Joint OECD/ ECMT Transportation Research Center Working Group on Transp. Infrastructure Investment April 25-26, 2006 Vienna, Austria Financing transp.

Slides:



Advertisements
Ähnliche Präsentationen
messe- und ausstellungscenter Service GmbH
Advertisements

Cadastre for the 21st Century – The German Way
PRESENTATION HEADLINE
SION Vacuum Circuit-Breakers 3AE5 and 3AE1
Energy Supply in the Region Ulm / Neu-Ulm
DNS-Resolver-Mechanismus
Managing the Transition from School-to-Work Empirical Findings from a Mentoring Programme in Germany Prof. i.V. Dr. Martin Lang.
Herzlich Willkommen zum Informations-Forum: SAP Interoperabilität
Joachim Witt Musician and Actor.
First Seminar in Brussels, 15th of December 2010
Steinbeis Forschungsinstitut für solare und zukunftsfähige thermische Energiesysteme Nobelstr. 15 D Stuttgart WP 4 Developing SEC.
Fakultät für informatik informatik 12 technische universität dortmund Optimizations Peter Marwedel TU Dortmund Informatik 12 Germany 2009/01/17 Graphics:
Subjects and Direct Objects When to use der vs. den.
Telling Time in German Deutsch 1 Part 1 Time in German There are two ways to tell time in German. There are two ways to tell time in German. Standard.
C. Kottmeier, C. Hauck, G. Schädler, N. Kalthoff
NUMEX – Numerical experiments for the GME Fachhochschule Bonn-Rhein-Sieg Wolfgang Joppich PFTOOL - Precipitation forecast toolbox Semi-Lagrangian Mass-Integrating.
Wozu die Autokorrelationsfunktion?
Institut für Verkehrsführung und Fahrzeugsteuerung > Technologien aus Luft- und Raumfahrt für Straße und Schiene Automatic Maneuver Recognition in the.
Institut für Verkehrsführung und Fahrzeugsteuerung > Technologien aus Luft- und Raumfahrt für Straße und Schiene Driving Manoeuvre Recognition > 19. Januar.
Lancing: What is the future? Lutz Heinemann Profil Institute for Clinical Research, San Diego, US Profil Institut für Stoffwechselforschung, Neuss Science.
Three minutes presentation I ArbeitsschritteW Seminar I-Prax: Inhaltserschließung visueller Medien, Spree WS 2010/2011 Giving directions.
Lehrstuhl Informatik III: Datenbanksysteme AstroGrid-D Meeting Heidelberg, Informationsfusion und -Integrität: Grid-Erweiterungen zum Datenmanagement.
Institut für Wasserbau Stuttgart Geodätisches Institut Stuttgart Institut für Meteorologie und Klimaforschung IMK-IFU SPP 1257 DIRECT WATERBALANCE An interdisciplinary.
Bologna conference: Asymmetric Mobility Medical sciences in Austria Christian SEISER 29 May 2008.
Fachabteilung 16A Überörtliche Raumplanung Cross border co-operation from the view of a public administration unit.
Deutsche Gesellschaft für Technische Zusammenarbeit GmbH Integrated Experts as interface between technical cooperation and the private sector – An Example.
Methods Fuzzy- Logic enables the modeling of rule based knowledge by the use of fuzzy criteria instead of exact measurement values or threshold values.
Institut für Umweltphysik/Fernerkundung Physik/Elektrotechnik Fachbereich 1 Pointing Meeting Nov 2006 S. Noël IFE/IUP Elevation and Azimuth Jumps during.
Weather forecasts and crisis management Michael Staudinger
Own photographs Fachgebiet Schienenfahrwege und Bahnbetrieb Prof. Dr.-Ing. habil. J. Siegmann Dipl.-Ing. Helge Stuhr Technische Universität Berlin Institut.
Question words and word order By the end of this lesson you will have revised question words By the end of this lesson you will be able to use question.
Laurie Clarcq The purpose of language, used in communication, is to create a picture in the mind and/or the heart of another.
Case Study Session in 9th GCSM: NEGA-Resources-Approach
Die Zeit (TIME) Germans are on military time which is 1-24
Institut AIFB, Universität Karlsruhe (TH) Forschungsuniversität gegründet 1825 Towards Automatic Composition of Processes based on Semantic.
Institut für Solare Energieversorgungstechnik Verein an der Universität Kassel Bereich Energetische Biomassenutzung, Hanau Dipl.-Ing. J. Müller Bioturbine,
T.Ruf, N.Brook, R.Kumar, M.Meissner, S.Miglioranzi, U.Uwer D.Voong Charge Particle Multiplicity Disclaimer: Work has started only recently! I am not an.
Hacettepe University Ankara January 2013
| DC-IAP/SVC3 | © Bosch Rexroth Pneumatics GmbH This document, as well as the data, specifications and other information set forth in.
A good view into the future Presented by Walter Henke BRIT/SLL Schweinfurt, 14. November 2006.
VOCABULARY SOCCER QUESTIONS PRESENT CONTINOUS WORDLIST – CELL PHONE Unit 2 - Trainer.
Alp-Water-Scarce Water Management Strategies against Water Scarcity in the Alps 4 th General Meeting Cambery, 21 st September 2010 Water Scarcity Warning.
Technische Universität München - Internalising external costs of transportation - Effective option for climate protection or academic exercise? Regine.
bei in seit mit auf hinter von nach aus zu für vor.
INTAKT- Interkulturelle Berufsfelderkundungen als ausbildungsbezogene Lerneinheiten in berufsqualifizierenden Auslandspraktika DE/10/LLP-LdV/TOI/
Freitag den Aufgaben bis Montag den Unit 6 Grammar Printout Unit 6 Culture Worksheet Guten Morgen!
Einheit 3: Rechte und Pflichten Deutsch III Notizen.
Fusszeilentext – bitte in (Ansicht – Master – Folienmaster, 1. Folie oben) individuell ändern! Danach wieder zurück in Normalansicht gehen! 1 OTR Shearography.
Kölner Karneval By Logan Mack
Impairments in Polarization-Multiplexed DWDM Channels due to Cross- Polarization Modulation Marcus Winter Christian-Alexander Bunge Klaus Petermann Hochfrequenztechnik-Photonik.
4th Symposium on Lidar Atmospheric Applications
Ein Projekt des Technischen Jugendfreizeit- und Bildungsvereins (tjfbv) e.V. kommunizieren.de Blended Learning for people with disabilities.
The most obvious or direct use of auch is to mean also. Ich möchte auch Gitarre lernen. Auch ich möchte Gitarre lernen. I would like to learn Guitar. Someone.
Europa in der Krise Kiel,
Cross-Polarization Modulation in DWDM Systems
By: Jade Bowerman. German numbers are quite a bit like our own. You start with one through ten and then you add 20, 30, 40 or 50 to them. For time you.
Adjectiv Endungen Lite: Adjective following articles and pre-ceeding nouns. Colors and Clothes.
Wind Energy in Germany 2004 Ralf Christmann, BMU Joachim Kutscher, PTJ
Globale Plattform-Entwicklung für steigende Nachhaltigkeit
AVL-Trees (according to Adelson-Velskii & Landis, 1962) In normal search trees, the complexity of find, insert and delete operations in search.
Separable Verbs Turn to page R22 in your German One Book R22 is in the back of the book There are examples at the top of the page.
Component 4 Frankfurt (Oder) & Slubice Seite 1 COMPONENT 4: – in Frankfurt (Oder) & Slubice 1.All participants presented themselves.
Social Media and Social Innovation a Manifesto
Selectivity in the German Mobility Panel Tobias Kuhnimhof Institute for Transport Studies, University of Karlsruhe Paris, May 20th, 2005.
KGE Kommunalgrund GmbH Entwicklungsträger der Landeshauptstadt Magdeburg Presentation for the REDIS Project at the Interim Conference.
TUM in CrossGrid Role and Contribution Fakultät für Informatik der Technischen Universität München Informatik X: Rechnertechnik und Rechnerorganisation.
Noch most directly has the meaning of still. As such, it has basically for types of usage. The temporal usage of the word. (as it relates to time) can.
Andreas Burger ZENTRUM FÜR MEDIZINISCHE LEHRE RUHR-UNIVERSITÄT BOCHUM Irkutsk October 2012 Report about the lecture "Report of the TEMPUS IV- Project Nr.
OTTO-VON-GUERICKE-UNIVERSITÄT MAGDEBURG Fakultät für Verfahrens- und Systemtechnik Institut für Apparate- und Umwelttechnik INNOVATION AND TECHNICAL PROGRESS:
Garmisch-Partenkirchen Garmisch-Partenkirchen is a mountain resort town in Bavaria, southern Germany. Nearby is Germany's highest mountain, Zugspitze,
 Präsentation transkript:

Joint OECD/ ECMT Transportation Research Center Working Group on Transp. Infrastructure Investment April 25-26, 2006 Vienna, Austria Financing transp. Infrastructure under the paradigm shift from construction to operation Prof. Reinhart Kuhne, Ph.D. German Aerospace Center, Berlin Transportation Studies Group

Speed vs. Flow on I-10 westbound in 5 minute intervals from 4am to 6pm Source: Varaiya Pravin: What we‘ve learned about Highway Congestion. Transportation Research at the University of California, Access 27, Fall 2005, S. 2-9

Results from Performance Monitoring System on Californias Highways (data from 26000 sensors) 600 recurrent bottlenecks = 50% of weekday peak delays, 28% additionally peak-period congestion delay is caused by collisions, 10% of it accounting for 90% of all collision-induced delay Total vehicle-hours of travel (left) and sources of congestion (right) during peak periods Source: Varaiya Pravin: What we‘ve learned about Highway Congestion. Transportation Research at the University of California, Access 27, Fall 2005, S. 2-9

type of constructions site Incident Balance in Germany Road accidents (in 1000) 2000 2002 2003 2004 personal injuries fatalities 382,9 6,8 362,1 6,2 354,9 6,6 440,1 5,8 heavy property damage 133,3 129,8 124,0 total 516,2 491,9 485,5 Each construction site a congestion site type of constructions site number remarks Duration <14 Tage (daytime construction site) 30 000 cause of 25% of all congestions Duration >14 Tage (continuous construction site) 700 total lenght: 2000 km concerns 6% average duration: 4 months of the complete network freeway construction sites in the complete network (2000)

Incident consequences and improved incident management 1min blockage cause 5 min add‘l blockage capacity reduction due to reduction by 1 lane 3lane road: 48% 2lane road: 79% original situation improved incident management cummulative distribution Quelle: Forschung, Straßenbau und Straßenverkehrstechnik, Überlastungswahrscheinlichkeiten und Verkehrsleistung als Bemessungskriterium für Straßenverkehrsanlagen; Heft 870, Hrsg: Bundesministerium für Verkehr, Bau- und Wohnungswesen duration of incident [min]

The main goals of effective Traffic Incident Management are to: Protect both on-scene responders and the traveling public Reduce delays and associated impacts on travelers Reduce the possibility of secondary incidents Ensure that response resources tied up at incidents are put back into service quickly Top-of-the-line equipment such as the rotator pictured here enables towing and recovery companies to clear roads in minutes instead of hours. Source: David L. Helman: Traffic Incident Management, Public Roads Nov./ Dec. 2004, Vol. 68 (www.tfhrc.gov/pubrds/04nov/03.htm)

Heavy Occupical Vehicle Tolling Lane a high-occupancy vehicle lane (or HOV lane) is a lane for vehicles with a driver and one or more passengers Some HOV lanes are built on totally separate roadways from their corresponding general use lanes; are constructed on parallel roads separated by a concrete barrier, are built on grade-separated (i.e. elevated or underground) roadways. One example is the Harbor Freeway in Los Angeles, California, where four HOV lanes travel on the upper deck of the freeway. This type of construction is said to maintain optimal efficiency by keeping general use traffic from merging back and forth into the HOV lanes, and by maximizing space on the main roadway for general use traffic. Additionally, major interchanges on such routes are often equipped with HOV-only ramps, which minimizes haphazard cross-freeway merging. Four high-occupancy vehicle lanes are elevated over general-use lanes on the Harbor Freeway in Los Angeles, CA Some cities that use separated HOV lanes make them reversible; i.e. usable only by inbound traffic during the morning rush and usable only by outbound traffic during the evening rush. Quelle: http://en.wikipedia.org/wiki/High-occupancy_vehicle_lane

Temporary emergency lane opening Emergency lanes increase the security on motorways Using the emergency lane means a higher security risk (about 25%) but increases also the road capacity with marginal costs Variable message signs variable message signs have to be used for lane allocation because of: shift in direction lane allocation on intersections lane allocation before and after a tunnel temporary emergency lane opening complete blocking of a tunnel Source: Hinweise zu variablen Fahrstreifenzuteilungen – Anwendungsbeispiele und Einsatzmöglichkeiten, Ausgabe 2003, FGSV e.V. Köln, ISBN: 3-937356-18-5

Saisonale Wärmespeicher künftig für Energiespeicherstraße Quelle: ITW, Universität Stuttgart

Bauarbeiten Erdsonden-Wärmespeicher in Neckarsulm Amorbach Quelle: ITW, Universität Stuttgart

Bauteiltemperierung: Energie liegt auf der Straße Fahrbahnabsorber: mit Sommerwärme gegen Winterglatteis Ziele: höhere Sicherheit, weniger Schäden an Belag u. Bauwerken Kombination von oberflächennaher Geothermie mit Massivabsorber. Nutzung des angrenzenden Erdreichs für saisonale Speicherung Ziele: Verminderung der Temperaturschwankungen => Winter: weniger Fortschäden, kein Blitzeis, weniger Schäden an Fahrbahn (und Karosserien nur relevant sofern irgendwann flächendeckend verfügbar) Sommer: bei Asphalt weniger Spurrillenbildung Energetisch: im von der Fa. Polydynamics umgestzten BVH wurden folgende Werte ermittelt: Heizleistung 260 W/m², Kühlleistung 100 W/m² Quelle: Fraunhofer Institut Bauphysik

projects by built operating and transfer due to the German private freeway financing act Nr Straße Land Strecke 1 B 103 MV Warnowquerung Rostock 2 A 8 BW AS Mühlhausen- AS Hohenstedt (neu) 3 A 20 SH/ NI Elbequerung nordwestlich Hamburg 4 A 52 NW Verbindung der A 40 mit der A 42 (Essen) 5 A 100 BE AD Neukölln – AS Landsberger Allee 6 A 281 HB Weserquerung 7 B 21 BY Kirchholztunnel Bad Reichenhall 8 B 50n RP Hochmoselübergang Wittlich/Bernkastel 9 B 75/ B 104 SH Travequerung Lübeck

Anhalter Bahnhof – Gölitzer Bahnhof UNIVERSITÄT STUTTGART INSTITUT FÜR STRASSEN- UND VERKEHRSWESEN (ISV) LEHRSTUHL VERKEHRSPLANUNG UND VERKEHRSLEITTECHNIK (VuV) Time Balance Bus Line 129 Anhalter Bahnhof – Gölitzer Bahnhof

Buslinie 65 zwischen Frankenstraße und Dutzendteich, Bus Priority Measures Buslinie 65 zwischen Frankenstraße und Dutzendteich, Quelle: VAG

Travel times Volksfestplatz->Doku-Zentrum for selected days 1 Bus less = 200 000 €/year savings Quelle: VAG

private financed infrastructure projects worldwide road traffic rail traffic energy telecommunication gas inland traffic/ shipping traffic water/ severage air traffic Quelle: Finanzierung der Straßeninfrastruktur: Leitfaden für neue Methoden der Finanzierung und Public Private Partnership (Orig. eng/ frz.) PIARC World Road Association, La Defence, 2000

Joint OECD/ ECMT Transportation Research Center Working Group on Transp. Infrastructure Investment April 25-26, 2006 Vienna, Austria Financing transp. Infrastructure under the paradigm shift from construction to operation Prof. Reinhart Kuhne, Ph.D. German Aerospace Center, Berlin Transportation Studies Group

Speed vs. Flow on I-10 westbound in 5 minute intervals from 4am to 6pm Source: Varaiya Pravin: What we‘ve learned about Highway Congestion. Transportation Research at the University of California, Access 27, Fall 2005, S. 2-9

Results from Performance Monitoring System on Californias Highways (data from 26000 sensors) 600 recurrent bottlenecks = 50% of weekday peak delays, 28% additionally peak-period congestion delay is caused by collisions, 10% of it accounting for 90% of all collision-induced delay Total vehicle-hours of travel (left) and sources of congestion (right) during peak periods Source: Varaiya Pravin: What we‘ve learned about Highway Congestion. Transportation Research at the University of California, Access 27, Fall 2005, S. 2-9

type of constructions site Incident Balance in Germany Road accidents (in 1000) 2000 2002 2003 2004 personal injuries fatalities 382,9 6,8 362,1 6,2 354,9 6,6 440,1 5,8 heavy property damage 133,3 129,8 124,0 total 516,2 491,9 485,5 Each construction site a congestion site type of constructions site number remarks Duration <14 Tage (daytime construction site) 30 000 cause of 25% of all congestions Duration >14 Tage (continuous construction site) 700 total lenght: 2000 km concerns 6% average duration: 4 months of the complete network freeway construction sites in the complete network (2000)

Incident consequences and improved incident management 1min blockage cause 5 min add‘l blockage capacity reduction due to reduction by 1 lane 3lane road: 48% 2lane road: 79% original situation improved incident management cummulative distribution Quelle: Forschung, Straßenbau und Straßenverkehrstechnik, Überlastungswahrscheinlichkeiten und Verkehrsleistung als Bemessungskriterium für Straßenverkehrsanlagen; Heft 870, Hrsg: Bundesministerium für Verkehr, Bau- und Wohnungswesen duration of incident [min]

The main goals of effective Traffic Incident Management are to: Protect both on-scene responders and the traveling public Reduce delays and associated impacts on travelers Reduce the possibility of secondary incidents Ensure that response resources tied up at incidents are put back into service quickly Top-of-the-line equipment such as the rotator pictured here enables towing and recovery companies to clear roads in minutes instead of hours. Source: David L. Helman: Traffic Incident Management, Public Roads Nov./ Dec. 2004, Vol. 68 (www.tfhrc.gov/pubrds/04nov/03.htm)

Heavy Occupical Vehicle Tolling Lane a high-occupancy vehicle lane (or HOV lane) is a lane for vehicles with a driver and one or more passengers Some HOV lanes are built on totally separate roadways from their corresponding general use lanes; are constructed on parallel roads separated by a concrete barrier, are built on grade-separated (i.e. elevated or underground) roadways. One example is the Harbor Freeway in Los Angeles, California, where four HOV lanes travel on the upper deck of the freeway. This type of construction is said to maintain optimal efficiency by keeping general use traffic from merging back and forth into the HOV lanes, and by maximizing space on the main roadway for general use traffic. Additionally, major interchanges on such routes are often equipped with HOV-only ramps, which minimizes haphazard cross-freeway merging. Four high-occupancy vehicle lanes are elevated over general-use lanes on the Harbor Freeway in Los Angeles, CA Some cities that use separated HOV lanes make them reversible; i.e. usable only by inbound traffic during the morning rush and usable only by outbound traffic during the evening rush. Quelle: http://en.wikipedia.org/wiki/High-occupancy_vehicle_lane

projects by built operating and transfer due to the German private freeway financing act Nr Straße Land Strecke 1 B 103 MV Warnowquerung Rostock 2 A 8 BW AS Mühlhausen- AS Hohenstedt (neu) 3 A 20 SH/ NI Elbequerung nordwestlich Hamburg 4 A 52 NW Verbindung der A 40 mit der A 42 (Essen) 5 A 100 BE AD Neukölln – AS Landsberger Allee 6 A 281 HB Weserquerung 7 B 21 BY Kirchholztunnel Bad Reichenhall 8 B 50n RP Hochmoselübergang Wittlich/Bernkastel 9 B 75/ B 104 SH Travequerung Lübeck

Anhalter Bahnhof – Gölitzer Bahnhof UNIVERSITÄT STUTTGART INSTITUT FÜR STRASSEN- UND VERKEHRSWESEN (ISV) LEHRSTUHL VERKEHRSPLANUNG UND VERKEHRSLEITTECHNIK (VuV) Time Balance Bus Line 129 Anhalter Bahnhof – Gölitzer Bahnhof

Buslinie 65 zwischen Frankenstraße und Dutzendteich, Bus Priority Measures Buslinie 65 zwischen Frankenstraße und Dutzendteich, Quelle: VAG

Travel times Volksfestplatz->Doku-Zentrum for selected days 1 Bus less = 200 000 €/year savings Quelle: VAG

private financed infrastructure projects worldwide road traffic rail traffic energy telecommunication gas inland traffic/ shipping traffic water/ severage air traffic Quelle: Finanzierung der Straßeninfrastruktur: Leitfaden für neue Methoden der Finanzierung und Public Private Partnership (Orig. eng/ frz.) PIARC World Road Association, La Defence, 2000