IBM Global Technology Services Contracts & Negotiations © 2006 IBM Corporation Presentation subtitle: 20pt Arial Regular, teal R045 | G182 | B179 Recommended.

Slides:



Advertisements
Ähnliche Präsentationen
Peter S. Niess Steinbeis-Europa-Zentrum
Advertisements

E-Solutions mySchoeller.com for Felix Schoeller Imaging
Automated IT Change Planning
Transaction Synchronization for XML Data in Client Server Web Applications Stefan Böttcher & Adelhard Türling Universität Paderborn.
Windows Vista für Entwickler
Steinbeis Forschungsinstitut für solare und zukunftsfähige thermische Energiesysteme Nobelstr. 15 D Stuttgart WP 4 Developing SEC.
LoanBroker w/ BizTalk Statuspräsentation – 26. Mai 2011 Referenten: Allgeier, Isenmann, Kopp.
Choose 5-7 adjectives to create the following comparative/superlativ e slideshow. You may choose words not on our list but you MUST make sure to use them.
DHBW Stuttgart, Technische Informatik, SW-Engineering, OOD April 2009 Seite 1 Christoph Riewerts Modeling in Colors – Objective: To learn and apply four.
Änderungen bewerten Change_Request.doc Änderungen bewerten Projekt-
Wozu die Autokorrelationsfunktion?
Corporate Community Relations 24. November 2003 Presentation subtitle: 20pt Arial Regular, teal R045 | G182 | B179 Recommended maximum length: 2 lines.
Confidentiality/date line: 13pt Arial Regular, white Maximum length: 1 line Information separated by vertical strokes, with two spaces on either side Disclaimer.
Fachabteilung 16A Überörtliche Raumplanung Cross border co-operation from the view of a public administration unit.
01 Installation / Support. © beas group 2011 / Page 2 This documentation and training is provided to you by beas group AG. The documents are neither approved.
©2011 Hewlett-Packard Development Company, L.P. The information contained herein is subject to change without notice ©2011 Hewlett-Packard Development.
Gehärtet von Anfang an { Windows 2008: Spezielle Aufgaben }
© 2010 Cisco and/or its affiliates. All rights reserved. Cisco Confidential Corporate Development Integration IronPort & ScanSafe Projektregistrations.
Case Study Session in 9th GCSM: NEGA-Resources-Approach
GPO Commodity Marketing April, 2013
Windows Essential Business Server 2008
Relative clauses What is a relative clause?
You need to use your mouse to see this presentation © Heidi Behrens.
| DC-IAP/SVC3 | © Bosch Rexroth Pneumatics GmbH This document, as well as the data, specifications and other information set forth in.
Das Perfekt (Present Perfect Tense). Think of 5 things you did in your holidays but think of sentences in the PRESENT TENSE. 1.Am Montag schlafe ich viel.
BAS5SE | Fachhochschule Hagenberg | Daniel Khan | S SPR5 MVC Plugin Development SPR6P.
Recht der Internationalen Organisationen -7- Internationale Gerichte.
G Stunde DEUTSCH 1. Unit: Family & homeFamilie & Zuhause Objectives: Phrases about date, weather and time-telling Alphabet – pronunciation and words The.
Your name Bedeutung von Internet- Technologien Gruppe 1 Andreas Feuerstein Philipp Hochratner Christian Weinzinger.
Neno Loje Berater & MVP für Visual Studio ALM und TFS (ehemals VSTS) Hochqualitative Produkte mit Visual Studio & TFS 2010.
Frank Fischer + Bernhard Frank Microsoft Deutschland GmbH.
3/28/2017 8:11 PM Visual Studio Tools für Office { Rapid Application Development für Office } Jens Häupel Platform Strategy Manager Microsoft Deutschland.
Wie komme ich zu..... ? (how do I get to....?)
The future tense with werden The verb werden werdensie / Sie werdetihr werdenwir wirder / sie / es wirstdu werdeich.
States in the development of a new service During the development a service will pass through a chain of stages determining the service.
Virtual Earth Visualisierung von Geodaten Daniel Walzenbach, Microsoft Deutschland GmbH
Template v5 October 12, Copyright © Infor. All Rights Reserved.
Cyber-Security und Datenschutz in der Cloud Wie passt das zusammen?
Past Perfect Tense.
Staatsballett Berlin Ein Verbesserungskonzept für den Social- Media Auftritt Your picture here.
Use this title slide only with an image Presentation Title Speakers Name/Department CeBIT 2014 Use the white area to place your partner or customer logo.
Ein Projekt des Technischen Jugendfreizeit- und Bildungsvereins (tjfbv) e.V. kommunizieren.de Blended Learning for people with disabilities.
OPENTOUCH™ SUITE FOR MLE
Premium AEROTEC S.R.L., Brasov Plant Noul spatiu de joaca tematic al Parcului Central Brasov construit de Premium AEROTEC cu sustinerea Primariei Brasov.
Microsoft Cloud Day Herzlich willkommen!. Microsoft Cloud Day MSDN Veranstaltung Die Cloud Plattform als Erfolgsbaustein – Wie Sie als Softwarefirma von.
Gern Lieber Modal auxiliaries Josh Speidel
3rd Review, Vienna, 16th of April 1999 SIT-MOON ESPRIT Project Nr Siemens AG Österreich Robotiker Technische Universität Wien Politecnico di Milano.
SIT-MOON ESPRIT Project Nr st Review, Brussels, 27th of April 1998 slide 1 Siemens AG Österreich Robotiker Technische Universität Wien Politecnico.
(Where are you traveling to?)
Thomas Claudius Huber Senior Consultant Trivadis AG WCF RIA Services Datengetriebene Apps.
Future Tense. When is the future? Any time after the present…..so….any time after RIGHT NOW.
Sentence Structure Subject and verb are always together. Subject and verb are always together. Subject and verb must agree Subject and verb must agree.
Software Group Presentation subtitle: 20pt Arial Regular, teal R045 | G182 | B179 Recommended maximum length: 2 lines Confidentiality/date line: 13pt Arial.
Separable Verbs Turn to page R22 in your German One Book R22 is in the back of the book There are examples at the top of the page.
Institut für Informationssysteme Technische Universität Braunschweig Title John Doe Subtitle.
SAP AG 2001 Corporate HR, Franz Deitering SAPs Business Situation, Challenges and Implications for HR Claus Heinrich Member of the Executive Board, SAP.
1 Stevens Direct Scaling Methods and the Uniqueness Problem: Empirical Evaluation of an Axiom fundamental to Interval Scale Level.
Technische Universität München Visual Presentations Hints for media usage.
Page 1 XXX21/08/2014 Implemented by Benutzen Sie diese Titelfolie für Programme und Projekte im Ausland. Setzen Sie das „einheitliche Logo der Zusammenarbeit“
Wort des Tages Objective Students will be able to change sentences from the present tense to the present perfect and will be able to change sentences.
Kleidung Projekt For this project you will critique 4 or 5 outfits as worn by “celebrities”. You may not write anything on the slide except for maybe a.
TITLE OF THE PRESENTATION Subtitle of a presentation Mr. John Q. Public, location, 14/03/2012.
Verifikation von IP-Multicast | 2. April 2015 | Final Presentation subtitle: 20pt Arial Regular, teal R045 | G182 | B179 Recommended maximum length: 2.
(Name of presenter) (Short title of presentation).
Your Logo Presentation Title Presentation Subtitle.
Interrogatives and Verbs
Premiere Conferencing GmbH
Hochleistungsmedizin rund ums Herz
Mineral Cube Project.
Title Layout Subtitle.
 Präsentation transkript:

IBM Global Technology Services Contracts & Negotiations © 2006 IBM Corporation Presentation subtitle: 20pt Arial Regular, teal R045 | G182 | B179 Recommended maximum length: 2 lines Confidentiality/date line: 13pt Arial Regular, white Maximum length: 1 line Information separated by vertical strokes, with two spaces on either side Disclaimer information may also be appear in this area. Place flush left, aligned at bottom, 8-10pt Arial Regular, white IBM logo must not be moved, added to, or altered in any way. Indications in green = Live content Indications in white = Edit in master Indications in blue = Locked elements Indications in black = Optional elements Presentation title: 28pt Arial Regular, black Recommended maximum length: 2 lines Group name: 17pt Arial Regular, white Maximum length: 1 line Copyright: 10pt Arial Regular, white Template release: Oct 02 For the latest, go to For client presentations, clients logo may go in this area Contract Management in IT-Outsourcing- und Service-Projekten Lehrstuhl für Datenbanken und Informationssysteme 03. November 2006 Jena Friedrich-Schiller-Universität

C & N | Christof Höfner | Tutorium Friedrich Schiller Universität © 2006 IBM Corporation IBM logo must not be moved, added to, or altered in any way. Background should not be modified. Title/subtitle/confidentiality line: 10pt Arial Regular, white Maximum length: 1 line Information separated by vertical strokes, with two spaces on either side Slide heading: 28pt Arial Regular, blue R120 | G137 | B251 Maximum length: 2 lines Slide body: 18pt Arial Regular, black Square bullet color: teal R045 | G182 | B179 Recommended maximum text length: 5 principal points Group name: 14pt Arial Regular, white Maximum length: 1 line Copyright: 10pt Arial Regular, white Optional slide number: 10pt Arial Bold, white Template release: Oct 02 For the latest, go to Indications in green = Live content Indications in white = Edit in master Indications in blue = Locked elements Indications in black = Optional elements Vertragsdurchführung – Contract Management 2 Inhalt Vertragsumfeld Was passiert nach Unterschrift? Organisationsumfeld Contract Management

C & N | Christof Höfner | Tutorium Friedrich Schiller Universität © 2006 IBM Corporation IBM logo must not be moved, added to, or altered in any way. Background should not be modified. Title/subtitle/confidentiality line: 10pt Arial Regular, white Maximum length: 1 line Information separated by vertical strokes, with two spaces on either side Slide heading: 28pt Arial Regular, blue R120 | G137 | B251 Maximum length: 2 lines Slide body: 18pt Arial Regular, black Square bullet color: teal R045 | G182 | B179 Recommended maximum text length: 5 principal points Group name: 14pt Arial Regular, white Maximum length: 1 line Copyright: 10pt Arial Regular, white Optional slide number: 10pt Arial Bold, white Template release: Oct 02 For the latest, go to Indications in green = Live content Indications in white = Edit in master Indications in blue = Locked elements Indications in black = Optional elements Vertragsdurchführung – Contract Management 3 Komplexes Vertragsumfeld I 3/3 IT- Outsourcing- und Service-Verträge werden zunehmend komplexer (Langfristigkeit, Flexibilität, "on demand") IT-Technologie entwickelt sich schnell weiter, die Verträge müssen dies abbilden oder laufend angepasst werden Auftraggeber verhandeln mangels Spezialwissen immer öfter mit Hilfe externer Consultants (technisch / juristisch / kommerziell)

C & N | Christof Höfner | Tutorium Friedrich Schiller Universität © 2006 IBM Corporation IBM logo must not be moved, added to, or altered in any way. Background should not be modified. Title/subtitle/confidentiality line: 10pt Arial Regular, white Maximum length: 1 line Information separated by vertical strokes, with two spaces on either side Slide heading: 28pt Arial Regular, blue R120 | G137 | B251 Maximum length: 2 lines Slide body: 18pt Arial Regular, black Square bullet color: teal R045 | G182 | B179 Recommended maximum text length: 5 principal points Group name: 14pt Arial Regular, white Maximum length: 1 line Copyright: 10pt Arial Regular, white Optional slide number: 10pt Arial Bold, white Template release: Oct 02 For the latest, go to Indications in green = Live content Indications in white = Edit in master Indications in blue = Locked elements Indications in black = Optional elements Vertragsdurchführung – Contract Management 4 Komplexes Vertragsumfeld II Vertragsinhalte und deren korrekte Umsetzung entscheiden über die weitere Geschäftsbeziehung und deren Erfolg Direkte Beziehung zwischen Qualität der Vertragsinhalte und der kaufmännischen Resultate Internationale Vertragsbeziehungen mehrere Vertragsparteien / Organisationseinheiten involviert

C & N | Christof Höfner | Tutorium Friedrich Schiller Universität © 2006 IBM Corporation IBM logo must not be moved, added to, or altered in any way. Background should not be modified. Title/subtitle/confidentiality line: 10pt Arial Regular, white Maximum length: 1 line Information separated by vertical strokes, with two spaces on either side Slide heading: 28pt Arial Regular, blue R120 | G137 | B251 Maximum length: 2 lines Slide body: 18pt Arial Regular, black Square bullet color: teal R045 | G182 | B179 Recommended maximum text length: 5 principal points Group name: 14pt Arial Regular, white Maximum length: 1 line Copyright: 10pt Arial Regular, white Optional slide number: 10pt Arial Bold, white Template release: Oct 02 For the latest, go to Indications in green = Live content Indications in white = Edit in master Indications in blue = Locked elements Indications in black = Optional elements Vertragsdurchführung – Contract Management 5 … und bei Vertragsende? – Post-Sales / Vertragserfüllung Joint Verification: gemeinsame Überprüfung der im Vertrag definierten Annahmen. Folge: "gaps" ausgleichen Vertragsänderungen: IT - Entwicklungen, neue Anforderungen das Unternehmen des Kunden ändert sich, Vertragssteuerung: Verträge mit Unterlieferanten (intern / extern), Einkauf, int.deals Vertragscontrolling: erbringen beide Seiten die Leistungen wie im Vertrag festgelegt? Rahmenverträge > einzelne Angebote "Governance: wer spricht mit wem, Gremien / Aufgaben / Prozesse Vertragsende Rückabwicklung / Auflösung: Ablauf, Leistungen, Verantwortung für einzelne Schritte, neuer Service-Provider

C & N | Christof Höfner | Tutorium Friedrich Schiller Universität © 2006 IBM Corporation IBM logo must not be moved, added to, or altered in any way. Background should not be modified. Title/subtitle/confidentiality line: 10pt Arial Regular, white Maximum length: 1 line Information separated by vertical strokes, with two spaces on either side Slide heading: 28pt Arial Regular, blue R120 | G137 | B251 Maximum length: 2 lines Slide body: 18pt Arial Regular, black Square bullet color: teal R045 | G182 | B179 Recommended maximum text length: 5 principal points Group name: 14pt Arial Regular, white Maximum length: 1 line Copyright: 10pt Arial Regular, white Optional slide number: 10pt Arial Bold, white Template release: Oct 02 For the latest, go to Indications in green = Live content Indications in white = Edit in master Indications in blue = Locked elements Indications in black = Optional elements Vertragsdurchführung – Contract Management 6 Umfeld des Contract Managers Project Office Gesamte Administration Einkauf Rechtsabteilung

C & N | Christof Höfner | Tutorium Friedrich Schiller Universität © 2006 IBM Corporation IBM logo must not be moved, added to, or altered in any way. Background should not be modified. Title/subtitle/confidentiality line: 10pt Arial Regular, white Maximum length: 1 line Information separated by vertical strokes, with two spaces on either side Slide heading: 28pt Arial Regular, blue R120 | G137 | B251 Maximum length: 2 lines Slide body: 18pt Arial Regular, black Square bullet color: teal R045 | G182 | B179 Recommended maximum text length: 5 principal points Group name: 14pt Arial Regular, white Maximum length: 1 line Copyright: 10pt Arial Regular, white Optional slide number: 10pt Arial Bold, white Template release: Oct 02 For the latest, go to Indications in green = Live content Indications in white = Edit in master Indications in blue = Locked elements Indications in black = Optional elements Vertragsdurchführung – Contract Management 7 Rollen und Verantwortung Contract Manager Finanz Qualitätssicherung Projektleiter Projekt Office Manager Vertragliches Consulting / Support Ermittlung der Kostenbasis / Preiskalkulation Risiko Einschätzung als Kalkulationsgrundlage Verantwortung für die gesamte Kundenbeziehung Prozessverantwortung / administrative Leitung

C & N | Christof Höfner | Tutorium Friedrich Schiller Universität © 2006 IBM Corporation IBM logo must not be moved, added to, or altered in any way. Background should not be modified. Title/subtitle/confidentiality line: 10pt Arial Regular, white Maximum length: 1 line Information separated by vertical strokes, with two spaces on either side Slide heading: 28pt Arial Regular, blue R120 | G137 | B251 Maximum length: 2 lines Slide body: 18pt Arial Regular, black Square bullet color: teal R045 | G182 | B179 Recommended maximum text length: 5 principal points Group name: 14pt Arial Regular, white Maximum length: 1 line Copyright: 10pt Arial Regular, white Optional slide number: 10pt Arial Bold, white Template release: Oct 02 For the latest, go to Indications in green = Live content Indications in white = Edit in master Indications in blue = Locked elements Indications in black = Optional elements Vertragsdurchführung – Contract Management 8 Aufgabenstellung - Überblick Contract Management bildet die interne Schnittstelle zu Einkauf, Vertrieb und Projektmanagement, mit dem Ziel, einen umfassenden Überblick über vertragliche, technische und kommerzielle Projektthemen zu haben. Contract Manager haben das Gesamtbild, insbesondere die wirtschaftliche Integrität des Vertrages und die Kundenbeziehung im Auge.

C & N | Christof Höfner | Tutorium Friedrich Schiller Universität © 2006 IBM Corporation IBM logo must not be moved, added to, or altered in any way. Background should not be modified. Title/subtitle/confidentiality line: 10pt Arial Regular, white Maximum length: 1 line Information separated by vertical strokes, with two spaces on either side Slide heading: 28pt Arial Regular, blue R120 | G137 | B251 Maximum length: 2 lines Slide body: 18pt Arial Regular, black Square bullet color: teal R045 | G182 | B179 Recommended maximum text length: 5 principal points Group name: 14pt Arial Regular, white Maximum length: 1 line Copyright: 10pt Arial Regular, white Optional slide number: 10pt Arial Bold, white Template release: Oct 02 For the latest, go to Indications in green = Live content Indications in white = Edit in master Indications in blue = Locked elements Indications in black = Optional elements Vertragsdurchführung – Contract Management 9 Aufgabenstellung des Contract Managers Zwei Hauptlinien 1) Juristische / vertragliche Unterstützung von Key Account Managern 2) Unterstützung von Projektleitern "großer" IT-Outsourcing- und Service-Projekte

C & N | Christof Höfner | Tutorium Friedrich Schiller Universität © 2006 IBM Corporation IBM logo must not be moved, added to, or altered in any way. Background should not be modified. Title/subtitle/confidentiality line: 10pt Arial Regular, white Maximum length: 1 line Information separated by vertical strokes, with two spaces on either side Slide heading: 28pt Arial Regular, blue R120 | G137 | B251 Maximum length: 2 lines Slide body: 18pt Arial Regular, black Square bullet color: teal R045 | G182 | B179 Recommended maximum text length: 5 principal points Group name: 14pt Arial Regular, white Maximum length: 1 line Copyright: 10pt Arial Regular, white Optional slide number: 10pt Arial Bold, white Template release: Oct 02 For the latest, go to Indications in green = Live content Indications in white = Edit in master Indications in blue = Locked elements Indications in black = Optional elements Vertragsdurchführung – Contract Management 10 Contract Management I Juristische / vertragliche Unterstützung von Key Account Managern bei der Angebotserstellung während der gesamten Vertragsverhandlungen bei technischen, kommerziellen oder gesetzlichen Änderungen in der Phase der Vertragserfüllung "auf Abruf"

C & N | Christof Höfner | Tutorium Friedrich Schiller Universität © 2006 IBM Corporation IBM logo must not be moved, added to, or altered in any way. Background should not be modified. Title/subtitle/confidentiality line: 10pt Arial Regular, white Maximum length: 1 line Information separated by vertical strokes, with two spaces on either side Slide heading: 28pt Arial Regular, blue R120 | G137 | B251 Maximum length: 2 lines Slide body: 18pt Arial Regular, black Square bullet color: teal R045 | G182 | B179 Recommended maximum text length: 5 principal points Group name: 14pt Arial Regular, white Maximum length: 1 line Copyright: 10pt Arial Regular, white Optional slide number: 10pt Arial Bold, white Template release: Oct 02 For the latest, go to Indications in green = Live content Indications in white = Edit in master Indications in blue = Locked elements Indications in black = Optional elements Vertragsdurchführung – Contract Management 11 Contract Management I - Einsatzmöglichkeiten Ansprechpartner für ein Geschäftssegment z. B. Finanz, Öffentliche Hand, Handel, Industrie, für spezielle Großkunden "key accounts" Branchenwissen erforderlich / hilfreich Koordination und Bearbeitung unterschiedlicher Verträge Synergieeffekte in vertraglichen Geschäftsbeziehungen, z. B. NDAs, Rahmenverträge Zusammenarbeit mit der Rechtsabteilung abhängig von der Unternehmensstruktur

C & N | Christof Höfner | Tutorium Friedrich Schiller Universität © 2006 IBM Corporation IBM logo must not be moved, added to, or altered in any way. Background should not be modified. Title/subtitle/confidentiality line: 10pt Arial Regular, white Maximum length: 1 line Information separated by vertical strokes, with two spaces on either side Slide heading: 28pt Arial Regular, blue R120 | G137 | B251 Maximum length: 2 lines Slide body: 18pt Arial Regular, black Square bullet color: teal R045 | G182 | B179 Recommended maximum text length: 5 principal points Group name: 14pt Arial Regular, white Maximum length: 1 line Copyright: 10pt Arial Regular, white Optional slide number: 10pt Arial Bold, white Template release: Oct 02 For the latest, go to Indications in green = Live content Indications in white = Edit in master Indications in blue = Locked elements Indications in black = Optional elements Vertragsdurchführung – Contract Management 12 Contract Management II Unterstützung von Projektleitern "großer" Outsourcing- und Service-Projekte Während der Endphase der Vertragsverhandlungen Vor allem in der Phase der Vertragserfüllung Bei der Vertragsbeendigung Präsenz des Contract Managers im Core Team!!

C & N | Christof Höfner | Tutorium Friedrich Schiller Universität © 2006 IBM Corporation IBM logo must not be moved, added to, or altered in any way. Background should not be modified. Title/subtitle/confidentiality line: 10pt Arial Regular, white Maximum length: 1 line Information separated by vertical strokes, with two spaces on either side Slide heading: 28pt Arial Regular, blue R120 | G137 | B251 Maximum length: 2 lines Slide body: 18pt Arial Regular, black Square bullet color: teal R045 | G182 | B179 Recommended maximum text length: 5 principal points Group name: 14pt Arial Regular, white Maximum length: 1 line Copyright: 10pt Arial Regular, white Optional slide number: 10pt Arial Bold, white Template release: Oct 02 For the latest, go to Indications in green = Live content Indications in white = Edit in master Indications in blue = Locked elements Indications in black = Optional elements Vertragsdurchführung – Contract Management 13 Contract Management II - Einsatzmöglichkeiten Große" Outsourcing-Projekte oder Service-Projekte Groß" = mindestens 2 Jahre Laufzeit (Implementierungsaufwand) Vertragsvolumen (Personalkosten) Komplexität des Vertragsumfeldes Verträge mit mehreren Vertragsparteien Leistungserbringung in mehreren Ländern Permanente Vertragsanpassungen wahrscheinlich, Chancen für Neugeschäft Intensiver juristischer / vertraglicher Betreuungsbedarf