Landfill Spremberg-Cantdorf STRABAG Umwelttechnik GmbH Landfill construction Landfill Spremberg-Cantdorf Surface sealing system and recultivation: 15.000 m³ levelling works 35.000 m³ base layer 70.000 m² geomembrane 2.5 mm, 70.000 m² geotextile 21.000 m³ drainage layer 105.000 m³ recultivation layer Degassing system: Construction of 5 new gas wells 1 Gas collection station 4.000 m gas collection piping Roadworks: 3.000 m Construction of maintenance roads Other drainage areas: 2 retention basins Facts City (country): Spremberg-Cantdorf (Germany) client: Landkreis Spree-Neiße, Forst contractor: STRABAG Umwelttechnik GmbH (former HEILIT Umwelttechnik GmbH) engineering: ARCADIS Deutschland GmbH, Potsdam Contract value: 4.1 million EUR Construction period: 3/2011 ─ 9/2012