1 2016 Biomass partnerships. 2 technical, economical, environmental aspects April 1st, 2016 Bild-Quelle [8]

Ähnliche Präsentationen


Präsentation zum Thema: "1 2016 Biomass partnerships. 2 technical, economical, environmental aspects April 1st, 2016 Bild-Quelle [8]"—  Präsentation transkript:

1 1 2016 Biomass partnerships

2 2 technical, economical, environmental aspects April 1st, 2016 Bild-Quelle [8]

3 3 Definition  production  supply Quelle: propellets Austria Pellets

4 4 Definition Quelle: Holzforschung Austria Wood chips typical data A2.0, F15 A3.0, F15 A5.0, F25 A7.0, F25 ÖNORM C 4005

5 5 Detailed heat demand inquiry !!!  Heat load kW  Heat energy MWh space heating, hot water, process heat  Load characteristics, sorted annual load curve Bilder: Fraunhofer-Institut für Umwelt-, Sicherheits- und Energietechnik UMSICHT Quelle: Schriftenreihe QM Holzheizwerke concept & configuration

6 6 defining:  max. load of heat source  system monovalent / bivalent one / multiple boiler with / without storage tank  base load / peak load ..... concept & configuration

7 7 Holiday resort ClientFeriendorf Obertraun GmbH Objects75 flats in 46 buildings and one central building (hotel, pool, restaurant) Heat demand1.500 MWh/a Net length1.350 trm Commissioning2011 Project examples - Contracting Biomass Partnerships

8 8 Base loadBiomass boiler 390 kW Peak loadOil boiler 700 kW Puffer storage12.000 l Back upmobile heating station Fuel95 % wood chips (~ 2.600 srm), 5 % oil (~ 9.000 l) Fuel storage250 m3 CO2 savings500 to / a Project examples - Contracting Biomass Partnerships

9 9 Industry Project / ClientFronius International GmbH Objects Industry, new plant + office building, + assembly hall, + storage building Project examples - Contracting Biomass Partnerships

10 10 Commissioning2006 Heat demand5.500 MWh/a; 3.200 kW for space heating, hot water and process heat Nominal output 320 kW wood chip boiler 1.200 kW wood chip boiler Peak load 1.300 kW gas boiler Back upmobile heating station Heat production98% biomass, 2% gas Extension2010 Heat demand800 MWh/a, 650 kW - Ö/G - Ö/G Sp - Sp - BM Project examples - Contracting Biomass Partnerships

11 11 Fuelwood chips, bark, saw mill residues Fuel storage600 m3, push floor Fuel logisticlocal farmer Fuel demand~ 10.000 m3/yr CO2 savings~1.500 to/yr Project examples - Contracting Biomass Partnerships

12 12 EA-NRW Thank you for your kind attention ! Contact: Energiesparpartnerschaft Dienstleistung keine Investitionskosten Energieeffiziente Systeme Wirtschaftliche, Zukunftssichere, Innovative Lösungen Modernisierung Erneuerbare Energieträger aigner energie contracting gmbh ing. aigner wasser wärme umwelt gmbh A-4501 Neuhofen, Kremstalstraße 18 Tel: +43 (0)7227 6081–0 Fax: -13 www.ing-aigner.at office@ing-aigner.at DI Siegfried Aigner siegfried.aigner@ing-aigner.at