1. Kick-off meeting Bauablaufplanung

Slides:



Advertisements
Ähnliche Präsentationen
Starter – Match up – Write the German AND English
Advertisements

Art der Arbeit (Projekt-/Studien-/Diplomarbeit/
Kapitel 4: Schule In this chapter you will: Talk about school
Ich beschreibe mein Haus!
This presentation is timed so you will only need to click on the left mouse button when it is time to move to the next slide. Right click on this screen.
Can you think of some KEY phrases which would be useful in multiple contexts? Take 2 minutes with a partner and come up with as many as you can!
You need to use your mouse to see this presentation © Heidi Behrens.
HOW TO REACH LEVEL 5 AND 6 HEALTH AND FITNESS.
ROLE-PLAY OVERLAP You are booking a room in a hotel (you start) For help with the vocab, click herehere Listen to the question and reply Für vier Nächte,
Sprechen You have 5 min to prepare and study your notes. Then you will speak for 30 sec about yourself. Include as much information as you can. Some questions.
You need to use your mouse to see this presentation © Heidi Behrens.
You need to use your mouse to see this presentation
You need to use your mouse to see this presentation.
Wo ist der Hund? Do not run the slide show.
Institut für Informationssysteme Technische Universität Braunschweig Title John Doe Subtitle.
Variable IWV field. IWV and its residuum IWV and res 2 animations Click on the right image and see only the IWV field animation Click on the left and.
Deutsch lernen; Deutsch sprechen?
Los! Sprich sie doch an! (Gute Fahrt 2 - Kursbuch Seite 12 - Übungsheft Seite 5 Schüler-CD Audiospur 2 - Lehrer-CD 1 Audiospur 2)
Willst du mich als Freund hinnzufügen?
TITLE OF THE PRESENTATION Subtitle of a presentation Mr. John Q. Public, location, 14/03/2012.
Was fragt Till?. Edit the text with your own short phrases. To change a sample image, select a picture and delete it. Now click the Pictures icon in each.
Was wollen sie denn wissen?
Parts of the body in German for Year 5
Weak pushover verbs..... lieben kaufen spielen suchen....are verbs that do exactly as they are told. They stick to a regular pattern that does not change!
I will be able to use the accusative pronouns in a sentence (Buch Seite 200)
Es schüttet wie aus Eimern.
You need to use your mouse to see this presentation © Heidi Behrens.
You need to use your mouse to see this presentation © Heidi Behrens.
The Journey to America… The Immigrant Experience.
You need to use your mouse to see this presentation.
Edit the text with your own short phrases. The animation is already done for you; just copy and paste the slide into your existing presentation. To change.
You need to use your mouse to see this presentation © Heidi Behrens.
You need to use your mouse to see this presentation © Heidi Behrens.
Gregor Graf Oracle Portal (Part of the Oracle Application Server 9i) Gregor Graf (2001,2002)
Großvater Großmutter Großvater Großmutter Tante/Onkel Vater Mutter.
Die Hausaufgaben: Machen Sie auf S. 62 Ü.1
G Stunde DEUTSCH 1.  Unit: Family & homeFamilie & Zuhause  Objectives:  Phrases about date, weather and time-telling  Family and family relations.
B LOCKED DAY 1 OBJECTIVES: To consolidate vocabulary and structures within the theme of DIE UMWELT To further practise the techniques used in the prose.
Folder checken Ratschläge (advice) für zukünftige (future) Schüler, wenn du die das letzte mal nicht gemacht hast (if you did not have time for this last.
Edit the text with your own short phrases. To change the sample image, select the picture and delete it. Now click the Pictures icon in the placeholder.
Your Logo Presentation Title Presentation Subtitle.
Bezahlen im Restaurant
Interrogatives and Verbs
DAS HÜPFSPIEL.
“Die Eisenbahn hat Stiefel an”, von Waldemar Spender
Dropbox Assignment 3: Leseübung die Umwelt
GIVE A LOOK AT THE FOLLOWING AND SEE WHAT I MEAN.
Subordinating Clause Editing Worksheet
26. Sektionstreffen XHEXP1
Die XFEL Undulator- Intersection aus Sicht des Vakuumsystem
3D CAD für den XFEL Betrieb
Grammatik: waren / hatten
Titel: Quelle: Übungsart: Titel: Quelle: Silbenübung Nina lernt lesen
Rackabschirmung PRR Dennis Lenz December 2012
Wiederholungs- übungen 2. Halbjahr
Schreib-Training Sven Koerber-Abe, 2012.
Auslegung des Transport- und Wartungskonzepts in XHEXP1-Halle
24 März 2015 Aktueller Stand Before you start editing the slides of your talk change to the Master Slide view: Menu button “View”, Master, Slide.
17. Sektionstreffen XHEXP1
erstellt: Dieter Herrmann, DESY- MKK 16. Mai 2014
You need to use your mouse to see this presentation
Stoppuhr-Karten Stoppuhr-Karten
Wie viel Uhr ist es? Telling Time.
Titellayout Untertitel.
The Conversational Past
The Conversational Past
Natürlich und fit durch den Winter
Umsetzung Arbeitgeberzuschuss zur Entgeltumwandlung Kurz-Präsentation
Title Layout Subtitle.
Was kann/ soll/muss man für die Umwelt tun?
 Präsentation transkript:

1. Kick-off meeting Bauablaufplanung Verantwortlicher: Konrad Piorecki (XFEL PSPO) „Individuelle“ Zeitpläne werden zur Verfügung gestellt von: BAU (H. Weißgerber) – oberirdische Gebäude PSPO (G. Wellenreuther / S. Cunis) – XHEXP1 PSPO (T. Haas / S. Cunis) – Photonentunnel TC (J. Hauschildt) – Maschinentunnel / Dumps MKK (D. Herrmann / N. Ngada) – MKK-Installationen TS (B. Becker-de Mos) – Pförtner, Lager usw. Alle Gewerke in Schenefeld sind über genau einen Ansprech- partner anzubinden, so daß sie in KPs Gesamtkoordination auftauchen. Before you start editing the slides of your talk change to the Master Slide view: Menu button “View” > Slide Master: Edit the following items: 1. On the Title slide (second master slide) a) Click to add title of your talk b) Click to add subtitle (conference, location, name of the speaker, date) 2. On the Slide Master (first master slide) a) The 1st row in the violet header: Delete the existent text and write the title of your talk into this text field b) The 2 rows in the footer area: Delete the text and write the information regarding your talk (same as on the Title Slide) into this text field. Close Master View

2. Laserscan / Planung Estrich Erster Scan wurde von IG bewertet. P.Dost: Es wird ein Scan ohne Wasserflächen benötigt, um eine realistische Vorplanung machen zu können. Dafür müsste das Wasser vom Boden entfernt werden. H.-J. Christ: Braucht man für Ausschreibung nicht.  Wird noch geklärt, P. Dost im Urlaub. Parallel wird T. Haas konkrete Abstände im bestehenden Laserscan-Modell mit den CAD-Modellen abgleichen.

3. Hüttenbau / Infrastruktur Platzierung der Infrastruktur schreitet voran Baudynamiker Dr. Heiland wg. Vibrationen hinzugezogen. Möglichkeiten: Massive Stahlbauweise (30cm dicke Säulen usw.) für Laserhütten Kalksandsteinmauerwerk + Betondecke

4. Nifty-Lift / Zugangskonzept Bilder von S. Arslan Beiträge von D. Herrmann / J.-P. Jensen

5. Weitere Themen Change Requests: Fortschritt Safety Betriebsraum? Versetzung Treppen SASE1 Abschneiden der Gallery bei SASE3 wird überlegt MPS-Raum

MPS-safety room layout