PETRA III – Recommissioning.

Slides:



Advertisements
Ähnliche Präsentationen
Beam Based Alignment von Quadrupol-Magneten in den HERA Bögen
Advertisements

RICHTIG ODER FALSCH ?.
VUV-FEL Inbetriebnahme
Strahlungsquelle ELBE Laser Power and Pulse Energy Micro- Pulse GunLaser necessary Laser project Q.E.Q bunch I mean P mean E pulse P mean E pulse ELBE.
Institut für Angewandte Mikroelektronik und Datentechnik Fachbereich Elektrotechnik und Informationstechnik, Universität Rostock Spezielle Anwendungen.
Dumpline Status We have a leak of ~10 -4 mbar in the section inside the concrete shielding The leak is likely to be at a flange connection of the BPM (Ti/SS.
Forschungszentrum Jülich In der Helmholtz-Gemeinschaft Rolf Stassen IKP/ COSY Darmstadt 1 Status report HESR 1: RF Cavity.
Can you think of some KEY phrases which would be useful in multiple contexts? Take 2 minutes with a partner and come up with as many as you can!
Was passt zusammen? Wie sagt man das auf Deutsch?
Internationale Promovierende Promovieren an der Humboldt-Universität zu Berlin Dr. Uta Hoffmann Humboldt-Universität zu.
FINSB01FINSB02FINSB03FINSB04 Phase 2: Phase Burkhalter (Inauguration or Phase 2a): FINSB01FINSB02FINSB03 FINSB01FINSB02FINSB03FINSB04 Phase 3 (some time.
LHC: Status und Ausblick Rüdiger Schmidt - CERN KET November 2003 Bad Honnef On behalf of the CERN staff and the outside collaborators Aussergewöhnliche.
Deutsch Eins Kapitel Guten Morgen! Heute ist Mittwoch! Das Ziel: Conjugate,,sollen Talk about which food items you want to buy.
Beschleunigung und longitudinaler Phasenraum
NARVAL Meeting 12./13. January 2012
SIT-MOON ESPRIT Project Nr st Review, Brussels, 27th of April 1998 slide 1 Siemens AG Österreich Robotiker Technische Universität Wien Politecnico.
Tage der Woche German Early Level Montag Dienstag Mittwoch Donnerstag
Deutsch Eins
Power Supplies at BESSY II
Institut für Angewandte Mikroelektronik und Datentechnik Course and contest Results of Phase Selected Topics in VLSI Design (Module 24513) ©
Vocational College Business and Administration.
Der LHC Beschleuniger - DPG - Bonn 1 Drawing by Sergio Cittolin Der LHC Beschleuniger: Herausforderungen auf dem Weg zu Teilchenkollisionen.
Institut für Angewandte Mikroelektronik und Datentechnik Phase 5 Architectural impact on ASIC and FPGA Nils Büscher Selected Topics in VLSI Design (Module.
Institut für Angewandte Mikroelektronik und Datentechnik Course and contest Results of Phase 4 Nils Büscher Selected Topics in VLSI Design (Module 24513)
PETRA III – Recommissioning.
Beam Dynamics Meeting March Professur für Theoretische Elektrotechnik und Numerische Feldberechnung Sebastian Lange Simulation of Longitudinal.
16 April 2015 | TU Darmstadt | Fachbereich 18 | Institut Theorie Elektromagnetischer Felder | Uwe Niedermayer | 1 Single Beam Collective Effects Impedances.
FTS usage at GridKa Forschungszentrum Karlsruhe GmbH
Arbeiten in einem agilen Team mit VS & TFS 11
Institut für Angewandte Mikroelektronik und Datentechnik Results of Phase 4: Layout for ST65 technology by Christoph Niemann Selected Topics.
Nachweis von B 0 s -Oszillationen mit dem ATLAS Detektor am LHC B. Epp 1, V.M. Ghete 2, E. Kneringer 1, D. Kuhn 1, A. Nairz 3 1 Institut für Experimentalphysik,
Gregor Graf Oracle Portal (Part of the Oracle Application Server 9i) Gregor Graf (2001,2002)
EUROPÄISCHE GEMEINSCHAFT Europäischer Sozialfonds EUROPÄISCHE GEMEINSCHAFT Europäischer Fonds für Regionale Entwicklung Workpackage 5 – guidelines Tasks.
Observe protection mark to ISO Moeller House Hamburg /Hinrichsen-Pschunder / 2008 Welcome Welcome to today’s presentation: Using HPL 2007/2008 Wiring.
Uwe Niedermayer Institut für Theorie Elektromagnetischer Felder
EUROPÄISCHE GEMEINSCHAFT Europäischer Sozialfonds EUROPÄISCHE GEMEINSCHAFT Europäischer Fonds für Regionale Entwicklung Workpackage 5 – guidelines Tasks.
Prof. Peter Mustermann | Institut xxxxx | Seite 1 Dr. Lothar Naumann | Institute of Radiation Physics | Timing RPC for prompt gamma.
Money rules the medicine?! A presentation by Jan Peter Hoffmann European healthcare systems in comparison.
1Crypto AG / P_M_HC-2650-Course-Notes-d_0833_rd.PPT Training and Education HC-2650 Kursunterlagen.
Tobias Hoffmann SIS18-BPM-System. Tobias Hoffmann Einführung Status Hardware Status Software Ausblick Agenda.
Technische Universität München Alexander Neidhardt Forschungseinrichtung Satellitengeodäsie 1 Concepts for remote control of VLBI-telescopes: on the way.
Folder checken Ratschläge (advice) für zukünftige (future) Schüler, wenn du die das letzte mal nicht gemacht hast (if you did not have time for this last.
Mitglied der Helmholtz-Gemeinschaft Questions to HESR 6 th March 2012 PANDA-meetingDieter Prasuhn.
Wöchentliches Meeting
Workshop 1 Getting Started 2016 Boris Wylutzki
The IT–Information System
Volume 1, Chapter 8.
High-beta Experiment on
Wöchentliches Meeting
Wöchentliches Meeting
Process and Impact of Re-Inspection in NRW
Deutsch I Kapitel 3: Hobbys Frau Spampinato
You need to use your mouse to see this presentation
24 März 2015 Aktueller Stand Before you start editing the slides of your talk change to the Master Slide view: Menu button “View”, Master, Slide.
Das Machine Protection System (MPS) für Petra
Ergonomie und Bedienbarkeit
PETRA III WP PETRA III Feedback Systeme Beschleuniger Betriebsseminar 2008 Grömitz, Jens Klute Klaus Balewski, H.-T. Duhme,
Lernziele: saying what is wrong with you at the doctor’s giving advice
Ferrite Material Modeling (1) : Kicker principle
Multiturninjektion SIS18 einstellen
Collaborative Webmeeting November 24th, 2010 Geneve / Darmstadt
If you feel that the resources that I have created have helped you save time and/or money, please consider supporting the work that I do by doing your.
Official Statistics Web Cartography in Germany − Regional Statistics, Federal and European Elections, Future Activities − Joint Working Party meeting.
CSL211 Computer Architecture
The Conversational Past
OFFICE 365 FOCUS SESSION SHAREPOINT ONLINE 101:LERNE DIE BASICS 19. März 2018 Höhr-Grenzhausen.
Practical Exercises and Theory
- moodle – a internet based learning platform
 Präsentation transkript:

PETRA III – Recommissioning. Plans PETRA III Team DESY PETRA III meeting Status january, 2015 1 1

PETRA III Extension, North 2015: Beam lines 64 + 65 2

Meeting Jan 05, 2015 Schedule Update 3

Schedule Jan 2015, Status Nov/Dec 2015 Project meeting Nov 13, 2014 Test Polaritaeten ? Ejektion aus DESY ? Installation Undulatoren PU08 bis 5 .Dez. PU02 Jan. 2015 PU64 / 65 Service Week April 2015 ? PU08 PU02 ??? 4

Recommissioning Schedule 2015, Status Aug. 15, 2014 15.08.2014 Discussion with FS, User Run 30.03.2015, External User 27.04.2015 5

User Run – Filling pattern S:\user\groups\has\ohseeck\public\2015 6

Meeting Jan 19, 2015 Schichtplan 7

Commissioning with Beam Check diagnostics current monitors, test signals scopes (triggers, software integration) screen monitors BPMs Check magnet server set power supplies polarity check of all magnet 3 shifts Cycle the magnets 4 shifts new files massa oben, unten start file Demagnetize the PQK, PQL, … magnets in the Extension region corrector settings from the last file (injection  wiggler section North, New Octant some work during power supply commissioning Transfer line 2 shifts Eject beam from DESY into the the E-Weg modified quadrupoles ! 8

Commissioning with Beam (cont.) First turn steering  stored beam 9 shifts kicker, septa settings (any changes ?, new pulsers) rf frequency bunch marker system timing system orbit correction chromaticity rf phases Accumulation, multi bunch injection 3 shifts beam current < 5 mA check vacuum pressure Basic Optic checks 2+2 shifts aperture (two orthogonal coils) bumps (extension section) dynamic aperture (kicker) Beam Based Alignment (Extension region) ORM chromaticity, coupling 9

Commissioning with Beam (cont.) MBFB basic set-up 2 shifts goal : I > 20 mA longt. FB transverse FB timing system Optics checks (20 mA) 2 + 3 shifts (2 blocks) Beam based alignment ORM Correct Optics Verify correction 10

Further Commissioning with Beam Orbit + Dispersion correction (20 mA) 3 shifts Golden orbit (without beam lines) dispersion correction emittance diagnostics Fast Orbit Feedback 3 shifts set-up of the system (matrix) check software check entlastungs server Check machine protection system 2 shifts Dynamic Aperture 1 shift Impedance / Instabilities 2 shifts intensity dependent tune shift ion instabilities ? 11

Further Commissioning with Beam (cont.) New Octant ( 1 mA runs ) 5 shifts Golden orbit (with beam lines) Higher beam intensities 5 shifts goal I > 50 mA different filling schemes RF settings (cavities) New Octant ( 1 mA runs ) 5 shifts Golden orbit (with beam lines) Activation of NEG coating, strips ? Advanced studies, Intensity dependent ORM Study of beam losses, beam halo , Diodes at scrapers 12

Meeting Jan 26, 2015 Einbaupositionen Magnete #004 = spare 13

HF Kopplertausch 20.01.2015 HF Koppler getauscht:  SL_Cy3 und SL_Cy4  14

E-Weg 15

Netzgeraete (ExO) 16

Netzgeraete (NR) 17

Netzgeraete (Acc. view) 18

Fileoperator 19

Fileoperator (including expert files) 20

Meeting Feb 02, 2015 Mo Interlock, FS Di 03.02.2015 Inj. E-Weg Spaetschicht Mi 04.02.2015 Polaritaeten PXN Spaet 21

E-Weg : UGP  PETRA III 22

E-Weg 120 m  PETRA III QE 123 F 131 D 149 F 158 D Schirm 146 m b_x = 13 m, b_y = 70 m Schirm 161 m b_x = 36 m, b_y = 33 m 23

Integration of new components Data SIZE of Groups of power supplies, order of correctors in list, BBA PS: Acc View Libera Server 24

Schichtplan ab naechste Woche Wer Wann Nicht: 25

Meeting Feb 09, 2015 Di 03.02.2015 Inj. E-Weg Polaritaet QE 123, 131, 149, 158 war falsch, Umpolen am Netzgeraet 26 26

Feb 04, 2015 Erdschlusss an zwei PQK Magneten: OR97 OR 89 Isolierung der Schrauben defekt 27

Feb 04, 2015 Feb 04, 2015 Wasserleck SWL 83m, DDW (Differenz Druckwaechter) Feb 05, 2015 falsches Ejektionsfile bei DESY II, beam bump Arbeiten an der Massage Procedure QF, QD rampen zu langsam, (16 bit  18 bit ADC) PETRA III: Polaritaeten im Tunnel Quadrupol Q3_NR_126 (vermutlich im Tunnel verpolt) irrtümlich wurde ein PDA fuer verpolt gehalten, da der   Strom in der Hauptspule zu klein war im Vergleich zur Korrekturwindung Strahl bis Extension Nord 28

Feb 06, 2015 ~ 1 Umlauf in PETRA 29

Feb 07, 2015 Polwender am 08.02.15 erstmal blockiert, do sonst nicht richtig in der massageprozedur beruecksichtigt !  Diskussionsbedarf 30

Feb 08, 2015 Am Sonntag Probleme mit der Steuerung eines Kuehlturms Probleme mit dem DCCT des QF Kreises 31

Status versus plan Check diagnostics Check magnet server current monitors, test signals scopes (triggers, software integration) screen monitors BPMs Check magnet server set power supplies polarity check of all magnet Cycle the magnets new files massa oben, unten start file Demagnetize the PQK, PQL, … magnets in the Extension region corrector settings from the last file (injection  wiggler section North, New Octant Transfer line Eject beam from DESY into the the E-Weg modified quadrupoles ! 32

Plan fuer diese Woche: 9 – 15.02.15 Sichere Massage-Prozedur Alle Netzgeraete bereit First turn steering Strahl speichern First turn steering  stored beam 9 shifts kicker, septa settings (any changes ?, new pulsers) rf frequency bunch marker system timing system orbit correction chromaticity rf phases 33

Further steps Accumulation, multi bunch injection 3 shifts beam current < 5 mA check vacuum pressure orbit correction Basic Optic checks 2+2 shifts aperture (two orthogonal coils) bumps (extension section) dynamic aperture (kicker) Beam Based Alignment (Extension region) ORM chromaticity, coupling 34

Meeting Feb 16, 2015 Nachtrag: Aenderung der Massage Prozedure, wegen Limitierung am Dipolnetzgeraet fuer die Extension Nord und Ost PETRA Massage: PQK werden extra massiert !   Massage PETRA+Korrektoren+EWeg Massage PETRA nur Extensiom PQK PETRA Sendern: Einsenderbetrieb Alle Cavities sind am Sender Süd Links angeschlossen ! Probleme Klystron Sued Rechts 35 35

NN 36

First stored beam Feb 13, end of late shift 37 37

Feb 14, Measurements with stored beam QA3_NOR_70. 38

Feb 14, 2015 Check of magnet current in the tunnel 39 39

Feb 15, restore correct settings of quads 40 40

Feb 15 / 16 orbit correction + first accumulation 41 41

Monday, Feb 16 Interlock text experiments Morning: TueV Interlock test FS Fix problems with power supply electronics 42 42

Feb 16, 5 mA at end of late shift 43 43

Commissioning of Feedback Systems Feb 17 : transverse feedback + tune measurement Feb 18 : longt. feedback transverse feedback (problems solved) 44 44

Investigation of beam optics Feb 17 : 45 45

Beam Optics and BBA Feb 17 : 46 46

BBA, Feb 19 Ost oder Nord ? 47 47

BBA, Feb 20 48 48

BBA, Feb 20 (cont.) 49 49

BPM Feb 17 : Feb 18 : 50 50

Feb 19 BPM Libera electronics settings for different filling pattern 51 51

Feb 20 BPM 52 52

Feb 17 / 18: Windows restart / Verdunkelung 53 53

Magnets 54 54

Software 55 55

Software (cont.) 56 56

Software (cont.) 57 57

Software (cont.) 58 58

Feb 20 59 59

Wochenplan 23 – 27.02.15 BBA Power supply electronics Orbit correction Dispersion correction ORM Fast orbit feedback Aperture scans, extension Chromaticity Dynamic Aperture Collimator Settings Higher Intensities > 50 mA Power supply electronics Software File operator configuration (massage) 60 60

Meeting 02.03.2015 61 61

Last week BBA Orbit correction (Java Programm, finally working) Dispersion correction ORM (Optics corrected on Friday) Aperture scans, extension Chromaticity Dynamic Aperture Collimator Settings Software (Magnet server) File operator configuration (massage) Higher Intensities > 50 mA (during the weekend 60 mA) Emittance diagnostics 62 62

This week, 02.03 – 06.03.15 Dynamic Aperture Tune shift with intensity BBA Dispersion correction (bump in east ?) Optics correction, ORM (2nd iteration) Fast orbit feedback Aperture scans Higher Intensities > 60 mA (different filling pattern) 63 63

Thank you for your attention ! 64