Turn it around and you have Das Wetter ist.... The phrase Das Wetter ist.... or Es ist.... can be.
© 2014 VMware Inc. All rights reserved. Automatisierung und Verrechnung in einer IoT Cloud am Beispiel von Bosch Private Cloud Costing | Cloud Business.
Intelligent Solutions The Energie Steiermark is Austria’s 4 th -largest energy company, focused on providing its customers with electricity,
Fitness. An english presentation.
Premiere Conferencing GmbH
Deutsch I Numbers….
Leibniz Association network of basic and applied research
Driving through whole Europe ? - Homologation: Problems and Solutions
Bell Work What countries border Germany?
University for Health Sciences, Medical Informatics and Technology
Process and Impact of Re-Inspection in NRW
Developing Quality in Mathematics Education II
Geschäftsentwicklung auf Sicht 3 Jahre
Get your Project started
Lumesse Talent Acquisition
= 8,7 m € = 121 m € Total Transnationality = 235 m € = 3,1 m €
To English Translations
Uranus. Uranus is the seventh in terms of distance from the Sun, the third in diameter and the fourth in mass of the planet of the Solar System. It was.
ELECTR IC CARS Karim Aly University of Applied Sciences.
Official Statistics Web Cartography in Germany − Regional Statistics, Federal and European Elections, Future Activities − Joint Working Party meeting.
OFFICE 365 FOCUS SESSION SHAREPOINT ONLINE 101:LERNE DIE BASICS 19. März 2018 Höhr-Grenzhausen.
Calorimetry as an efficiency factor for biogas plants?
Die tiere Share: Introduce the session and PDSA.
 Präsentation transkript:

TÜV Rheinland Consulting ENGAGE High Speed Broadband for Rural Europe County Donegal 12.02.2013 20.11.2018 ENGAGE High Speed Broadband fur Rural Europe County Donegal

TÜV Rheinland Group. At home on all continents. Services corporation active around the world: 16.000 employees and € 1.4 bn turnover 500 locations in 65 countries 220 locations in Germany Independent cooperation: TÜV Rheinland AG is 100 %-owned by TÜV Rheinland e.V. Known for: Independence, neutrality and expertise Great reputation in matters of safety in quality Source: TÜV Rheinland Company Report 2011 20.11.2018 ©TÜV Rheinland Consulting GmbH – Telco Solutions, 2012

TÜV Rheinland - Our 6 fields of business. Industrial Services Mobility Products Training and Consulting Life and Health Systems Wide, interdisciplinary spectrum of services 2,500 services within 6 fields of business Telco-Solutions is part of our consulting company 20.11.2018 ©TÜV Rheinland Consulting GmbH – Telco Solutions, 2012

Topics covered by telco solutions - overview Infrastructure & System Technology Broadband deployment and strategy ICT-Networks Operations & Security Condition monitoring Quality assurance Occupational safety Tendering consulting Rollout-management Broadband consulting Geo-Information-Systems Strategic FTTX planning FTTX quality assurance Safety checks System technology audits Technical reports Measurements EMF management 20.11.2018 ©TÜV Rheinland Consulting GmbH – Telco Solutions, 2012

20.11.2018 NGA Strategieberatung und Netzplanung

Scenario County Donegal: Copper-based basic ADSL 1. How would you upgrade this infrastructure to provide Next Generation Access (NGA) First step Focus on FTTC Average line length 1 km exchange-cabinet Conclusion distance is very short Compared to Germany: typical line length are up to 4km in rural areas Suggestion overbuild cabinets with outdoor DSLAMS Civil works needed to connect fiber to cabinet Alternatively via masts overground or wireless access links exchange – cabinet For final decision copper line structure needs to be analysed Possibly build one outdoor DSLAM collecting more than one cabinet Speeds depending on line length cabinet – premises 20.11.2018 ENGAGE High Speed Broadband fur Rural Europe County Donegal

Scenario County Donegal: Copper-based basic ADSL 2. What approximate speed would each subscriber receive? Depending on technic used: ADSL, VDSL, Vectoring Depending on line length Abbildung 1: Bandwidth in relation to line length VDSL2 rough estimation 20.11.2018 ENGAGE High Speed Broadband fur Rural Europe County Donegal

Scenario County Donegal: Copper-based basic ADSL 3. Would you upgrade by providing Fibre-to-the-Cabinet (FTTC) or Fibre-to-the-Premises (FTTP) ? First Step FTTC, however detailed analyses of network structure needed Line length Copper structure Distances exchange – cabinet Distances cabinet premises (average) Number of households, Number of premises Lengths street net Digging costs and surface … 20.11.2018 ENGAGE High Speed Broadband fur Rural Europe County Donegal

Scenario County Donegal: Copper-based basic ADSL 4. Would the number of exchanges need to be increased   Not necessarily, suggestion is to overbuild existing street cabinets 5. Would the number of cabinets need to be increased Depending on average line length cabinet premises when possible reduce numbers of active cabinets 20.11.2018 ENGAGE High Speed Broadband fur Rural Europe County Donegal

Scenario County Donegal: Copper-based basic ADSL 6. How much would the total cost (in €uro) of the upgrade be assuming that each existing Cabinet is an average of 1 Kilometre from the exchange 20.11.2018 ENGAGE High Speed Broadband fur Rural Europe County Donegal

Scenario County Donegal: Copper-based basic ADSL 7. Do you know of any alternative or new solutions that could applied to this ADSL access infrastructure VDSL2 Vectoring Masts for over ground fiber lines Wireless Access link between exchange and cabinet 20.11.2018 ENGAGE High Speed Broadband fur Rural Europe County Donegal

Scenario County Donegal: Copper-based basic ADSL Alternative Infrastructure Electricity Network Clean Water Distribution Network Sewage Network 20.11.2018 ENGAGE High Speed Broadband fur Rural Europe County Donegal

Appendix 20.11.2018 ENGAGE High Speed Broadband fur Rural Europe County Donegal

NGA Strategie und Netzplanung Vergleich Investitionskosten verschiedener Szenarien Szenario 1 Szenario 2 Szenario 3 Szenario 4 20.11.2018 NGA Strategieberatung und Netzplanung

Breitbandausbau - FTTX Planung. Beispiel Vergleich Anschlusskosten verschiedener Netzgebiete 18.000.000 € 16.000.000 € 14.000.000 € Szenario 1 Szenario 2 Szenario 3 Szenario 4 12.000.000 € 10.000.000 € 8.000.000 € 20.11.2018 NGA Strategieberatung und Netzplanung

Technische und wirtschaftliche Grundlagen FTTx Übersicht FTTH Netzstrukturen Home Building KVz HVT P2P Ethernet A A A Active Ethernet P A P A xPON P A P P A 20.11.2018 NGA Strategieberatung und Netzplanung

Technische und wirtschaftliche Grundlagen FTTx Investitionsumfelder von FTTx Overbuild Ausbau in Konkurrenz zu bestehenden Netzwerken Brownfield Breitbandausbau in weißen und grauen Flecken Greenfield Breitbandausbau bei Neubau von Siedlungen Quelle: FTTH Council 20.11.2018 NGA Strategieberatung und Netzplanung

FTTx Deployment and Strategy Qualified and comprehensive consulting on strategy, analysis and planning of FTTx Networks In Kooperation mit: 20.11.2018 NGA Strategieberatung und Netzplanung 18