Post-processing methods for probabilistic convection forecasts based on the limited-area ensemble COSMO-DE-EPS of DWD Lars Wiegand, Christoph Gebhardt.

Slides:



Advertisements
Ähnliche Präsentationen
Service Oriented Architectures for Remote Instrumentation
Advertisements

PRESENTATION HEADLINE
E-Solutions mySchoeller.com for Felix Schoeller Imaging
R. Zankl – Ch. Oelschlegel – M. Schüler – M. Karg – H. Obermayer R. Gottanka – F. Rösch – P. Keidler – A. Spangler th Expert Meeting Business.
An OGC Standards Driven Geodata Online Access for DLRs National Remote Sensing Data Library (NRSDL) Torsten Heinen German Remote Sensing Data Center (DLR/DFD)
1 | R. Steinbrecher | IMK-IFU | KIT – die Kooperation von Forschungszentrum Karlsruhe GmbH und Universität Karlsruhe (TH) Natural Sources SNAP11.
Peter Marwedel TU Dortmund, Informatik 12
Aufgabenbesprechung Programming Contest. Order 7 Bo Pat Jean Kevin Claude William Marybeth 6 Jim Ben Zoe Joey Frederick Annabelle 0 SET 1 Bo Jean Claude.
C. Kottmeier, C. Hauck, G. Schädler, N. Kalthoff
NUMEX – Numerical experiments for the GME Fachhochschule Bonn-Rhein-Sieg Wolfgang Joppich PFTOOL - Precipitation forecast toolbox Semi-Lagrangian Mass-Integrating.
Wozu die Autokorrelationsfunktion?
Institut für Verkehrsführung und Fahrzeugsteuerung > Technologien aus Luft- und Raumfahrt für Straße und Schiene Automatic Maneuver Recognition in the.
Institut für Verkehrsführung und Fahrzeugsteuerung > Technologien aus Luft- und Raumfahrt für Straße und Schiene Driving Manoeuvre Recognition > 19. Januar.
Insulin pump therapy in adults allows metabolic control at lower rates of hypoglycemia along with reduced insulin doses – results from the nationwide DPV-survey.
SOLNET Milan Optimization of the air-to-water heat exchanger configuration for water preheating in open district heating nets Janybek Orozaliev.
Three minutes presentation I ArbeitsschritteW Seminar I-Prax: Inhaltserschließung visueller Medien, Spree WS 2010/2011 Giving directions.
Thomas Herrmann Software - Ergonomie bei interaktiven Medien Step 6: Ein/ Ausgabe Instrumente (Device-based controls) Trackball. Joystick.
Institut für Wasserbau Stuttgart Geodätisches Institut Stuttgart Institut für Meteorologie und Klimaforschung IMK-IFU SPP 1257 DIRECT WATERBALANCE An interdisciplinary.
Fachabteilung 16A Überörtliche Raumplanung Cross border co-operation from the view of a public administration unit.
Methods Fuzzy- Logic enables the modeling of rule based knowledge by the use of fuzzy criteria instead of exact measurement values or threshold values.
Institut für Umweltphysik/Fernerkundung Physik/Elektrotechnik Fachbereich 1 SADDU June 2008 S. Noël, K.Bramstedt,
Institut für Umweltphysik/Fernerkundung Physik/Elektrotechnik Fachbereich 1 Pointing Meeting Nov 2006 S. Noël IFE/IUP Elevation and Azimuth Jumps during.
Weather forecasts and crisis management Michael Staudinger
Integration of renewable energies: competition between storage, the power grid and flexible demand Thomas Hamacher.
Case Study Session in 9th GCSM: NEGA-Resources-Approach
Die Zeit (TIME) Germans are on military time which is 1-24
Institut AIFB, Universität Karlsruhe (TH) Forschungsuniversität gegründet 1825 Towards Automatic Composition of Processes based on Semantic.
Institut für Solare Energieversorgungstechnik Verein an der Universität Kassel Bereich Energetische Biomassenutzung, Hanau Dipl.-Ing. J. Müller Bioturbine,
| DC-IAP/SVC3 | © Bosch Rexroth Pneumatics GmbH This document, as well as the data, specifications and other information set forth in.
BAS5SE | Fachhochschule Hagenberg | Daniel Khan | S SPR5 MVC Plugin Development SPR6P.
Z Corp Customer Examples
Ich möchte ein Eisberg sein. Last time … 3 icebergs Triangels Unique connections Ich möchte ein Eisberg sein
Alp-Water-Scarce Water Management Strategies against Water Scarcity in the Alps 4 th General Meeting Cambery, 21 st September 2010 Water Scarcity Warning.
Deutsch 1 G Stunde. Donnerstag, der 25. Oktober 2012 Deutsch 1, G Stunde Heute ist ein B- Tag Unit: Family & homeFamilie & Zuhause Objectives: Phrases.
Deutsch 1 G Stunde. Donnerstag, der 18. Oktober 2012 Deutsch 1, G Stunde Heute ist ein E- Tag Unit: Family & homeFamilie & Zuhause Objectives: Phrases.
Deutsch 1 G Stunde. Donnerstag, der 18. Oktober 2012 Deutsch 1, G Stunde Heute ist ein D- Tag Unit: Family & homeFamilie & Zuhause Objectives: Phrases.
INTAKT- Interkulturelle Berufsfelderkundungen als ausbildungsbezogene Lerneinheiten in berufsqualifizierenden Auslandspraktika DE/10/LLP-LdV/TOI/
Institut für Umweltphysik/Fernerkundung Physik/Elektrotechnik Fachbereich 1 K. Bramstedt, L. Amekudzi, J. Meyer IFE/IUP Tangent heights in occultation.
Fusszeilentext – bitte in (Ansicht – Master – Folienmaster, 1. Folie oben) individuell ändern! Danach wieder zurück in Normalansicht gehen! 1 OTR Shearography.
Faculty of Public Health Department of Health Economics and Management University of Bielefeld WP 3.1 and WP 4.1: Macrocost EUprimecare Plenary Meeting.
Deutsch 1 G Stunde. Unit: Introduction to German & Germany Objectives: Phrases about date, weather and time-telling Talking about grades Reflection on.
Tage der Woche German Early Level Montag Dienstag Mittwoch Donnerstag
Staatsballett Berlin Ein Verbesserungskonzept für den Social- Media Auftritt Your picture here.
Impairments in Polarization-Multiplexed DWDM Channels due to Cross- Polarization Modulation Marcus Winter Christian-Alexander Bunge Klaus Petermann Hochfrequenztechnik-Photonik.
Berner Fachhochschule Hochschule für Agrar-, Forst- und Lebensmittelwissenschaften HAFL Recent activities on ammonia emissions: Emission inventory Rindvieh.
4th Symposium on Lidar Atmospheric Applications
Ein Projekt des Technischen Jugendfreizeit- und Bildungsvereins (tjfbv) e.V. kommunizieren.de Blended Learning for people with disabilities.
Uncertainty in feedback mechanisms in climate change projections
Talking about yourself
Cross-Polarization Modulation in DWDM Systems
Ulrike Romatschke, Robert Houze, Socorro Medina
Lehrstuhl für Energiewirtschaft und Anwendungstechnik Prof. Dr.-Ing. U. Wagner, Prof. Dr. rer. nat. Th. Hamacher Integration of renewable energies: competition.
3rd Review, Vienna, 16th of April 1999 SIT-MOON ESPRIT Project Nr Siemens AG Österreich Robotiker Technische Universität Wien Politecnico di Milano.
Berner Fachhochschule Hochschule für Agrar-, Forst- und Lebensmittelwissenschaften HAFL 95% der Ammoniakemissionen aus der Landwirtschaft Rindvieh Pflanzenbau.
Wind Energy in Germany 2004 Ralf Christmann, BMU Joachim Kutscher, PTJ
HRM A – G. Grote ETHZ, WS 06/07 HRM A: Work process design Overview.
Ex_1: Cannabis induziert Schizophrenie? Fakten: 1. Cannabis Konsum korreliert mit doppeltem Risiko im späteren Leben mit Schikzophrenie diagnostiziert.
Sentence Structure Subject and verb are always together. Subject and verb are always together. Subject and verb must agree Subject and verb must agree.
KIT – die Kooperation von Forschungszentrum Karlsruhe GmbH und Universität Karlsruhe (TH) Vorlesung Knowledge Discovery - Institut AIFB Tempus fugit Towards.
1 Stevens Direct Scaling Methods and the Uniqueness Problem: Empirical Evaluation of an Axiom fundamental to Interval Scale Level.
Technische Universität München Spatial aspects of the formation of GMO-free or GMO clubs Maarten J. Punt Technische Universität München.
Lehrstuhl für Waldbau, Technische Universität MünchenBudapest, 10./11. December 2006 WP 1 Status (TUM) Bernhard Felbermeier.
Adjective Endings Nominative & Accusative Cases describing auf deutsch The information contained in this document may not be duplicated or distributed.
Selectivity in the German Mobility Panel Tobias Kuhnimhof Institute for Transport Studies, University of Karlsruhe Paris, May 20th, 2005.
Technische Universität München 1 CADUI' June FUNDP Namur G B I The FUSE-System: an Integrated User Interface Design Environment Frank Lonczewski.
Andreas Burger ZENTRUM FÜR MEDIZINISCHE LEHRE RUHR-UNIVERSITÄT BOCHUM Irkutsk October 2012 Report about the lecture "Report of the TEMPUS IV- Project Nr.
OTTO-VON-GUERICKE-UNIVERSITÄT MAGDEBURG Fakultät für Verfahrens- und Systemtechnik Institut für Apparate- und Umwelttechnik INNOVATION AND TECHNICAL PROGRESS:
Experimental Ensembles with the LM/LMK Past and Future Work Susanne Theis.
Needs and use of post processing and model interpretation, examples
QUEST-Meeting, 14. Dez. 2007, Offenbach Parametrisierung der Verdunstung in einem 2-Momenten-Schema Axel Seifert Deutscher Wetterdienst, Offenbach Geschäftsbereich.
 Präsentation transkript:

Post-processing methods for probabilistic convection forecasts based on the limited-area ensemble COSMO-DE-EPS of DWD Lars Wiegand, Christoph Gebhardt German Meteorological Service (DWD), Germany

Content set-up COSMO-DE-EPS EPS convection project methodology observation forecast – probabilistic products (case study) Bayes theorem LASSO data result further researches product design SESAR (Single European Sky) 2

set-up COSMO-DE-EPS model chain at DWD COSMO-DE: 2.8 km further details: see talk SCI-PS166.01 Susanne Theis: Tue 13:30, room 524A set-up COSMO-DE-EPS model chain at DWD COSMO-DE: 2.8 km convection-permitting forecast model 50 vertical levels modelrun every 3 hours: + 27 h COSMO-EU: 7 km GME: 20 km

further details: see talk SCI-PS166.01 Susanne Theis: Tue 13:30, room 524A set-up COSMO-DE-EPS COSMO-DE-EPS 20 members further details: see talk SCI-PS166.01 Susanne Theis: Tue 13:30, room 524A 1 2 3 4 5 IFS GME GFS GSM

project „EPS Convection“ predictability of small scale processes with non-linear and stochastic processes (e.g. convection) is strongly limited i.e. leads to strong uncertainty already at short lead times severe events and high impact weather are highly important for warnings in general or in aviation in particular “charakteristics of HIW” and “limited predictability” leads to use of probabilistic estimation of high-resulotion forecasts of deep convection based on COSMO-DE-EPS aims at supporting aviation weather forecasts and general weather warning process at DWD 5

methodology probabilistic products for convective parameters from COSMO-DE-EPS DMO (direct model output) variables as well as direct calculatable variables (e.g. KO-index) from DMO IMO (indirect model output), e.g. thunderstorms produced with regression methods requirements for IMO (thunderstorm) forecasts: observation of IMO (thunderstorm) as predicand  radar + lightning EPS DMO forecasts as predictor(s) 6

observation thunderstorm combination of radar reflectivity and lightning RX product advantages: warning criterias are known within DWD (28, 37, 46, … dBz), high spatial/temporal resolution adaptions: conversion into COSMO-DE grid lightning from NCM network very accurate observations – only 0,02% of all lightnings have errors >2,8km every grid point within 3km gets a distance weighted amount of a lightning measure 7

case study – thunderstorms 28th July 2013

case study – thunderstorms 28th July 2013 9

case study – thunderstorms 28th July 2013 10

case study – thunderstorms 28th July 2013 11

case study – thunderstorms 28th July 2013 12

case study – thunderstorms 28th July 2013

Bayes theorem 1/0 event occurs/does not occur   Bayes theorem 1/0 event occurs/does not occur X = variable from COSMO-DE(-EPS) variables: CAPE, CIN, TWATER, OMEGA, DBZ_CMAX, TOT_PREC period: summer (Apr-Sept) 2012 forecast: 00UTC + 0/6/12/18h based on grid points 14

Bayes theorem variable: TWATER (total water content) forecast: 00UTC + 0h period: summer (Apr-Sept) 2012 15

Bayes theorem variable: TWATER (total water content) forecast: 00UTC + 18h period: summer (Apr-Sept) 2012 16

Bayes theorem variable: DBZ_CMAX (radar reflectivity column maximum) forecast: 00UTC + 12h period: summer (Apr-Sept) 2012 17

Bayes theorem variable: OMEGA (vertical velocity) forecast: 00UTC + 0h period: summer (Apr-Sept) 2012 18

LASSO –. least absolute shrinkage and selection operator LASSO – least absolute shrinkage and selection operator (Tibshirani 1996) search for suitable predictors comparison of predictors (variables (DMO) and their probabilistic products) choose of predictors, which depict the observation best tool: R statistic software (package glmnet + dependences) logistic regression: optimal for extreme values Input/output can be probabilities error measure: RMSE 19

LASSO summer 2012 (40 days) data basis COSMO-DE-EPS forecast: daily 03UTC + 21h 40 days in summer 2012 (22th July – 30th August) 93 variables (CAPE, CIN, T2m, TWATER, TQ, TI, …) EPS products: mean, minimum, maximum 5 days, i.e. 8 calculations observation: 1h radar maximum and lightning sum radar: 16:30 – 17:25 UTC (available every 5 minutes) lightning: 16:30 – 17:29 UTC (exact to the second) 20

LASSO summer 2012 (40 days) result - predictors mean TWATER maximum TQ (Graupel) maximum radar reflectivity (maximum RR in atmospheric column) all 3 variables are amongst the first 5 predictors for the 8 calculations maximum TWATER in 5 out of 8 calculations within the first 5 predictors to check: stability of predictors for longer time periods result just shows the predictors for 8 x 5 days in summer 2012 21

further research LASSO longer time periods  statistical robustness quantiles and probabilities as predictors time offset neighborhood method different synoptical regimes (convective time scale) generation of thunderstorm forecast product from 3 or more predictors 22

generation of consistent, blended probability products for ATC Super-Ensemble Mesoscale Forecast of Convection (SESAR-JU WP11.2.1, lead Meteo France) Objectives To develop ensemble post-processing techniques in order to provide consistent short-range probabilistic NWP products of convective risks across Europe, at the highest possible NWP resolution combination of three convection-permitting ensembles systems. AROME-EPS (MF), COSMO-DE-EPS (DWD) and the UKV-EPS(UKMO) generation of consistent, blended probability products for ATC 2 data phases Summer 2012 (mid July – end August) Spring 2014 (mid April – end June) 23

Example: combined mean radar refelectivity

Thanks for your attention! Comments? Questions?

Supplementary slides Verification summarizes all sorts of situations - also those which are less interesting for the forecaster. Verification does not necessarily tell whether guidance helps the forecaster. 26

product design 27

Direct Model Output (DMO) Zusammenhang Wahrscheinlichkeit(DMO>Schwellenwert)  Ereignis Wahrscheinlichkeiten dieser DMO-Variablen nicht zwingend gut kalibriert Ansatz: Vorhersage “ja” für Wahrscheinlichkeiten(DMO>Schwelle) > A% Bestimme hit rate/ false alarms für verschiedene A Optimales A ist nutzerabhängig! (hit rate/ false alarms) Datenlage der Beobachtungen von DMO oft flächig nicht beobachtbar (CAPE, TWATER, …) Ereignis: Gewitter aus Radar + Blitz 28

Weitere Arbeiten in EPS Konvektion WX getestet: Vorteil: größeres Gebiet: keine Radarmessungen werden verworfen Nachteil: nicht sicher ab wann operationel, wird aller Vorraussicht nicht nachberechnet Programme für abgeleitete Variablen aus DMO Variablen KO-index Convective time scale – Klassifizierung in synoptische/Luftmassengewitter Situationen Erstellung des technischen und fachlichen Rahmens des Fachkonzeptes Studien zu statistischen Eigenschaften der gewählten ‘high-priority’ Variablen CAPE, CIN, dBz_cmax, TWATER, OMEGA@700hPA 29

Beobachtung Gewitter Schwellenwerte für Gewitterklassifikation 30 class radar reflectivity [dbz] lightning strikes [no./15 minutes] associated weather moderate >37 1 moderate rain wind gust up to 7 Bft strong >46 tbd heavy rain (10-25 l/m² in 1h, 20-35 l/m² in 6h) wind gusts 8-10 Bft hail possible (Ø <1,5cm) severe >53 very heavy rain (>25 l/m² in 1h, >35 l/m² in 6h) wind gusts >11 Bft large hail possible (Ø >1,5cm) 30

COSMO-DE 31

Beispiel – Gewitterlage 28. Juli 2013 32

Super-Ensemble Mesoscale Forecast of Convection (SESAR-JU WP11. 2 Super-Ensemble Mesoscale Forecast of Convection (SESAR-JU WP11.2.2, lead Meteo France) Ziel: To develop ensemble post-processing techniques in order to provide consistent short-range probabilistic NWP products of convective risks across Europe, at the highest possible NWP resolution Kombination dreier konvektionserlaubender Ensemblesysteme. AROME-EPS (MF) COSMO-DE-EPS (DWD) UKV-EPS(UKMO) Erstellung von konsistenten (räumlich verschnittenen) Produkten für die Flugsicherung (allerdings nur post-processing)

Modellgebiete 34

SESAR domain Gemeinsames SESAR ‘Modellgebiet’ Dünkirchen (2.38E, 51N) als gemeinsamer Gitterpunkt Dünkirchen kein GP in originalem COSMO-DE-Gitter Auflösung 0.027°/0.022° (lon/lat – reguläres Gitter) Anpassungen: Interpolation von rotiertem Gitter (0.025° lon/lat) auf SESAR-Gitter Variablenanpassung: z.B. Windstärke auf SESAR-Gitter aus staggered grid Korrekte Einstellungen der grib2 header 35

Zwei Phasen der Datenarchivierung 1. Phase (Sommer 2012): 22. Juli – 30. August 2012 93 Variablen 20 Member 21h Vorhersage (stündlich) 03UTC Vorhersage 2. Phase (Frühling 2014): 1. April bis 10. Juni 2014 (71 Tage – 40 ausgewählte) Selbe Spezifikationen wie in Phase 1 Vorhersage bis 27h neu

Observation thunderstorm 37

COSMO-DE COSMO-DE-EPS further details: see talk SCI-PS166.01 Susanne Theis: Tue 13:30, room 524A set-up COSMO-DE-EPS COSMO-DE COSMO-DE-EPS „variations“ within the system ensemble members