Deutsches Zentrum für Luft- und Raumfahrt e.V. SCIAMACHY Calibration Review, 9-13 Sept 2002 page 1 Calibration Review: SCIAMACHY
Deutsches Zentrum für Luft- und Raumfahrt e.V. SCIAMACHY Calibration Review, 9-13 Sept 2002 page 2 Main SCIAMACHY SODAP Contributions Astrium GmbH Friedrichshafen - Technical and Planning Lead DLR Oberpfaffenhofen (SOST) - Mission Planning & Parameter Tables IMF - Calibration Dutch Space Leiden - Thermal control IFE Bremen (SOST) - Instrument Long Term Monitoring SRON Utrecht - Optical Performance TNO/TPD Delft - Calibration and Key Data ESA/ESTEC- Calibration formal AO Instrument Providers: NIVR Delft - Overall direction of the Dutch contributions DLR Bonn - Overall direction
Major Points with Impact on SODAP Schedule Deutsches Zentrum für Luft- und Raumfahrt e.V. SCIAMACHY Calibration Review, 9-13 Sept 2002 page 3 PMC S/W (ENVISAT) problem solved last occurrence was mid of June ICU S/W work around for ongoing mission is established successfully change of an on ground S/W version flight S/W patch is under preparation
Major Points with Impact on SODAP Schedule Deutsches Zentrum für Luft- und Raumfahrt e.V. SCIAMACHY Calibration Review, 9-13 Sept 2002 page 4 Signal Drop in Channel 7 & 8 non nominal decontamination performed end of July 2002 improvement: 50% signal loss in 3 weeks before this decontamination30% signal loss in 3 weeks before this decontamination expectation: further improvement by another non nominal decontamination after current validation campaigns
Major Points with Impact on SODAP Schedule Deutsches Zentrum für Luft- und Raumfahrt e.V. SCIAMACHY Calibration Review, 9-13 Sept 2002 page 5 Level 1b Data Distribution potential schedule driver for the future evaluation of several important objectives for SCIA SODAP is based on the availability of level 1b data
Deutsches Zentrum für Luft- und Raumfahrt e.V. SCIAMACHY Calibration Review, 9-13 Sept 2002 page 6 Major Points with Impact on SODAP Schedule
Deutsches Zentrum für Luft- und Raumfahrt e.V. SCIAMACHY Calibration Review, 9-13 Sept 2002 page 6 Major Points with Impact on SODAP Schedule