PETRA III – Recommissioning.

Slides:



Advertisements
Ähnliche Präsentationen
Beam Based Alignment von Quadrupol-Magneten in den HERA Bögen
Advertisements

RICHTIG ODER FALSCH ?.
VUV-FEL Inbetriebnahme
Strahlungsquelle ELBE Laser Power and Pulse Energy Micro- Pulse GunLaser necessary Laser project Q.E.Q bunch I mean P mean E pulse P mean E pulse ELBE.
Institut für Angewandte Mikroelektronik und Datentechnik Fachbereich Elektrotechnik und Informationstechnik, Universität Rostock Spezielle Anwendungen.
Dumpline Status We have a leak of ~10 -4 mbar in the section inside the concrete shielding The leak is likely to be at a flange connection of the BPM (Ti/SS.
Forschungszentrum Jülich In der Helmholtz-Gemeinschaft Rolf Stassen IKP/ COSY Darmstadt 1 Status report HESR 1: RF Cavity.
| DC-IAP/SVC3 | © Bosch Rexroth Pneumatics GmbH This document, as well as the data, specifications and other information set forth in.
Deutsch Eins Kapitel Guten Morgen! Heute ist Mittwoch! Das Ziel: Conjugate,,sollen Talk about which food items you want to buy.
Deutsch II Frau Spampinato
Tage der Woche German Early Level Montag Dienstag Mittwoch Donnerstag
Deutsch Eins
Power Supplies at BESSY II
Institut für Angewandte Mikroelektronik und Datentechnik Course and contest Results of Phase Selected Topics in VLSI Design (Module 24513) ©
Vocational College Business and Administration.
Der LHC Beschleuniger - DPG - Bonn 1 Drawing by Sergio Cittolin Der LHC Beschleuniger: Herausforderungen auf dem Weg zu Teilchenkollisionen.
Institut für Angewandte Mikroelektronik und Datentechnik Phase 5 Architectural impact on ASIC and FPGA Nils Büscher Selected Topics in VLSI Design (Module.
PETRA III – Recommissioning.
Institut für Angewandte Mikroelektronik und Datentechnik Course and contest Results of Phase 4 Nils Büscher Selected Topics in VLSI Design (Module 24513)
Beam Dynamics Meeting March Professur für Theoretische Elektrotechnik und Numerische Feldberechnung Sebastian Lange Simulation of Longitudinal.
Kapitel 4 Alles für die Schule Lernziel: Sequencing events.
Magnetmessungen der PDE-Magnete Joachim Keil PETRA III-Meeting,
16 April 2015 | TU Darmstadt | Fachbereich 18 | Institut Theorie Elektromagnetischer Felder | Uwe Niedermayer | 1 Single Beam Collective Effects Impedances.
FTS usage at GridKa Forschungszentrum Karlsruhe GmbH
Arbeiten in einem agilen Team mit VS & TFS 11
Institut für Angewandte Mikroelektronik und Datentechnik Results of Phase 4: Layout for ST65 technology by Christoph Niemann Selected Topics.
3rd Review, Vienna, 16th of April 1999 SIT-MOON ESPRIT Project Nr Siemens AG Österreich Robotiker Technische Universität Wien Politecnico di Milano.
Nachweis von B 0 s -Oszillationen mit dem ATLAS Detektor am LHC B. Epp 1, V.M. Ghete 2, E. Kneringer 1, D. Kuhn 1, A. Nairz 3 1 Institut für Experimentalphysik,
Nuklearmedizinsche Klinik und Poliklinik Klinikum rechts der Isar Technische Universität München Image reconstruction, MR-based attenuation correction,
The Journey to America… The Immigrant Experience.
Studentenstreik 2009, 2010 in Deutschland Part 1: Studiengebühren.
Unterwegs.
Gregor Graf Oracle Portal (Part of the Oracle Application Server 9i) Gregor Graf (2001,2002)
Observe protection mark to ISO Moeller House Hamburg /Hinrichsen-Pschunder / 2008 Welcome Welcome to today’s presentation: Using HPL 2007/2008 Wiring.
Memorisation techniques
WILLKOMMEN. By the end of today’s lesson You will know where to find some important information in the text book You will know what is expected of you.
Prof. Peter Mustermann | Institut xxxxx | Seite 1 Dr. Lothar Naumann | Institute of Radiation Physics | Timing RPC for prompt gamma.
Money rules the medicine?! A presentation by Jan Peter Hoffmann European healthcare systems in comparison.
1Crypto AG / P_M_HC-2650-Course-Notes-d_0833_rd.PPT Training and Education HC-2650 Kursunterlagen.
Tobias Hoffmann SIS18-BPM-System. Tobias Hoffmann Einführung Status Hardware Status Software Ausblick Agenda.
Technische Universität München Alexander Neidhardt Forschungseinrichtung Satellitengeodäsie 1 Concepts for remote control of VLBI-telescopes: on the way.
Folder checken Ratschläge (advice) für zukünftige (future) Schüler, wenn du die das letzte mal nicht gemacht hast (if you did not have time for this last.
Mitglied der Helmholtz-Gemeinschaft Questions to HESR 6 th March 2012 PANDA-meetingDieter Prasuhn.
Kanton Basel-Stadt Howto crash a sequencer …and a path to get a difficult package to work APP-V Swissgroup / Daniel Müller.
Workshop 1 Getting Started 2016 Boris Wylutzki
The IT–Information System
Volume 1, Chapter 8.

High-beta Experiment on
Englisch Grundlagen, Modal Verbs
Hoch-beta Experiment am
Process and Impact of Re-Inspection in NRW
Deutsch I Kapitel 3: Hobbys Frau Spampinato
24 März 2015 Aktueller Stand Before you start editing the slides of your talk change to the Master Slide view: Menu button “View”, Master, Slide.
Das Machine Protection System (MPS) für Petra
Ergonomie und Bedienbarkeit
CERN – TUD – GSI Webmeeting
= 8,7 m € = 121 m € Total Transnationality = 235 m € = 3,1 m €
Ferrite Material Modeling (1) : Kicker principle
Multiturninjektion SIS18 einstellen
Collaborative Webmeeting November 24th, 2010 Geneve / Darmstadt
You need to use your mouse to see this presentation
If you feel that the resources that I have created have helped you save time and/or money, please consider supporting the work that I do by doing your.
Official Statistics Web Cartography in Germany − Regional Statistics, Federal and European Elections, Future Activities − Joint Working Party meeting.
CSL211 Computer Architecture
Practical Exercises and Theory
Niedersächsisches Ministerium
- moodle – a internet based learning platform
 Präsentation transkript:

PETRA III – Recommissioning. Plans PETRA III Team DESY PETRA III meeting Status january, 2015 1 1

PETRA III Extension, North 2015: Beam lines 64 + 65 2

Meeting Jan 05, 2015 Schedule Update 3

Schedule Jan 2015, Status Nov/Dec 2015 Project meeting Nov 13, 2014 Test Polaritaeten ? Ejektion aus DESY ? Installation Undulatoren PU08 bis 5 .Dez. PU02 Jan. 2015 PU64 / 65 Service Week April 2015 ? PU08 PU02 ??? 4

Recommissioning Schedule 2015, Status Aug. 15, 2014 15.08.2014 Discussion with FS, User Run 30.03.2015, External User 27.04.2015 5

User Run – Filling pattern S:\user\groups\has\ohseeck\public\2015 6

Meeting Jan 19, 2015 Schichtplan 7

Commissioning with Beam Check diagnostics current monitors, test signals scopes (triggers, software integration) screen monitors BPMs Check magnet server set power supplies polarity check of all magnet 3 shifts Cycle the magnets 4 shifts new files massa oben, unten start file Demagnetize the PQK, PQL, … magnets in the Extension region corrector settings from the last file (injection  wiggler section North, New Octant some work during power supply commissioning Transfer line 2 shifts Eject beam from DESY into the the E-Weg modified quadrupoles ! 8

Commissioning with Beam (cont.) First turn steering  stored beam 9 shifts kicker, septa settings (any changes ?, new pulsers) rf frequency bunch marker system timing system orbit correction chromaticity rf phases Accumulation, multi bunch injection 3 shifts beam current < 5 mA check vacuum pressure Basic Optic checks 2+2 shifts aperture (two orthogonal coils) bumps (extension section) dynamic aperture (kicker) Beam Based Alignment (Extension region) ORM chromaticity, coupling 9

Commissioning with Beam (cont.) MBFB basic set-up 2 shifts goal : I > 20 mA longt. FB transverse FB timing system Optics checks (20 mA) 2 + 3 shifts (2 blocks) Beam based alignment ORM Correct Optics Verify correction 10

Further Commissioning with Beam Orbit + Dispersion correction (20 mA) 3 shifts Golden orbit (without beam lines) dispersion correction emittance diagnostics Fast Orbit Feedback 3 shifts set-up of the system (matrix) check software check entlastungs server Check machine protection system 2 shifts Dynamic Aperture 1 shift Impedance / Instabilities 2 shifts intensity dependent tune shift ion instabilities ? 11

Further Commissioning with Beam (cont.) New Octant ( 1 mA runs ) 5 shifts Golden orbit (with beam lines) Higher beam intensities 5 shifts goal I > 50 mA different filling schemes RF settings (cavities) New Octant ( 1 mA runs ) 5 shifts Golden orbit (with beam lines) Activation of NEG coating, strips ? Advanced studies, Intensity dependent ORM Study of beam losses, beam halo , Diodes at scrapers 12

Meeting Jan 26, 2015 Einbaupositionen Magnete #004 = spare 13

HF Kopplertausch 20.01.2015 HF Koppler getauscht:  SL_Cy3 und SL_Cy4  14

E-Weg 15

Netzgeraete (ExO) 16

Netzgeraete (NR) 17

Netzgeraete (Acc. view) 18

Fileoperator 19

Fileoperator (including expert files) 20

Meeting Feb 02, 2015 Mo Interlock, FS Di 03.02.2015 Inj. E-Weg Spaetschicht Mi 04.02.2015 Polaritaeten PXN Spaet 21

E-Weg : UGP  PETRA III 22

E-Weg 120 m  PETRA III QE 123 F 131 D 149 F 158 D Schirm 146 m b_x = 13 m, b_y = 70 m Schirm 161 m b_x = 36 m, b_y = 33 m 23

Integration of new components Data SIZE of Groups of power supplies, order of correctors in list, BBA PS: Acc View Libera Server 24

Schichtplan ab naechste Woche Wer Wann Nicht: 25

Meeting Feb 09, 2015 Di 03.02.2015 Inj. E-Weg Polaritaet QE 123, 131, 149, 158 war falsch, Umpolen am Netzgeraet 26 26

Feb 04, 2015 Erdschlusss an zwei PQK Magneten: OR97 OR 89 Isolierung der Schrauben defekt 27

Feb 04, 2015 Feb 04, 2015 Wasserleck SWL 83m, DDW (Differenz Druckwaechter) Feb 05, 2015 falsches Ejektionsfile bei DESY II, beam bump Arbeiten an der Massage Procedure QF, QD rampen zu langsam, (16 bit  18 bit ADC) PETRA III: Polaritaeten im Tunnel Quadrupol Q3_NR_126 (vermutlich im Tunnel verpolt) irrtümlich wurde ein PDA fuer verpolt gehalten, da der   Strom in der Hauptspule zu klein war im Vergleich zur Korrekturwindung Strahl bis Extension Nord 28

Feb 06, 2015 ~ 1 Umlauf in PETRA 29

Feb 07, 2015 Polwender am 08.02.15 erstmal blockiert, do sonst nicht richtig in der massageprozedur beruecksichtigt !  Diskussionsbedarf 30

Feb 08, 2015 Am Sonntag Probleme mit der Steuerung eines Kuehlturms Probleme mit dem DCCT des QF Kreises 31

Status versus plan Check diagnostics Check magnet server current monitors, test signals scopes (triggers, software integration) screen monitors BPMs Check magnet server set power supplies polarity check of all magnet Cycle the magnets new files massa oben, unten start file Demagnetize the PQK, PQL, … magnets in the Extension region corrector settings from the last file (injection  wiggler section North, New Octant Transfer line Eject beam from DESY into the the E-Weg modified quadrupoles ! 32

Plan fuer diese Woche: 9 – 15.02.15 Sichere Massage-Prozedur Alle Netzgeraete bereit First turn steering Strahl speichern First turn steering  stored beam 9 shifts kicker, septa settings (any changes ?, new pulsers) rf frequency bunch marker system timing system orbit correction chromaticity rf phases 33

Further steps Accumulation, multi bunch injection 3 shifts beam current < 5 mA check vacuum pressure orbit correction Basic Optic checks 2+2 shifts aperture (two orthogonal coils) bumps (extension section) dynamic aperture (kicker) Beam Based Alignment (Extension region) ORM chromaticity, coupling 34

Meeting Feb 16, 2015 Nachtrag: Aenderung der Massage Prozedure, wegen Limitierung am Dipolnetzgeraet fuer die Extension Nord und Ost PETRA Massage: PQK werden extra massiert !   Massage PETRA+Korrektoren+EWeg Massage PETRA nur Extensiom PQK PETRA Sendern: Einsenderbetrieb Alle Cavities sind am Sender Süd Links angeschlossen ! Probleme Klystron Sued Rechts 35 35

NN 36

First stored beam Feb 13, end of late shift 37 37

Feb 14, Measurements with stored beam QA3_NOR_70. 38

Feb 14, 2015 Check of magnet current in the tunnel 39 39

Feb 15, restore correct settings of quads 40 40

Feb 15 / 16 orbit correction + first accumulation 41 41

Monday, Feb 16 Interlock text experiments Morning: TueV Interlock test FS Fix problems with power supply electronics 42 42

Feb 16, 5 mA at end of late shift 43 43

Commissioning of Feedback Systems Feb 17 : transverse feedback + tune measurement Feb 18 : longt. feedback transverse feedback (problems solved) 44 44

Investigation of beam optics Feb 17 : 45 45

Beam Optics and BBA Feb 17 : 46 46

BBA, Feb 19 Ost oder Nord ? 47 47

BBA, Feb 20 48 48

BBA, Feb 20 (cont.) 49 49

BPM Feb 17 : Feb 18 : 50 50

Feb 19 BPM Libera electronics settings for different filling pattern 51 51

Feb 20 BPM 52 52

Feb 17 / 18: Windows restart / Verdunkelung 53 53

Magnets 54 54

Software 55 55

Software (cont.) 56 56

Software (cont.) 57 57

Software (cont.) 58 58

Feb 20 59 59

Wochenplan 23 – 27.02.15 BBA Power supply electronics Orbit correction Dispersion correction ORM Fast orbit feedback Aperture scans, extension Chromaticity Dynamic Aperture Collimator Settings Higher Intensities > 50 mA Power supply electronics Software File operator configuration (massage) 60 60

Meeting 02.03.2015 61 61

Last week BBA Orbit correction (Java Programm, finally working) Dispersion correction ORM (Optics corrected on Friday) Aperture scans, extension Chromaticity Dynamic Aperture Collimator Settings Software (Magnet server) File operator configuration (massage) Higher Intensities > 50 mA (during the weekend 60 mA) Emittance diagnostics 62 62

This week, 02.03 – 06.03.15 Dynamic Aperture Tune shift with intensity BBA Dispersion correction (bump in east ?) Optics correction, ORM (2nd iteration) Fast orbit feedback Aperture scans Higher Intensities > 60 mA (different filling pattern) 63 63

Meeting 09.03.2015 Last week 2.3.15 – 8.3.15 : 2.3.15 Wartungszeit: Messungen MKK Wasser 64 64

Test Fast Orbit Feedback, not yet working (4.3.15, late shift) Last week: 2.3. – 8.3.15 Work on software (server, PSC), client (Orbitcorrection, Dispersioncorrection) Chromaticity correction , S1, S3, limit set to 480 A Beam life time different filling pattern Scraper studies (J. Keil, J-L. Revol), New configuration of scraper software ! Vacuum lifetime Compensation of coupling Tune shift with intensity Aceptance measurement Aperture scan Zell 7 + 8 (5.3.15) Test Fast Orbit Feedback, not yet working (4.3.15, late shift) 1 mA test runs together with the Beamlines, close undulators PU10, PU07, PU04 65 65

ESRF Orange book: http://www.esrf.eu/Apache_files/Upgrade/ESRF-orange-book.pdf Scraper studies at PETRA III: J.-L. Revol + J. Keil 66 66

BBA Data PXN 17.02.15 67 67

BBA PXN 19.02.15 68 68

PXN Vermessung 9.3.15 PU64/65: Kammer liegt gegen Strahlsollhöhe zu tief 0.5 m 0.4 mm im Quad 0.2 mm 0.5 mm Abweichung innerhalb der Kammer 0.3 mm 69 69

This week 9.3 – 13.3.15 Software, Can bus configuration 1 mA runs Di, … ab 8 h – 13 h FOFB ??? Mi Momentum acceptance / emittanz vert. Do ORM Optik 2. Iteration Di HF, 40 Bunche 80 mA, Mo + Fr nachmittag 70 70

Meeting 16.03.2015 Last week 9.3.15 – 15.3.15 : 9.3.15 Wartungszeit 80 mA, 40 Bunch 10.3.15 PU02/03, PU10 Test FOFB ORM (2nd iteration) 11.3.15 PU01 ZZ Strommonitor IMA-SOR67 Vert. Emittanzmessung (Interferometer) Vakuumlebensdauer (Fit aus vert. Emittanz) Ausbacken 80 mA, 40 Bunche 12.3.15 1 mA run PU1, PU02/03, PU07, PU10 Lebensdauer / HF Spannunf, Momentum Acceptance 13.03.15 Probleme bei der Injektion mit geschlossenen Undulatoren HF-Messschicht, Spannungskalibration etc. 13-15.3.15 80 mA, 60 Bunche 71 71

Last week from the Logbook: 72 72

Last week from the Logbook: 73 73

This week 16.3 – 20.3.15 Friday 13.3:   50mA, first radiation inspection at P02/P03. Week 16. to 20th March Monday:   - Tuesday:  starting 1mA at Sector 6 (P08/P09) thereafter 1mA for Sector 9 (P13/P14). Wednesday: final radiation inspection P01, P03 Thursady: final radiation inspection P08/P09 Friday:   final radiation inspection P13/P14 As soon as possible Sector 8 (P11,P12) 1mA and radiation survay, after Easter : Sector 4 (P05/P06) 1mA and radiation survey. 74 74

This week 16.3 – 20.3.15 Optik Korrektur ? 75 75

NN Software, NNNNNN 76 76

Thank you for your attention ! 77