- 1 - Technische Universität Berlin Fachgebiet Wirtschafts- und InfrastrukturPolitik (WIP) 22. June 2011 Modeling a Carbon Capture, Transport and Storage.

Slides:



Advertisements
Ähnliche Präsentationen
Cadastre for the 21st Century – The German Way
Advertisements

Service Oriented Architectures for Remote Instrumentation
PRESENTATION HEADLINE
An new European Power Network: Student Power
PSI and Competition The General Framework
Forstliche Versuchs- und Forschungsanstalt Baden - Württemberg Konstantin von Teuffel National Forest Research Institutes in Europe A capacity to provide.
Finding the Pattern You Need: The Design Pattern Intent Ontology
E-Solutions mySchoeller.com for Felix Schoeller Imaging
SION Vacuum Circuit-Breakers 3AE5 and 3AE1
Energy Supply in the Region Ulm / Neu-Ulm
An OGC Standards Driven Geodata Online Access for DLRs National Remote Sensing Data Library (NRSDL) Torsten Heinen German Remote Sensing Data Center (DLR/DFD)
1 | R. Steinbrecher | IMK-IFU | KIT – die Kooperation von Forschungszentrum Karlsruhe GmbH und Universität Karlsruhe (TH) Natural Sources SNAP11.
First Seminar in Brussels, 15th of December 2010
Steinbeis Forschungsinstitut für solare und zukunftsfähige thermische Energiesysteme Nobelstr. 15 D Stuttgart WP 4 Developing SEC.
Fakultät für informatik informatik 12 technische universität dortmund Optimizations Peter Marwedel TU Dortmund Informatik 12 Germany 2009/01/17 Graphics:
Fakultät für informatik informatik 12 technische universität dortmund Mapping of Applications to Platforms Peter Marwedel TU Dortmund, Informatik 12 Germany.
C. Kottmeier, C. Hauck, G. Schädler, N. Kalthoff
NUMEX – Numerical experiments for the GME Fachhochschule Bonn-Rhein-Sieg Wolfgang Joppich PFTOOL - Precipitation forecast toolbox Semi-Lagrangian Mass-Integrating.
Institut für Verkehrsführung und Fahrzeugsteuerung > Technologien aus Luft- und Raumfahrt für Straße und Schiene Automatic Maneuver Recognition in the.
Insulin pump therapy in adults allows metabolic control at lower rates of hypoglycemia along with reduced insulin doses – results from the nationwide DPV-survey.
Prof. Dr. Bernhard Wasmayr
Hochschulteam der Agentur für Arbeit Trier Preventing the Brainware Crisis Workshop Schloss Dagstuhl Student Enrollment in Computer Science.
5th IAEA Technical Meeting on ECRH Gandhinagar – February 2009
Deutsche Gesellschaft für Technische Zusammenarbeit GmbH Integrated Experts as interface between technical cooperation and the private sector – An Example.
Institut für Meteorologie und Klimatologie Universität Hannover Solare Strahlung – Stand und Perspektiven ihrer Erforschung Gunther Seckmeyer Short Notice.
KAE praxis verstehen chancen erkennen zukunft gestalten understanding reality facing challenges creating future Laboratory of Integrated Energy Systems.
20:00.
Medical Universities‘ Teaching Staff Training in Bochum Germany
Integration of renewable energies: competition between storage, the power grid and flexible demand Thomas Hamacher.
Own photographs Fachgebiet Schienenfahrwege und Bahnbetrieb Prof. Dr.-Ing. habil. J. Siegmann Dipl.-Ing. Helge Stuhr Technische Universität Berlin Institut.
Case Study Session in 9th GCSM: NEGA-Resources-Approach
Technische Universität München Lehrstuhl für Bauklimatik und Haustechnik Prof. Dr.-Ing. Gerhard Hausladen Technische Universität München Lehrstuhl für.
Institut AIFB, Universität Karlsruhe (TH) Forschungsuniversität gegründet 1825 Towards Automatic Composition of Processes based on Semantic.
Institut für Solare Energieversorgungstechnik Verein an der Universität Kassel Bereich Energetische Biomassenutzung, Hanau Dipl.-Ing. J. Müller Bioturbine,
Eine Einführung in die CD-ROM
A good view into the future Presented by Walter Henke BRIT/SLL Schweinfurt, 14. November 2006.
1 micro CHP - Stirling Technology TTGB/ENT-PL | | Dk121_80307_public_Info_Stirling_EN | © Robert Bosch GmbH Alle Rechte vorbehalten, auch.
Carbon Capture and Storage (CCS) in Modell Deutschland CCS in Germany – the future lies in industry Matthias Kopp, WWF Germany
1 Ein kurzer Sprung in die tiefe Vergangenheit der Erde.
Alp-Water-Scarce Water Management Strategies against Water Scarcity in the Alps 4 th General Meeting Cambery, 21 st September 2010 Water Scarcity Warning.
Technische Universität München - Internalising external costs of transportation - Effective option for climate protection or academic exercise? Regine.
Titelmasterformat durch Klicken bearbeiten Textmasterformate durch Klicken bearbeiten Zweite Ebene Dritte Ebene Vierte Ebene Fünfte Ebene 1 Development.
Ministerium für Umwelt und Naturschutz, Landwirtschaft und Verbraucherschutz des Landes Nordrhein-Westfalen Modelling of the carbon accumulation in beech.
Institut für Öffentliche Dienstleistungen und Tourismus Informal learning for regional development Manfred Walser Towards a Knowledge Society: Is Knowledge.
Institut für Umweltphysik/Fernerkundung Physik/Elektrotechnik Fachbereich 1 K. Bramstedt, L. Amekudzi, J. Meyer IFE/IUP Tangent heights in occultation.
Berner Fachhochschule Hochschule für Agrar-, Forst- und Lebensmittelwissenschaften HAFL Recent activities on ammonia emissions: Emission inventory Rindvieh.
4th Symposium on Lidar Atmospheric Applications
Ein Projekt des Technischen Jugendfreizeit- und Bildungsvereins (tjfbv) e.V. kommunizieren.de Blended Learning for people with disabilities.
Ertragsteuern, 5. Auflage Christiana Djanani, Gernot Brähler, Christian Lösel, Andreas Krenzin © UVK Verlagsgesellschaft mbH, Konstanz und München 2012.
Europa in der Krise Kiel,
Lehrstuhl für Energiewirtschaft und Anwendungstechnik Prof. Dr.-Ing. U. Wagner, Prof. Dr. rer. nat. Th. Hamacher Integration of renewable energies: competition.
3rd Review, Vienna, 16th of April 1999 SIT-MOON ESPRIT Project Nr Siemens AG Österreich Robotiker Technische Universität Wien Politecnico di Milano.
Berner Fachhochschule Hochschule für Agrar-, Forst- und Lebensmittelwissenschaften HAFL 95% der Ammoniakemissionen aus der Landwirtschaft Rindvieh Pflanzenbau.
Wind Energy in Germany 2004 Ralf Christmann, BMU Joachim Kutscher, PTJ
Folie Beispiel für eine Einzelauswertung der Gemeindedaten (fiktive Daten)
1 Stevens Direct Scaling Methods and the Uniqueness Problem: Empirical Evaluation of an Axiom fundamental to Interval Scale Level.
Technische Universität München Spatial aspects of the formation of GMO-free or GMO clubs Maarten J. Punt Technische Universität München.
Forestry Project Bewertung von Senken - Technologien Forestry Project, IIASA April 2003, Graz.
Lehrstuhl für Waldbau, Technische Universität MünchenBudapest, 10./11. December 2006 WP 1 Status (TUM) Bernhard Felbermeier.
Selectivity in the German Mobility Panel Tobias Kuhnimhof Institute for Transport Studies, University of Karlsruhe Paris, May 20th, 2005.
KGE Kommunalgrund GmbH Entwicklungsträger der Landeshauptstadt Magdeburg Presentation for the REDIS Project at the Interim Conference.
Technische Universität München 1 CADUI' June FUNDP Namur G B I The FUSE-System: an Integrated User Interface Design Environment Frank Lonczewski.
TUM in CrossGrid Role and Contribution Fakultät für Informatik der Technischen Universität München Informatik X: Rechnertechnik und Rechnerorganisation.
Andreas Burger ZENTRUM FÜR MEDIZINISCHE LEHRE RUHR-UNIVERSITÄT BOCHUM Irkutsk October 2012 Report about the lecture "Report of the TEMPUS IV- Project Nr.
Titelmasterformat durch Klicken bearbeiten Textmasterformate durch Klicken bearbeiten Zweite Ebene Dritte Ebene Vierte Ebene Fünfte Ebene 1 Rising energy.
OTTO-VON-GUERICKE-UNIVERSITÄT MAGDEBURG Fakultät für Verfahrens- und Systemtechnik Institut für Apparate- und Umwelttechnik INNOVATION AND TECHNICAL PROGRESS:
© Handwerkskammer für München und Oberbayern, Max-Joseph-Straße 4, München Dietmar Schneider Foreign Trade Department of the Chamber of Trade and.
Unabhängiger Monitoringausschuss zur Umsetzung der UN-Konvention über die Rechte von Menschen mit Behinderungen MonitoringAusschuss.at Monitoring the UN.
Folie Einzelauswertung der Gemeindedaten
1 Medienpädagogischer Forschungsverbund Südwest KIM-Studie 2014 Landesanstalt für Kommunikation Baden-Württemberg (LFK) Landeszentrale für Medien und Kommunikation.
 Präsentation transkript:

- 1 - Technische Universität Berlin Fachgebiet Wirtschafts- und InfrastrukturPolitik (WIP) 22. June 2011 Modeling a Carbon Capture, Transport and Storage (CCTS) Infrastructure for the Industrial Sector IAEE International Conference, Stockholm, Technische Universität Berlin Fachgebiet W irtschafts- und I nfrastruktur P olitik Pao-Yu Oei Andreas Tissen Johannes Herold

- 2 - Technische Universität Berlin Fachgebiet Wirtschafts- und InfrastrukturPolitik (WIP) 22. June 2011 Agenda 1)Motivation 2)Description of the Model CCTSMOD 3)Implemented Data 4)Scenario Runs a.BAU b.Industry c.Offshore d.Storage 5)Conclusion and Further Research

- 3 - Technische Universität Berlin Fachgebiet Wirtschafts- und InfrastrukturPolitik (WIP) 22. June 2011 Motivation C arbon C apture T ransport and S torage – CCTS 70 % higher costs without CCTS (IEA, 2009) few running projects (esp. Industry) Industry Sector Unavoidable CO 2 emissions Solution for total decarbonization Higher CO 2 concentration Motivation CCTSMOD Data Scenarios Conclusion Source: Clean Technica

- 4 - Technische Universität Berlin Fachgebiet Wirtschafts- und InfrastrukturPolitik (WIP) 22. June 2011 CO 2 Emissions from Heavy Industry Sources Energy: 348 MtCommerce: 89 Mt Transport: 152 Mt Households: 128 Mt Iron & Steel: 41 Mt Refineries: 27 Mt Cement: 26 Mt Pulp & Paper: 1 Mt CO 2 Emissions Germany: 837 Mt H 2 & NH 3 : 6 Mt CO 2 -free alternatives Petrochemical: 19 CO 2 -free alternatives Industry: 94 Mt Industry: 120 Mt EPRTR, 2010 Motivation CCTSMOD Data Scenarios Conclusion

- 5 - Technische Universität Berlin Fachgebiet Wirtschafts- und InfrastrukturPolitik (WIP) 22. June 2011 Decision Tree of the CCTSMOD Omniscient planner designs cost-optimal CCTS infrastructure given costs for infrastructure and CO 2 Certificates CO 2 Certificate price as initiator for CCTS development Time horizon Solved as an MIP with the CPLEX Solver in GAMS Source: Own illustration Motivation CCTSMOD Data Scenarios Conclusion

- 6 - Technische Universität Berlin Fachgebiet Wirtschafts- und InfrastrukturPolitik (WIP) 22. June 2011 Model: Cost Minimization Problem Subject to: Amount of produced CO2 for every emitter Capacity constraint for each step of the CCTS chain Physical balance for infrastructure Motivation CCTSMOD Data Scenarios Conclusion

- 7 - Technische Universität Berlin Fachgebiet Wirtschafts- und InfrastrukturPolitik (WIP) 22. June 2011 Mathematical Problem: Constraints Motivation CCTSMOD Data Scenarios Conclusion Balance: CO 2 – Balance: Capture: Flow: Storage: Planning: Total Storage: Non – Negativity:

- 8 - Technische Universität Berlin Fachgebiet Wirtschafts- und InfrastrukturPolitik (WIP) 22. June 2011 Data: Sources and Sinks in Germany Motivation CCTSMOD Data Scenarios Conclusion Source: Own illustriation

- 9 - Technische Universität Berlin Fachgebiet Wirtschafts- und InfrastrukturPolitik (WIP) 22. June 2011 Data: Capturing Costs Source: Own calculations based on Tzimas (2009) and WI (2008) Motivation CCTSMOD Data Scenarios Conclusion Variable Costs [/tCO 2 ] Steam Coal31,9731,5631,1930,8530,55 Gas46,8045,9245,1044,3543,65 Lignite29,3529,0628,8128,5828,37 Cement16,89 Steel16,39 Fixed Costs [/tCO 2 ] Steam Coal ,29119,3993,80 Gas ,36218,88171,98 Lignite ,7192,3372,54 Cement ,36107,4584,42 Steel ,6493,1273,17

Technische Universität Berlin Fachgebiet Wirtschafts- und InfrastrukturPolitik (WIP) 22. June 2011 Uncertainties influencing deployment of CCTS Available storage potential Low resolution data Different estimation methods Development of the CO 2 Certificate price CO 2 Certificate price is driving force Price is volatile to future climate policies Accessibility of storage sites Growing public resistance Offshore storage involves less stakeholders Motivation CCTSMOD Data Scenarios Conclusion

Technische Universität Berlin Fachgebiet Wirtschafts- und InfrastrukturPolitik (WIP) 22. June 2011 Selected Scenarios Scenario CO 2 Certificate price in 2050 Public acceptance Total Storage potential BAU 75 EuroOnshore & Offshore6.6 Gt Industry 50 EuroOnshore & Offshore6.6 Gt Offshore 75 EuroOffshore only1.2 Gt Storage 75 EuroOnshore & Offshore11.2 Gt Motivation CCTSMOD Data Scenarios Conclusion

Technische Universität Berlin Fachgebiet Wirtschafts- und InfrastrukturPolitik (WIP) 22. June 2011 Scenario Results: BAU (Business as Usual) Motivation CCTSMOD Data Scenarios Conclusion in 2025 Source: Own illustriation Industry starts at 40 /t Coal starts at 55 /t 2050: 80% captured ( 220Mt/a) pipeline network of 3800 km mostly onshore sinks 38 billion Infrastructure costs 1.5 of 6.6 Gt storage left in 2050

Technische Universität Berlin Fachgebiet Wirtschafts- und InfrastrukturPolitik (WIP) 22. June 2011 BAU: Costs for avoiding CO2 emissions Motivation CCTSMOD Data Scenarios Conclusion Source: Own illustriation IndustryPower Plants

Technische Universität Berlin Fachgebiet Wirtschafts- und InfrastrukturPolitik (WIP) 22. June 2011 Scenario Results: Offshore only Motivation CCTSMOD Data Scenarios Conclusion Source: Own illustriation in 2050 usage of all sinks 10 year delayed start only Industry starts at 50/t 2050: 20% captured: 54 Mt/a, (57% of industrial emission) Pipeline network of 2200 km

Technische Universität Berlin Fachgebiet Wirtschafts- und InfrastrukturPolitik (WIP) 22. June 2011 Scenarios Results: Overview Scenario CO 2 Price in 2050 Remaining Storage capacity in 2050 [Gt] CO 2 stored via CCTS in 2050 [Mt/a] Industry share from Pipeline length in 2050 CCTS Infrastructure Costs [bil ] BAU of %3800 km38 Industry of %1050 km8,8 Offshore75 0 of %2200 km11,5 Storage of %3000 km39,7 Motivation CCTSMOD Data Scenarios Conclusion

Technische Universität Berlin Fachgebiet Wirtschafts- und InfrastrukturPolitik (WIP) 22. June 2011 Conclusions I: Model Outcomes Industry first-mover, at CO2 prices of 50/t in 2050 Energy sector needs prices above 75/t in 2050 Up to 80% reduction possible for reasonable prices Not enough affordable storage capacities for all German emitters, especially if only offshore storage possible CCTS especially for North Germany interesting Formation of regional clusters Interconnected pipeline network in the case of Offshore storage Motivation CCTSMOD Data Scenarios Conclusion

Technische Universität Berlin Fachgebiet Wirtschafts- und InfrastrukturPolitik (WIP) 22. June 2011 Conclusions II: General Outcomes High abatement potential for industrial emissions (first mover) higher Network-Efficiency CCTS solution for unavoidable industrial CO 2 emissions Combined usage of industrial and electrical sector leads to storage scarcity (esp. in offshore case) Transport does matters (5% – 7% of all costs onshore, 17% offshore), however only if the network is planned in an optimal way). Europe-wide infrastructure planning Motivation CCTSMOD Data Scenarios Conclusion

Technische Universität Berlin Fachgebiet Wirtschafts- und InfrastrukturPolitik (WIP) 22. June 2011 Further Research We are currently working on: Application of stochastic optimization Upscaling on European Level Integration of EOR Thank you very much for your attention! Are there any questions?

Technische Universität Berlin Fachgebiet Wirtschafts- und InfrastrukturPolitik (WIP) 22. June 2011 References GeoCapacity (2009): Assessing European Capacity for Geological Storage of Carbon Dioxide – The EU GeoCapacity Project. Energy Procedia, Volume 1, Issue 1, February 2009, Pages IEA (2009): Technology Roadmap – Carbon Capture and Storage. OECD, Paris, France: International Energy Agency. Kobos et al (2007): The 'String of Pearls': The Integrated Assessment Cost and Source-Sink Model [Conference] // 6th Annual Carbon Capture & Sequestration Conference, May Pittsburgh, USA : Sandia National Laboratories. Mendelevitch, R., Oei, P.Y., Tissen, A. and Herold, J. (2010): CO 2 - Highways – Modeling Aspects of a Future CO 2 Transport Infrastructure, Centre for European Policy Studies (CEPS), Working Document No. 340; Brussels, Belgium. Middleton R. and Bielicki J.(2009): A Comprehensive Carbon Capture and Storage Infrastructure Model [Conference] // Proceedings of the 9th International Conference on Greenhouse Gas Technologies. Oei, P.Y., Mendelevitch, R. Herold, J., Tissen, A. von Hirschhausen, C. (2010): CO 2 -Autobahnen für Europa? Energiewirtschaftliche Tagesfragen (ET Magazin), Ausgabe 12/2010, ETV Energieverlag GmbH, Essen. RECCS+ (2010): RECCS plus – Regenerative Energien (RE) im Vergleich mit CO 2 -Abtrennung und Ablagerung (CCS) – Update und Erweiterung der RECCS-Studie. Bundesministerium für Umwelt, Naturschutz und Reaktorsicherheit (BMU). Tzimas E. (2009): The Cost of Carbon Capture and Storage Demonstration Projects in Europe, European Commission, Joint Research Center, Institute of Energy.

Technische Universität Berlin Fachgebiet Wirtschafts- und InfrastrukturPolitik (WIP) 22. June 2011 Industrial CCTS Projects around the world ProjectCountryLocationCapture Rate [tCO2/day] Prosint Methanol Production Plant BrasilRio de Janeiro90 Kurosaki Chemical PlantJapanKurosaki283 Sumitomo Chemicals PlantJapanIchihara150 Nippon Steel CO2 Capture Project JapanKimitsu170 Petronas Gas ProcessingMalaysiaKuala Lumpur160 AES Shady PointUSAPanama, Oklahoma200 AES Warrior RunUSACumberland, Maryland123 American Electric Power - Mountaineer USANew Haven274 Bellingham Cogeneration Facility USABellingham335 Total Lacq (Oxyfuel)FranceLacq205

Technische Universität Berlin Fachgebiet Wirtschafts- und InfrastrukturPolitik (WIP) 22. June 2011 Capture Costs in Industry Investment costs (based on Ho et al., 2010): 195 /tCO 2 for iron and steel 225 /tCO 2 for cement 325 /tCO 2 for petrochemical Variable costs (based on Ho et al., 2010): 17 /tCO 2 for iron and steel (60% HC) 24 /tCO 2 for cement (85% HC) 33 /tCO 2 for petrochemical (115% HC) Pipeline investment costs: Onshore: /km, Offshore: /km for a diameter of 18`` (Alstom, 2011) From /km to /km, depending on diameter (Metz et al., 2005)

Technische Universität Berlin Fachgebiet Wirtschafts- und InfrastrukturPolitik (WIP) 22. June 2011 Capture Costs in Industry Storage investment costs (IEA, 2005): 12.5 – 16.9 M/MtCO 2 onshore 34.5 – 44 M/MtCO 2 offshore Art der SpeicherstätteErschöpftes GasfeldSaline Aquifere OnshoreOffshoreOnshoreOffshore Bohrtiefe (vertikal + horizontal) [m] Max. Injektionsrate gemäß IEA [Mt CO 2 /Jahr] 1,25 11 Max. Injektionsrate gemäß Gerling [Mt CO 2 /Jahr] 0,42 0,33 Kapitalkosten pro Bohrung [M] 5,6214,505,6214,50 Betriebs-, Wartungs- und Monitoringkosten [%] 7878 [1] [1] Solch optimistische Einspeiseraten wie von der IEA angenommen treffen nur auf sehr wenige Speicherorte zu. Die durchschnittliche f ü r Europa zu erwartende Injektionsrate liegt bei ungef ä hr 0,33 Millionen Tonnen pro Jahr. (vgl. Gerling, 2010) In Anlehnung an diese Aussage wird f ü r das CCTSMOD mit einer dreimal geringeren als von der IEA (2005) angegebenen Einspeiserate gerechnet.

Technische Universität Berlin Fachgebiet Wirtschafts- und InfrastrukturPolitik (WIP) 22. June 2011 Scenario Results: Industry only (on- & offshore) Motivation CCTSMOD Data Scenarios Conclusion Source: Own illustriation

Technische Universität Berlin Fachgebiet Wirtschafts- und InfrastrukturPolitik (WIP) 22. June 2011 Costs for avoiding Industrial CO2 emissions Motivation CCTSMOD Data Scenarios Conclusion Source: Own illustriation

Technische Universität Berlin Fachgebiet Wirtschafts- und InfrastrukturPolitik (WIP) 22. June 2011 BAU: Costs for avoiding CO2 emissions Motivation CCTSMOD Data Scenarios Conclusion Source: Own illustriation

Technische Universität Berlin Fachgebiet Wirtschafts- und InfrastrukturPolitik (WIP) 22. June 2011 Data: Costs for Reference and CCTS Power Plant Source: Tzimas (2009), and Öko Institut (2011) Technologie Investitionskosten Demonstrationsprojekt in 08 /kW Effizienz in % Kohlestaubfeuerung Kohlestaubfeuerung mit Post-Combustion Abscheidung Integrated Gasification Combined Cycle (IGCC) mit CO2 Abscheidung Oxyfuel Carbon Capture Erdgas GUD Kraftwerk mit Post- Combustion Abscheidung Zementherstellung mit Post-Combustion Abscheidung ca. 87% der Investitionskosten im Kraftwerksbereich - Kalkherstellung mit Post-Combustion Abscheidung ca. 127 % der Investitionskosten im Kraftwerksbereich - Eisen- und Stahlherstellung mit Post- Combustion Abscheidung ca. 61 % der Investitionskosten im Kraftwerksbereich -

Technische Universität Berlin Fachgebiet Wirtschafts- und InfrastrukturPolitik (WIP) 22. June 2011 Mathematical Problem: Objective Function

Technische Universität Berlin Fachgebiet Wirtschafts- und InfrastrukturPolitik (WIP) 22. June 2011 Mathematical Problem: Constraints Subject to:

Technische Universität Berlin Fachgebiet Wirtschafts- und InfrastrukturPolitik (WIP) 22. June 2011 Mathematical Problem: Indices, Parameters and Variables

Technische Universität Berlin Fachgebiet Wirtschafts- und InfrastrukturPolitik (WIP) 22. June 2011 Data: CO 2 Sources and Potential Storage Sites Point sources are often agglomerated Large point sources are mainly power plants Main storage potential in Northern Germany and North Sea Region Potential storage sites and CO 2 sources are spatially divided in most cases Source: Own illustration according to data from EEA and GeoCapacity Motivation CCTSMOD Data Scenarios Conclusion

Technische Universität Berlin Fachgebiet Wirtschafts- und InfrastrukturPolitik (WIP) 22. June 2011 BAU for Europe in the year 2050 CCTS only an option for countries with a regional proximity between CO 2 intensive regions and storage sites. Domination of point to point connections – no interconnected transnational network Industry is first mover Source: Own illustration based on model results

Technische Universität Berlin Fachgebiet Wirtschafts- und InfrastrukturPolitik (WIP) 22. June 2011 Off 120 for Europe in the year 2050 Interconnected European CCTS infrastructure. Central and Eastern Europe is not connected to the network Immense infrastructure investments only lucrative for integration of CO 2 capture from power generation. Source: Own illustration based on model results

Technische Universität Berlin Fachgebiet Wirtschafts- und InfrastrukturPolitik (WIP) 22. June 2011