NEYCONSULT Profile Adalbert Ney. NEYCONSULT Consulting Profile: Sucessfull track story since 2003 in the areas of procurement and supply chain management.

Slides:



Advertisements
Ähnliche Präsentationen
Alexander Stuber & Partner
Advertisements

E-Solutions mySchoeller.com for Felix Schoeller Imaging
Christian Elsner, Country Manager D/A/CH Hannover, Wertschöpfungsfaktor Web Analytics Präsentation für die RedDot Usergroup e.V.
Testing of the Wireless Interface Between a Commercial PDA and Multi - Modal Display Cluster of a Vehicle Vortrag_Paderborn.ppt / Ning /
UPS Supply Chain Solutions SM Auslastung von Spitzenanforderungen mit Hilfe eines On-Site Managements Irene Wiedemann - HR Manager Thomas Müller - Senior.
Deutsch-Polnisches Kooperationsbüro der Sparkassen 1 The German-Polish Cooperation Office of the German Savings Banks.
Application Lifecycle Services „Moderner Staat“ – Messestand Capgemini
A good view into the future Presented by Walter Henke BRIT/SLL Schweinfurt, 14. November 2006.
Titelmasterformat durch Klicken bearbeiten Textmasterformate durch Klicken bearbeiten Zweite Ebene Dritte Ebene Vierte Ebene Fünfte Ebene 1 Titelmasterformat.
The Bildungsinstitut PSCHERER gGmbH
Carbon Composites e.V. (CCeV) The Competence Network December 4 th, 2013.
EUROPÄISCHER FONDS FÜR REGIONALE ENTWICKLUNG MANAGING AUTHORITY EUROPEAN REGIONAL DEVELOPMENT FUND BADEN-WÜRTTEMBERG Designing good programmes.
Zips, March 2008 Germany‘s views on investment in China German FDI to China, 9th biggest foreign investor in 2005 Almost 2000 German companies in China.
Präsidialbereich Umweltbundesamt Dessau-Roßlau, März 2009.
Scenario Overview – 1 Purpose and Benefits: Purpose Benefits
Universität Stuttgart Institut für Energiewirtschaft und Rationelle Energieanwendung IER Sven Eckardt, Jochen Lambauer SUTOUREELM Supporting Tourism Enterprises.
UFZ UMWELTFORSCHUNGSZENTRUM LEIPZIG-HALLE GmbH October 2004 in Leipzig, Germany at the UFZ Centre for Environmental Research 11 th Magdeburg Seminar.
1 Cluster 4 – Vehicle ICT PROJECT APPETIZER Kooperationsveranstaltung asc(s, VDC Fellbach, TU Berlin “Kompetenzatlas Fahrsimulator" FKFS – Pfaffenwaldring.
IWI-HSG Business Collaboration in the Information Age Hubert Österle Impress Vision Dinner, Lenbach.
Local Government Solutions Forum Healy Hudson Georg Reisch, President Barcelona 2007.
© UVK Verlagsgesellschaft mbH, Konstanz und München 2015
© UVK Verlagsgesellschaft mbH, Konstanz und München 2015
Purchased Material Price Planning SAP Best Practices Baseline Package SAP Best Practices.
KLIMA SUCHT SCHUTZ EINE KAMPAGNE GEFÖRDERT VOM BUNDESUMWELTMINISTERIUM Co2 online.
Why Should You Choose ELeaP Learning Management System?
Chair of Business and Human Resource Education II Prof. Dr. Marc Beutner EU-StORE: Evaluation and Standard Implementation Meeting September 8th - 10th.
EUROPÄISCHE GEMEINSCHAFT Europäischer Sozialfonds EUROPÄISCHE GEMEINSCHAFT Europäischer Fonds für Regionale Entwicklung Workpackage 5 – guidelines Tasks.
Stahl-Zentrum Stahlinstitut VDEh | Wirtschaftsvereinigung Stahl 1 | © Stahlinstitut VDEh | Wirtschaftsvereinigung Stahl Welcome to Düsseldorf.
Seite 1 OPTIAS Development of a Management Concept for OPTImising the locAtion Strategy in Urban and Suburban Industrial Properties and reduction from.
NEYCONSULT Adalbert Ney. Unternehmensberater/ Interim Manager: Erfolgreicher Abschluss von 12 Projekten seit 2003 in den Bereichen Einkauf / Supply Chain.
Company profile IME–GmbH Industrie Maschinen Ersatzteile Hohenheider Strasse 116, Wedemark GERMANY.
1 E F F I C I E N C Y D E C I D E S Partner of the Contracting Campaign in Siemens Building Technologies EnBW GmbH STEAG Saar Energie AG HARPEN EKT.
Der AUDITOR Der Rohstoffinformationsdienst The commodity information service.
Oracle Transportation Management
Titelmasterformat durch Klicken bearbeiten Textmasterformate durch Klicken bearbeiten Zweite Ebene Dritte Ebene Vierte Ebene Fünfte Ebene 1 Titelmasterformat.
Supply Chain Management David Hauer, Robert Hoffmann, Andreas Pentek Kooperative Systeme Universität Wien 09. Dezember 2008.
STAKEHOLDER WORKSHOP DES EU-PROJEKTS ALTER-MOTIVE ( ) ELEKTROMOBILITÄT ODER BIOFUELS? Technische Universität Wien Wien,
Standort assurance for companies Industrie- und Handelskammer Lippe zu Detmold 01. Juni 2010 Seite 1 What does the IHK do against the crisis?
Easyrecruit tailored recruiting solutions.. Companies often lack the know- how and capacity in recruiting.
© 2014 VMware Inc. All rights reserved. Automatisierung und Verrechnung in einer IoT Cloud am Beispiel von Bosch Private Cloud Costing | Cloud Business.
Created by BM|DESIGN|ER Happy Pigeon default. Created by BM|DESIGN|ER PARTNERS Int. Uni and Business Schools Artists CV (Lebenslauf) Hilfeservices Companies.
1 CDP Städteprogramm 17. März 2015 Tino Kretschmer.
Prof: Dr. Swen GüntherLehre & Forschung im Bereich „Prozess-, Qualitäts- und Innovationsmanagement“01. Juli 2016Page 1 Prof. Dr. Swen Günther HTW Dresden.
Warum es sich lohnt, eine neue BÖWE-Maschine zu kaufen! / Why it is worth to buy a new BÖWE machine! Ein Vergleich zwischen einer P532 und einer P18 /
Linde AG : Transparent data enable efficient plant engineering
Prof. Dr. Guido Voigt– Institut für Logistik (SCM)
The economic potential of the global Heavy Rare Earth Element deposits in comparison to the high-class Chinese deposits Joint Meeting GV and.
deutsch english weitnerengineeringworld Präsentation/presentation
Renewable energy wind.
Premiere Conferencing GmbH
MUNICH OFFICES TAKE A LOOK Workshop
„Strategy 2010“ in Austria and its impact for the cooperation of science and industry Dr. Ludovit Garzik Austrian Council for Research and Technology.
Cryo-Test LESER Test Bench
ETP S.A./TP Elbud News 03/2017.
Process and Impact of Re-Inspection in NRW
Berufsbildende Schulen des Landkreises Oldenburg, Wildeshausen
Cluster Mapping A tool for regional and national policy makers
Lumesse Talent Acquisition
1. Stammorganisation 2. Projektorganisation 3. Prozessorganisation
Results from CO2 heat pump applications
Senatsverwaltung für Bildung, Jugend und Wissenschaft
Health Card for refugees in Bremen
Avalanche-, Debris Flow- and Mudslide RADAR
„Förderwolke“ A Cloud-based exchange platform for the qualitative enhancement and improvement of inclusive education Dipl. Reha-Päd. Hanna Linke scientific.
Increasing excellence on advanced additive manufacturing
Official Statistics Web Cartography in Germany − Regional Statistics, Federal and European Elections, Future Activities − Joint Working Party meeting.
Computer Services Business challenge
Scenario Framework for the Gas Network Development Plan
 Präsentation transkript:

NEYCONSULT Profile Adalbert Ney

NEYCONSULT Consulting Profile: Sucessfull track story since 2003 in the areas of procurement and supply chain management. Professional Profile Logistics officer Head of purchasing and logistics by several german mid size companies ( sales Mio €) Supply Chain Manager of Swedisch,Britsh and American companies ( sales Mio €) Adalbert Ney Dipl.-Betriebswirt Purchasing and Supply Chain Management In der Tränk 36 D Offenbach Phone: Cell: 0171/ Mail: Education Masters degree in economics and law Industries Machine Tool Microprozessor Electronical Automotive

DVS Group Analysing saving potential for 10 legal companies Implementation of cost cutting Verfication and alignment of measures Lower main stock Higher performance Improved service level Enhanced cash flow Standardization of main parts Increased parts availability ERP System PSI PENTA Potential analysis Price comparisons Global Sourcing RFQs Result: 10% cost cutting and standardization of main parts Benefit Tools Tasks Targets: Improve purchasing performance min.by 8%

Blitz Rotary 2008 Analysing all raw material production and warehouse stocks Identification of slow mover and fast mover parts Standardization of main parts Action and Implementation Plan Lower main stock Higher service level Improved KPIs Reduction of warehouses Reduction of main stocks ERP System JDEdwards Parts analysis Monthly stock report Result: 8% cost cutting and reduction of all external stocks Benefit Tools Tasks Targets: Reduce stocks around by min 5 % and increase cash flow

Fibro & Fibro GSA 2009 Analysing all sensor and semiconductors devices for 2 legal companies Identification of cost cutting potential Benchmarking Action Plan Lower main stock Standardization of Semiconductors Improved Service level Lower main stock Increased parts availability ERP System PSI PENTA Potential analysis Price comparisons Global Sourcing RFQs Result: 10% cost cutting and standardization of semiconductors Benefit Tools Tasks Targets: Standardization and Cost Cutting around 8 %

ABM Greiffenberger 2010 Analysing for all bearings and mechanical parts and raw material Identification of cost cutting potential Benchmarking Action Plan Standardization of bearings Enhanced cash flow Lower main stock Improved Service level ERP System SAP Potential analysis Price comparisons Global Sourcing RFQs Result: 10% cost cutting and standardization of bearings Benefit Tools Tasks Targets: Standardization and Cost Cutting around 10 %

Magnetic Autocontrol 2011 Analysing all raw material, production parts and purchased parts Identification of cost drivers Benchmarking Action and Implementation Plan Reduced product costs Standardization of main parts Lower warehouse stock Lower logistics costs improved KPIs ERP System SIGIPS RFQs worldwide Weekly reporting Result: 11% cost cutting and reduction of main parts BenefitTools Tasks Targets: Reduce production costs for a new product line around 10 %

Carl Zeiss SMT 2012/2014 Negotiations of framecontracts Negotiations with legal and patent lawyers Negotiations of Escrows Gobal Sourcing Action Plan Lower main stock Increase supplier´s performance Safeguard the worldwide Supply Chain Development of alternative suppliers ERP System SAP Framecontracts Escrows Agreements Monthly reporting Result: Framecontracts for all main suppliers Benefit Tools Tasks Targets: Support of frameworks and searching alternative Suppliers

Carl Zeiss Microscopy 2014 Analysing all raw material, production parts and purchased parts Identification of cost drivers Benchmarking Action and Implementation Plan Reduced product costs Standardization of main parts Lower warehouse stock Lower logistics costs improved KPIs ERP System SAP RFQs worldwide Weekly reporting Result: 12% cost cutting and reduction of main parts BenefitTools Tasks Targets: Cost Cutting for a high technology project around 12 %

Wittenstein AG 2015 Analysing all raw material, production parts and purchased parts Identification of cost drivers Benchmarking Action and Implementation Plan Reduced product costs Standardization of main parts Lower warehouse stock Lower logistics costs improved KPIs ERP System SAP RFQs worldwide Weekly reporting Result: 10% cost cutting and reduction of main parts BenefitTools Tasks Targets: Cost Cutting for a high technology project around 10 %

Anfahrtskizze In der Tränk 36 D Offenbach (Tel 069/ ) Anfahrtskizze  Frankfurter Kreuz A 3 (Ri Würzburg)  A3 ca. 8 km folgen bis zum Offenbacher Kreuz  OF Kreuz rechts abbiegen auf A661 ( Ri. Bad Homburg)  A661 ca. 4,2 Km folgen bis Ausfahrt OF-Kaiserlei  OF-Kaiserlei rechts abbiegen auf Kaiserleikreisel 1 Ausfahrt scharf rechts auf Berliner Strasse ( Ri. OF-Zentrum )( Achtung: Radarkontrollen!!)  Berlinerstrasse 1,7 km gerade aus bis Ampelkreuzung vor TOYS „R“ US  Links Abbiegen in die Schlosstrasse  Nach 200m rechts abbiegen auf Mainstrasse ( Links rotes Ysenburger Schloss )  Mainstrasse 1,4 km folgen ( Ri. OF-Bürgel)  Nach 600m gerade aus am „Haus der Bäcker“ vorbei  Nach 1,4 km erreichen Sie OF- Bürgel  Nach 150 m rechts abbiegen in Altkönigstrasse  Nach der Kurve links in die Kettelerstrasse  ( Ri. Rumpenheim)  Nach 100m rechts in die Langstrasse einbiegen  Nach 500 m fahren Sie in die Rumpenheimerstr.  Nach 800 m kommen Sie nach OF-Rumpenheim  Gerade aus auf der Bürgelerstrasse ( re REWE)  Nach 300 m links abbiegen an der Schloss Apotheke in die Enkheimerstrasse  Nach 100 m links abbiegen In die Tränk.  Am Wendehammer nach 50 m können Sie parken.

References