Das 7. EU-Rahmenprogramm :

Slides:



Advertisements
Ähnliche Präsentationen
Alexander Stuber & Partner
Advertisements

Weinviertel-Südmähren-Westslowakei
Service Oriented Architectures for Remote Instrumentation
PRESENTATION HEADLINE
Peter S. Niess Steinbeis-Europa-Zentrum
Environmental Assessment in Germany Environmental Assessment in Federations: Current Dynamics and Emerging Issues September , 2009 Ottawa, Canada.
interdisciplinary joint projects method-oriented platforms
Vernetzung von Repositorien : DRIVER Guidelines Dr Dale Peters, SUB Goettingen 4. Helmholtz Open Access Workshop Potsdam, 17 Juni 2008.
PSI and Competition The General Framework
Forstliche Versuchs- und Forschungsanstalt Baden - Württemberg Konstantin von Teuffel National Forest Research Institutes in Europe A capacity to provide.
“Chancengleichheit und Anti-Diskriminierung”
H - A - M - L - E - IC T Teachers Acting Patterns while Teaching with New Media in the Subjects German, Mathematics and Computer Science Prof. S. Blömeke,
Herzlich Willkommen zum Informations-Forum: SAP Interoperabilität
1 | R. Steinbrecher | IMK-IFU | KIT – die Kooperation von Forschungszentrum Karlsruhe GmbH und Universität Karlsruhe (TH) Natural Sources SNAP11.
First Seminar in Brussels, 15th of December 2010
Die Senatorin für Arbeit, Frauen, Gesundheit, Jugend und Soziales ESF-Verwaltungsbehörde Freie Hansestadt Bremen Hildegard Jansen, head of Unit labour.
Steinbeis Forschungsinstitut für solare und zukunftsfähige thermische Energiesysteme Nobelstr. 15 D Stuttgart WP 4 Developing SEC.
FAST-LAIN Meeting May 2011 in Saarbrücken Partner Profile – Template Please use information from your FAST-LAIN work book for your profile in the.
DissOnline / Digitale Dissertationen Dr. P. Schirmbacher Offene Standards und internationale / nationale Abstimmung Gliederung: 1.Open Archive.
Side Event. Lebensmittel erfolgreich exportieren - Chancenmarkt Zentral- und Südosteuropa Montag, 14. November 2011 Palais Kaufm. Verein.
Das Integrierte EU-Projekt ORCHESTRA - Konzeption einer offenen Dienstearchitektur im Kontext der INSPIRE-Initiative Ulrich Bügel, Thomas Usländer, Fraunhofer.
C. Kottmeier, C. Hauck, G. Schädler, N. Kalthoff
NUMEX – Numerical experiments for the GME Fachhochschule Bonn-Rhein-Sieg Wolfgang Joppich PFTOOL - Precipitation forecast toolbox Semi-Lagrangian Mass-Integrating.
1 Geistes-, Natur-, Sozial- und Technikwissenschaften – gemeinsam unter einem Dach The Academic Information Domain DGI Top-Tech-Trends Panel 2010 Dr. Wolfram.
Institut für Wasserbau Stuttgart Geodätisches Institut Stuttgart Institut für Meteorologie und Klimaforschung IMK-IFU SPP 1257 DIRECT WATERBALANCE An interdisciplinary.
K. Butterbach-Bahl | ERSEC International Conference| 05/05/09 KIT – die Kooperation von Forschungszentrum Karlsruhe GmbH und Universität Karlsruhe (TH)
Fachabteilung 16A Überörtliche Raumplanung Cross border co-operation from the view of a public administration unit.
Deutsche Gesellschaft für Technische Zusammenarbeit GmbH Integrated Experts as interface between technical cooperation and the private sector – An Example.
Methods Fuzzy- Logic enables the modeling of rule based knowledge by the use of fuzzy criteria instead of exact measurement values or threshold values.
Institut für Meteorologie und Klimatologie Universität Hannover Solare Strahlung – Stand und Perspektiven ihrer Erforschung Gunther Seckmeyer Short Notice.
KAE praxis verstehen chancen erkennen zukunft gestalten understanding reality facing challenges creating future Laboratory of Integrated Energy Systems.
Medical Universities‘ Teaching Staff Training in Bochum Germany
Weather forecasts and crisis management Michael Staudinger
Case Study Session in 9th GCSM: NEGA-Resources-Approach
Machen Sie sich schlau am Beispiel Schizophrenie.
A thrilling star movie THE GUIDE 1 SPIN network meeting Wolfgang Pojer.
Initiative New Quality of Work (INQA) 16. Mai 2013 Dortmund
Bank aus Verantwortung Fourth EU-Central Asia High Level Conference: Platform for Environment and Water Cooperation – Financing Climate Change Adaptation.
No.: FP7/1 ©PROVISO Structure of FP 7 & EURATOM (state: 20/4/2005) COOPERATION 9 thematic areas: CAPACITIESPEOPLE Strengthening the human potential in.
Centre for Public Administration Research E-Government for European Cities Thomas Prorok
BAS5SE | Fachhochschule Hagenberg | Daniel Khan | S SPR5 MVC Plugin Development SPR6P.
Bundesamt für Wehrtechnik und Beschaffung THE COST EFFECTIVE DEVELOPMENT OF HLA FEDERATIONS FOR COMPUTER- ASSISTED EXERCISES (CAX) K. Pixius 23-Sep-02.
Bilateral coordination for the Enhancement and Development of S&T Partnerships between the EU and the USA Internationale strategische Kooperation EU –
International Program in 109 countries Atmosphere/Climate, Hydrology, Soil, Land Cover/Biology, Phenology and 4 NEW NSF Earth System Science.
INTAKT- Interkulturelle Berufsfelderkundungen als ausbildungsbezogene Lerneinheiten in berufsqualifizierenden Auslandspraktika DE/10/LLP-LdV/TOI/
VOM DCECI ZUM DCI UND WAS SIND EIGENTLICH FPs?. Financial Perspectives = Finanzielle Vorausschau Verhandlungen seit September 2004 ursprünglicher.
Ministerium für Umwelt und Naturschutz, Landwirtschaft und Verbraucherschutz des Landes Nordrhein-Westfalen Modelling of the carbon accumulation in beech.
BOKU – University of Natural Resources and Applied Life Sciences Department of Forest and Soil Sciences Has undergone several sever changes during the.
Presentation Civil Engineering Sciences Faculty of Civil Engineering Sciences Graz, May Civil Engineering Sciences and Economics – Civil Engineering.
Institut für Öffentliche Dienstleistungen und Tourismus Informal learning for regional development Manfred Walser Towards a Knowledge Society: Is Knowledge.
Ziele und Informationen
Berner Fachhochschule Hochschule für Agrar-, Forst- und Lebensmittelwissenschaften HAFL Recent activities on ammonia emissions: Emission inventory Rindvieh.
Besuch Büro Nairobi 2. – 9. Februar 2014
Österreichische Erfolge in NMP sowie Tipps zur Einreichung Nanowissenschaften, Nanotechnologien, Werkstoffe und neue Produktionstechnologien Gerald Kern.
The NAMA Facility – Support for the Implementation of NAMAs Subsidiary Body for Implementation in-session workshop on NAMAs Ben Lyon, DECC Norbert Gorißen,
ESSnet Workshop Conclusions.
1 von 10 ViS:AT Abteilung IT/3, IT – Systeme für Unterrichtszwecke ViS:AT Österreichische Bildung auf Europaniveau BM:UKK Apple.
Wind Energy in Germany 2004 Ralf Christmann, BMU Joachim Kutscher, PTJ
Globale Plattform-Entwicklung für steigende Nachhaltigkeit
The NAMA Facility – Support for the Implementation of NAMAs Subsidiary Body for Implementation in-session workshop on NAMAs Ben Lyon, DECC Norbert Gorißen,
Erfolgreich im 7. EU-Rahmenprogramm DI Gerald Kern T: e:
Genderaspekte in EU-geförderten Forschungsprojekten.
Lehrstuhl für Waldbau, Technische Universität MünchenBudapest, 10./11. December 2006 WP 1 Status (TUM) Bernhard Felbermeier.
Social Media and Social Innovation a Manifesto
GenoMik: Funding of Genome Research on Bacteria 2001 – 2006 Network 1 Topic:Genome Research on Bacteria relevant for Agriculture, Environment and Biotechnology.
KGE Kommunalgrund GmbH Entwicklungsträger der Landeshauptstadt Magdeburg Presentation for the REDIS Project at the Interim Conference.
Water Framework Directive and Monitoring in the Wadden Sea of
An Approach to standardize a Service Life Cycle Management
BM H. Faßmann, FFG-GF H. Egerth und ERC-Preisträger N. Maulide
Management System Regulatory Body Operator
 Präsentation transkript:

Das 7. EU-Rahmenprogramm 2007-2013: EU-Fördermöglichkeiten im Bereich Umwelt Andrea Hoffmann und Susanne Dragosits Bereich für Europäische und Internationale Programme (EIP) der FFG

Content Struktur und Beteiligungsregeln des 7. EU-RP Erfahrungen aus den ersten Ausschreibungen Einreichmöglichkeiten im Thema Umwelt, 2. Ausschreibung Einreichmöglichkeiten in anderen Themen mit Umweltbezug

Das 7. EU-Rahmenprogramm Beweggründe zur Teilnahme Was spricht FÜR eine Teilnahme am Rahmenprogramm? Europäische Vernetzung und Sichtbarkeit Reputation Verwirklichung fach- und länderübergreifender Projekte Internationale Kontakte „Am Ball“ bleiben (beyond the state-of-the-Art) Was spricht GEGEN eine Teilnahme am Rahmenprogramm? Bürokratischer Aufwand Zeit/Lange Fristen - Top-Down Ansatz bei vielen Ausschreibungen - Abhängigkeit von Partnern

Das 7. EU-Rahmenprogramm Struktur und Budget (1) ´Cooperation´ ‘Ideas’ -Frontier Research Single Teams, Criteria Excellence, European Research Council 1. Health 2. Food, Agriculture and Fisheries, and Biotechnology ‘People’ Mobility and Career Development of People 3. Information Communication Technologies 4. Nanosciences + Nanotechnologies, Materials + new Production Technologies ‘Capacities’ Research Infrastructure Research for the benefit of SMEs Regions of Knowledge Research Potential Science in Society Coherent development of research policies, International cooperation 5. Energy 6. Environment (incl. climate change) Struktur, Bottom-up/Top down Förderlinien 7. Transport (incl. Aeronautics) 8. Socio-economic sciences + the Humanities 9. Space 10. Security

Das 7. EU-Rahmenprogramm Struktur und Budget (2) Cooperation 32.413 Health 6.100 Biotech, Food, Agriculture 1.935 Information Society 9.050 Nanomaterials Production 3.475 Energy 2.350 Environment 1.890 Transport 4.160 Socio-economic Research 623 Space 1.430 Security 1.400 Ideas 7.510 People 4.750 Capacities 4.097 Total: 50,521 billion EUR (incl. Joint Research Centre 1,7 Mrd)

Guide for negotiation etc Das 7. EU-Rahmenprogramm Implementierung (1) Electronic submission system Specific programmes Work programme year N Rahmen-programm Guides for proposers Guides for applicants Call X Call Programme content Guide for negotiation etc “FP7 in brief”

Das 7. EU-Rahmenprogramm Implementierung (2) Förderformen „Instrumente“ Verbundprojekte (large scale integrating projects, small and medium focused research projects) Exzellenznetze (NoE) Koord.- und Unterstützungsmaßnahmen (CSA) Forschung für spezielle Zielgruppen (insbes. KMU, CSO) Pionierforschung (Ideas) Marie-Curie Maßnahmen

Das 7. EU-Rahmenprogramm Teilnahmebedingungen (1) Teilnahme steht jeder Rechtsperson offen Teilnahme von Partnerländer der internat. Kooperation (ICPC) möglich: http://cordis.europa.eu/fp7/partner-countries_en.html Mindestteilnahmebedingungen: Mind. 3 voneinander unabhängige Teilnehmer aus 3 verschiedenen Mitgliedstaaten (MS) oder assoziierten Staaten (AS) - bei CSO Projekten: zumindest einer davon eine civil society organisation Pionierforschung „frontier research“: mind. 1 Teilnehmer aus einem MS oder einem AS Unterstützungsmaßnahmen, Maßnahmen zur Aus- und Weiterbildung: mind. 1 Teilnehmer

Welche Länder können an FP7 Projekten teilnehmen? prinzipiell „ALLE“ Member States – EU 27 Associated Countries Iceland, Liechtenstein, Norway Switzerland, Israel Turkey, Croatia, Serbia, Macedonia (FYROM) International Cooperation Partner Countries (ICPC) ACP Countries (African, Carribean, Pacific) Asia EECA (Eastern Europe and Central Asia) Latin America MPC (Mediterranean Partner Countries) WBC (Western Balkan Countries) Other Third Countries: USA, Canada, Australia etc.

ICPC als zusätzliche Partner ICPC Partner VERPFLICHTEND Das 7. EU-Rahmenprogramm Teilnahmebedingungen (2) - ICPC “Offen” für alle Aktivitäten in Cooperation Mind. 3 Teilnehmer aus 3 verschiedenen Mitgliedstaaten (MS) oder assoziierten Staaten (AS) - voneinander unabhängig Specific international cooperation actions (SICA) Mindestens 4 voneinander unabhängige Teilnehmer: Mind. 2 davon aus verschiedenen Mitgliedstaaten (MS) oder assoziierten Staaten (AS) Mind. 2 davon aus verschiedenen International Cooperation Partner Countries ICPC als zusätzliche Partner ICPC Partner VERPFLICHTEND

Das 7. EU-Rahmenprogramm Förderhöhen Maximale Erstattungs-quoten F & E (einschl. relevanter Innovations- u Koordinierungs-aktivitäten) Demonstrations-aktivitäten Ausbildungs-maßnahmen Management Konsortium Andere spezifische Aktivitäten Verbund-projekte 50 % 75 % * 100 % Exzellenznetze Koordinierungs-Unterstützungs-maßnahmen * Öffentl. Einrichtungen, Hochschulen, (non-profit) Forschungszentren, KMU 11

durchschnittliche Bewilligungsquote: 17% ERC ist noch nicht ausgewertet – immer beachten, dass es eine Momentaufnahme ist

Space sehr erfolgreich ERA – NET sehr erfolgreich

Das 7. EU-Rahmenprogramm AT Beteiligungen 1. Ausschreibung Umwelt Pressures on Environment and Climate Environment and Health Natural Hazards Sust. Mgmt of Ressources & Biodiversity Mgmt of Marine Environments Environmental Technologies Protection of Cultural Heritage Earth Observation Assessment Tools for Sust. Development

Das 7. EU-Rahmenprogramm Erfahrungen der 1. Ausschreibung Umwelt EPSS Einreichung: B-Teil zum Download spät vorhanden, elektr. Submission nicht am letzten Tag (Test) -> fehlende Info bei A-Formularen Einhaltung der Seitenbeschränkung wichtig Einhaltung der max. Fördersumme der EK (eligibility criterium) Extrem ungleiche Verteilung der eingereichten Projekte pro Topic -> 20-40 Projekte versus 0-2 Projekte Kein 2-stufiges Verfahren für IPs -> viel Aufwand und tlw. sehr hohe Konkurrenz 15

Das 7. EU-Rahmenprogramm Was vor der Einreichung zu beachten ist? Das geplante Projekt muss zur strategischen Entwicklung Ihrer Organisation passen Reichen Sie kein Projekt ausschließlich wegen der potentiellen Förderung ein Besprechen Sie Ihre Projektidee mit den ExpertInnen der FFG Erhöhen Sie Ihre Chancen durch ein optimal vorbereitetes Projekt Auswahl von KoordinatorIn und Projektteam Innovative Projektidee mit hohem FuE Gehalt Beschreibung des Projektes im Antrag

Das 7. EU-Rahmenprogramm 2. Ausschreibung Umwelt (1) Call Identifier: FP7-ENV-2008-1 Einreichprozedere: einstufig Veröffentlichung: 30. November 2007 Ende Einreichfrist: 25. Februar 2008 Budget: 212 Mio € Evaluierung: März-April 2008 Vertragsverhandlung: ab Juni 2008 EK Infotage: http://cordis.europa.eu/fp7/environment/events_en.html 3. Call in Vorbereitung, Publikation im Sommer 2008 geplant Roadmap mit Forschungsthemen 2009 in Bearbeitung Vertragsabschluß im Herbst 2008 INFO-DAY FP7: Forecasting methods and assessment tools for sustainable development 19th December 2007, Brussels (Belgium) ENVIRONMENTAL TECHNOLOGIES: Info Day FP7-2nd call 2008 13th December 2007, Brussels (Belgium) 17

Das 7. EU-Rahmenprogramm 2. Ausschreibung Umwelt (2) eligibility criterion Evaluations March-April 2008 contract negotiations June 2008 *Ausnahmen: ENV.2008.1.1.6.2. bis 1 Mio €, sub-activity 6.4.2. bis 1,5 Mio € **Ausnahmen: ENV.2008.1.1.6.2., sub-activity 6.4.2. ***Ausnahmen: ENV.2008.1.1.1.1 (4 -10 Mio € ), ENV.2008.1.1.4.1 (4-8 Mio €), ENV.2008.1.1.5.2 (4-5 Mio €), ENV.2008.2.2.1.2 (4-8 Mio €), ENV.2008.3.2.1.1 (4-5 Mio €), ENV.2008.3.3.2.1 (4-5 Mio €) 18

Das 7. EU-Rahmenprogramm Gemeinsame Ausschreibung Umwelt und Nano Call Identifier: FP7-ENV/NMP-2008-2 Einreichprozedere: einstufig Thema (ENV.2008.3.1.1.2.): Nanotechnologies for water treatment Veröffentlichung: 30. November 2007 Einreichfrist: 25. Februar 2008 Budget: 10 Mio € Evaluierung: März-April 2008 Vertragsverhandlung: ab Juni 2008 Funding Scheme: CP-FP bis 2,5 Mio € Fördersumme, keine Limitierung der Projektanzahl 19

Das 7. EU-Rahmenprogramm Themen der 2. Ausschreibung Umwelt 6.1. Climate Change, pollution and risks 6.2. Sustainable management of resources 6.3. Environmental Technologies Conservation and sustainable management of natural and man-made resources Evolution of marine environments Earth observation Forecasting methods and assessment tools Pressures on environment and climate Environment and health Natural Hazards Water, Soil, Waste, Clean Technologies, Built Environment Protection of cultural heritage Technology asessment, verfication, testing 6.4. Earth observation and assessment tools Activities Subactivities

Area 6.1.1.2. Emissions and Pressures: Natural and anthropogenic Activity 6.1. CLIMATE CHANGE, POLLUTION, AND RISKS Sub-activity 6.1.1. Pressures on environment and climate 42 Mio € Area 6.1.1.1. The Earth System and Climate: Functioning & abrupt changes ENV.2008.1.1.1.1. Sea-Level Rise: Trends in contributions from continental ice, processes and links to climate change (CP-IP, EC contribution 4-10 Mio €) Area 6.1.1.2. Emissions and Pressures: Natural and anthropogenic ENV.2008.1.1.2.1. Climate-chemistry interactions in the stratosphere related to ozone depletion (CP-FP) Area 6.1.1.3. The Global Carbon cycle - Greenhouse Gas budgets ENV.1.1.3.1. Impacts of climate variability, extreme events and increasing atmospheric greenhouse gas concentrations on terrestrial carbon storage, exchange flows and soil carbon dynamics (CP-FP, Policy relevant topic) Area 6.1.1.4. Future Climate ENV.2008.1.1.4.1. New components in Earth System modelling for better climate projections (CP-IP, EC contribution 4-8 Mio €) ICPC ICPC ICPC Relevanz, aber kein SICA Thema!

Area 6.1.1.5. Climate Change Natural and Socio-economic Impacts Activity 6.1. CLIMATE CHANGE, POLLUTION, AND RISKS Sub-activity 6.1.1. Pressures on environment and climate 42 Mio € Area 6.1.1.5. Climate Change Natural and Socio-economic Impacts ENV.2008.1.1.5.1. Addressing deforestation in tropical areas: Greenhouse gas emissions, socio-economic drivers and impacts, and policy options for emissions reduction (SICA, CP-FP, Policy relevant topic) ENV.2008.1.1.5.2. Climate change impacts and Thresholds on Arctic Ocean Ecosystems (CP-IP, EC contribution 4-5 Mio €) Area 6.1.1.6. Response strategies: Adaptation, Mitigation and Policies ENV.2008.1.1.6.1. Impacts of Himalayan glaciers retreat and monsoon pattern change on the water resources in Northern India, and adaptation strategies (SICA, CP-FP, Policy relevant topic) ENV.2008.1.1.6.2. Implications and risks of novel options to limit climate Change (CP-FP, Emerging Needs, EC contribution < 1 Mio €/project) ENV.2008.1.1.6.3. Multiple pathways analysis of emerging economies in a post-Kyoto regime (CSA-SA, Policy relevant topic) ICPC

Area 6.1.2.1. Health effects of exposure to environmental stressors Activity 6.1. CLIMATE CHANGE, POLLUTION, AND RISKS Sub-activity 6.1.2. Environment and Health 20 Mio € Area 6.1.2.1. Health effects of exposure to environmental stressors ENV.2008.1.2.1.1. Health impacts of exposure to radiofrequency fields in childhood and adolescence (CP-FP) ENV.2008.1.2.1.2. Comparison of health risks in populations in the Arctic and selected areas in Europe due to the spreading of contaminants resulting from climate change (CP-FP) ENV.2008.1.2.1.3. European research network on noise and health (CSA-CA) ENV.2008.1.2.1.4. New, improved and validated biomarkers to investigate long-term health impacts of exposure to environmental pollutants (CP-FP) ENV.2008.1.2.1.5. Quantification of changing surface UV radiation levels and its impact on human health (CP-FP) ENV.2008.1.2.1.6. Databases based on European cohort studies and their exploitation for advancement of knowledge of environment-health relationships (CSA-CA) ICPC ICPC ICPC

Area 6.1.3.1. Hazard assessment, triggering factors and forecasting Activity 6.1. CLIMATE CHANGE, POLLUTION, AND RISKS Sub-activity 6.1.3. Natural hazards 14 Mio € Area 6.1.3.1. Hazard assessment, triggering factors and forecasting ENV.2008.1.3.1.1. Development of a common methodology and tools to evaluate earthquake hazard in Europe (CP-FP, Policy relevant topic) Area 6.1.3.2. Vulnerability assessment and societal impacts ENV.2008.1.3.2.1. Natural Hazards: Social perception, behaviour and responses to risks (CSA-CA) Area 6.1.3.3. Risk assessment and management ENV.2008.1.3.3.1. Prediction of triggering and risk assessment for Landslides (CP-IP, Policy relevant topic) ENV.2008.1.3.3.2. Preparedness and risk management for flash floods including generation of sediment and associated debris flow (CP-FP) Area 6.1.3.4. Multi-risk evaluation and mitigation strategies ENV.2008.1.3.4.1. Natural hazards in Europe: Coordinated research strategy between European and national levels (CSA-CA) ICPC ICPC

ENV.2008.2.1.2.1. Groundwater systems (CP-IP, Policy relevant topic) Activity 6.2. SUSTAINABLE MANAGEMENT OF RESOURCES Sub-activity 6.2.1. Conservation and sustainable management of natural and man-made resources and biodiversity 30 Mio € Area 6.2.1.2. Water resources ENV.2008.2.1.2.1. Groundwater systems (CP-IP, Policy relevant topic) ENV.2008.2.1.2.2. Clustering River Basins Twinning Initiatives and knowledge transfer (CSA-CA) ENV.2008.2.1.2.3. Assessing the ecological status of water bodies (CP-IP, Policy relevant topic) Area 6.2.1.3. Soil research and desertification ENV. 2008.2.1.3.1. Assessment of methods to combat desertification (CSA-SA, Policy relevant topic) ICPC ICPC

Activity 6.2. SUSTAINABLE MANAGEMENT OF RESOURCES Sub-activity 6.2.1. Conservation and sustainable management of natural and man-made resources and biodiversity 30 Mio € Area 6.2.1.4. Biodiversity ENV.2008.2.1.4.1. Improving the capacity to protect and manage the biodiversity of continental waters (CP-IP, Policy relevant topic) ENV.2008.2.1.4.2. Rehabilitation of data from biodiversity-related projects funded under previous framework programmes (CSA-SA) ENV.2008.2.1.4.3. Increasing the integration of biodiversity research results into policy making (CSA-SA, Policy relevant topic) ENV.2008.2.1.4.4. Scale dependency of sustainable use of biodiversity (CP-IP) Area 6.2.1.6. Integrated forest research ENV.2008.2.1.6.1. Development of adaptive forest management models (CP-IP)

Activity 6.2. SUSTAINABLE MANAGEMENT OF RESOURCES Sub-activity 6.2.2. Management of marine environments 20,5 Mio € Area 6.2.2.1. Marine resources ENV.2008.2.2.1.1. Monitoring and Evaluation of Spatially Managed Areas (SMA) (CP-IP, Policy relevant topic) ENV.2008.2.2.1.2. Deep-Sea ecosystems (CP-IP, EC contribution from EUR 4-8 Mio €) ENV.2008.2.2.1.3. Ecosystem approach to marine environment and Resources (CP-IP, Policy relevant topic)

Activity 6. 3. ENVIRONMENTAL TECHNOLOGIES Sub-activity 6. 3 Activity 6.3. ENVIRONMENTAL TECHNOLOGIES Sub-activity 6.3.1 Environmental technologies for observation, simulation, prevention, mitigation, adaptation, remediation and restoration of the natural and man-made environment 39 Mio € Area 6.3.1.1. Water ENV.2008.3.1.1.1. Rehabilitation technologies for degraded water systems presenting quantity and quality problems (CP-IP, Policy relevant topic) ENV.2008.3.1.1.2. Nanotechnologies for water treatment (CP-FP, EC contribution <2,5 Mio €, Call identifier FP7-ENV-NMP-2008-2) Area 6.3.1.2. Soil ENV.2008.3.1.2.1. Recovery of degraded soil resources (CP-FP, Policy relevant topic) Area 6.3.1.3. Waste ENV.2008.3.1.3.1. Waste prevention: Industrial networking and zero-waste entrepreneurship (CP-IP, Policy relevant topic) ENV.2008.3.1.3.2. Technologies for high added value production from Waste (CP-FP) SME SME SME SME KMU Beteiligung notwendig!

Area 6.3.1.4. Clean Technologies Activity 6.3. ENVIRONMENTAL TECHNOLOGIES Sub-activity 6.3.1 Environmental technologies for observation, simulation, prevention, mitigation, adaptation, remediation and restoration of the natural and man-made environment 39 Mio € SME Area 6.3.1.4. Clean Technologies ENV.2008.3.1.4.1. Substitution options for Brominated Flame Retardants (BFRs): a prototypical case for source control of Priority Pollutants in a Life Cycle Thinking perspective (CP-FP, Policy relevant topic) Area 6.3.1.5. Built environment ENV.2008.3.1.5.1. Innovative environmental technologies including design concepts and materials for the reduction of damage to the environment (CP-FP) Area 6.3.1.6. Marine environment ENV.2008.3.1.6.1. Development of automated sensing technologies for estuaries, coastal areas and seas (CP-FP) SME SME

Area 6.3.2.1. Assessment and conservation in cultural heritage Activity 6.3. ENVIRONMENTAL TECHNOLOGIES Sub-activity 6.3.2. Protection, conservation and enhancement of cultural heritage, including human habitat 9 Mio € Area 6.3.2.1. Assessment and conservation in cultural heritage ENV.2008.3.2.1.1. Development and application of methodologies, technologies, models and tools for damage assessment, monitoring and adaptation to climate change impacts (excluding extreme events) (CP-IP, EC contribution 4-5 Mio €) ENV.2008.3.2.1.2. "EU cultural heritage identity card" (CSA-CA) Area 6.3.2.2. Networking, knowledge transfer and optimisation of results in cultural heritage ENV.2008.3.2.2.1. Framework conditions to enhance most promising Prototypes (CP-FP) ICPC SME

Area 6.3.3.2 Technology Assessment Activity 6.3. ENVIRONMENTAL TECHNOLOGIES Sub-activity 6.3.3. Technology assessment, verification and testing 7 Mio € Area 6.3.3.1 Risk assessment of chemicals and alternative strategies for testing ENV.2008.3.3.1.1. Safety and risk assessment as the basis of risk-based management of chemicals and products in a global perspective and Alternative Testing Strategies (CSA-CA) . Area 6.3.3.2 Technology Assessment ENV.2008.3.3.2.1. Sustainability Assessment of Technologies (CP-IP, EC contribution 4-5 Mio €) Area 6.3.3.3 Environmental Technologies Verification and Testing ENV.2008.3.3.3.1. Harmonised approaches towards the development of international technology verification systems (CSA-CA, Policy relevant topic) SME KEINE Einreichungen mit AT Beteiligung ICPC

Activity 6.4. EARTH OBSERVATION AND ASSESSMENT TOOLS FOR SUSTAINABLE DEVELOPMENT Sub-activity 6.4.1. Earth and ocean observation systems and monitoring methods for the environment and sustainable development 21 Mio € Area 6.4.1.1. Integration of European activities within GEO ENV.2008.4.1.1.1. European Environment Earth Observation system supporting INSPIRE and compatible with the GEOSS (Global Earth Observation System of Systems) (CP-IP, Policy relevant topic) Area 6.4.1.2. Cross-cutting research activities relevant to GEO ENV.2008.4.1.2.1. Monitoring and observing oxygen depletion throughout the different Earth system components (CP-FP) Area 6.4.1.3. Earth Observation activities in emerging areas ENV.2008.4.1.3.1. Developing Earth Observation for the monitoring and prediction of environmental impacts from energy resource extraction, transportation and/or exploitation (CP-IP) Area 6.4.1.4. Developing capacity building activities in the domain of Earth observation in the new EU countries & in developing countries ENV.2008.4.1.4.1. Developing necessary research activities for capacity building relevant to Earth Observation and GEO in the Black Sea basin (SICA, CP-IP)

Activity 6.4. EARTH OBSERVATION AND ASSESSMENT TOOLS FOR SUSTAINABLE DEVELOPMENT Sub-activity 6.4.2. Forecasting methods and assessment tools for sustainable development taking into account differing scales of observation 12 Mio € Area 6.4.2.2. Sustainable development indicators ENV.2008.4.2.2.1. Engaging civil society in research on Sustainable Development indicators (BSG-CSO or CSA, Policy relevant topic) Area 6.4.2.3. Interplay between social, economic and ecological systems ENV.2008.4.2.3.1. Rethinking globalisation in the light of sustainable Development (CP-FP, EC contribution <1,5 Mio €) ENV.2008.4.2.3.2. Enhancing connectivity between research and policymaking in sustainable development (CSA-CA or CP-FP EC contribution <1,5 Mio €, Policy relevant topic)

Activity 6. 5. HORIZONTAL ACTIONS Sub-activity 6. 5. 1 Activity 6.5. HORIZONTAL ACTIONS Sub-activity 6.5.1. Dissemination and horizontal activities 2.5 Mio € ENV.2008.5.1.0.1. Development of a methodology to exploit the results and enhance impacts of EU environment research activities (CSA-SA) ENV.2008.5.1.0.2. Research excellence and major infrastructure in Russia and potential for S&T co-operation with EU partners in the area of the environment (CSA-SA, at least one Russian partner necessary) ICPC

Das 7. EU-Rahmenprogramm (2007-2013) COOPERATION – Kollaborative Forschung Vordefinierte Themen, modifizierte “Instrumente” IDEAS – Pionier Forschung Individuelle Anträge, Europäischer Forschungsrat PEOPLE – “Human Potential” Mobilität von ForscherInnen CAPACITIES – Forschungskapazitäten Infrastruktur, KMU, Wissensregionen,… Joint Research Center + EURATOM Seite 35

Weitere mögliche Themen im 7. RP Kooperation 32,365 1 Gesundheit 6,050 2 Lebensmittel, Landwirtschaft und Biotechnolog. 1,935 3 Informations- und Kommunikationstechnologien 9,110 4 Nano-, Werkstoff- & Produktionstechnologien 3,500 5 Energie 2,300 6 Umwelt 1,900 7 Verkehr (inkl. Luftfahrt) 4,180 8 Sozial-, Wirtschafts- & Geisteswissenschaften 0,610 9 Weltraum 1,430 10 Sicherheit 1,350 Ideen 7,510 Menschen 4,750 Kapazitäten 4,217 Total: 50,5 Mrd. EURO Seite 36 36

Gesundheit nächste Ausschreibung: Veröffentlichung: vorauss. Frühjahr/Sommer 2008 Ende der Einreichfrist: vorauss. Sommer/Herbst 2008 Budget: Informationen: http://rp7.ffg.at/health Themenauswahl: noch keine Themen vorhanden, aber umweltrelevante Themen können wieder vorkommen – Komplementarität und Synergie mit Umweltprogramm erwünscht Seite 37 37

Lebensmittel, Landwirtschaft und Biotechnologie 3. Ausschreibung: Veröffentlichung: 30.11.2007 Ende der Einreichfrist: 26.02.2008 (17:00 MEZ) Budget: ca. 96 Mio. Euro Informationen: http://rp7.ffg.at/fafb_ausschreibungen Themenauswahl: KBBE-2008-1-2-01: Development of appropriate indicators of the relationship between organic/low-input farming and biodiversity KBBE-2008-1-2-03: Assessment and mitigation of the impact of aquaculture on wild populations KBBE-2008-1-2-06: Forecasting forest diversity under the influence of climatic changes and the consequences for stability and productivity of forest ecosystems KBBE-2008-1-2-07: Forest energy – Short rotation forestry as a sustainable and eco-efficient land use management system for fossil fuels substitution within CDM-projects Seite 38 38

Informations- und Kommunikations- techologien (ICT) Thematische Schwerpunkte mit Umweltrelevanz: In der aktuellen Ausschreibung: keine nächste Ausschreibung: Veröffentlichung: 04.12.2007 Ende der Einreichfrist: 08.04.2008 Budget: ca. 265 Mio. Euro Informationen: http://rp7.ffg.at/ikt_ausschreibungen Vergangene relevante Themen (eventuell wieder im 4. Call) ICT for Environmental Management and Energy Efficiency Seite 39 39

Nano, Werkstoffe und Produktions- technologien (NMP) Thematische Schwerpunkte mit Umweltrelevanz: Wasserbehandlung, Nanopartikel im Gesundheit- und Umweltbereich nächste Ausschreibung: Veröffentlichung: 30.11.2007 Ende der Einreichfrist: 06.03.2008/24.04.2008 Budget: ca. 490 Mio. Euro Informationen: http://rp7.ffg.at/nmp_ausschreibungen Themenauswahl: NMP-2008-1.2-1 Pilot lines to introduce nanotechnology-based processes into the value chain of existing industries NMP-2008-1.2-2 Nanotechnologies for water treatment NMP-2008-1.3-1 Validation, adaptation and/or development of risk assessment methodology for engineered nano-particles NMP-2008-1.3-2 Impact of engineered nanoparticles on health and the environment NMP-2008-2.1-1 Nanostructured membrane materials NMP-2008-2.4-1 Inorganic-Organic Hybrid Materials NMP-2008-3.2-3 Coordination and support of inter-regional manufacturing communities following IMS strategy update NMP-2008-3.4-1 Rapid design and virtual prototyping of factories Seite 40 40

Energie Thematische Schwerpunkte mit Umweltrelevanz: CO2 STORAGE TECHNOLOGIES 2. Ausschreibung GD RTD: Veröffentlichung: 30.11.2007 Ende der Einreichfrist: 26.02.2008 (1.St.)/29.05.2008 (2.St.) Budget: 26,3 Mio. Euro Informationsveranstaltung: http://rp7.ffg.at/energie_ausschreibungen Themenauswahl: Enhancing international cooperation between the EU and Latin America in the field of biofuels (SICA) CO2 Transport and storage infrastructure development CO2 Capture and storage – public acceptance Development of a suitable methodology for the qualification of deep saline aquifers for CO2 storage Diese Slide bezieht sich nur auf den general RTD Call! Es gibt weiters einen EU Russia Call, FET Call, Joint Call Energy+NMP =>aus meiner Sicht mit keinen relevanten Themen f. Umwelt Ausblick: 2. Ausschreibung TREN vorauss. im 1. Quartal 2008 mit Schwerpunkt Demo (Concerto-Initiative!) Seite 41 41

Verkehr (inkl. Luftfahrt) Thematische Schwerpunkte mit Umweltrelevanz: Klimawandel und Transport 2. Ausschreibung: Veröffentlichung: 30.11. 2007 Ende der Einreichfrist: 07. 05. 2008 Budget: rd. 138 Mio. Euro Informationen: http://rp7.ffg.at/verkehr_ausschreibungen Themenauswahl: AAT.2008.7.1 Understanding interactions between air transport, environment and society SST.2008.1.2.1 Preventive and emergency interventions to protect marine, coastal and land environments SST.2008.1.3.1 Effects of climate change on inland waterway and transport networks TPT.2008.1. Assessing disruptive effects of extreme weather events on operation and performance of EU transport system TPT.2008.2 The climate-friendly travel choice in the city, region and world of tomorrow TPT.2008.4. Impact assessment of transport research funding in Europe on the environment (air, water and soil) TPT.2008.5. Techno-economic analysis per mode and combined to meet EU GHG emission reduction targets at time horizon 2020 and beyond TPT.2008.12. Raising Citizen Awareness of Research Results for Climatefriendly Transport Systems Seite 42 42

Sozial-, Wirtschaft- und Geistes- wissenschaften Thematische Schwerpunkte mit Umweltrelevanz: Verbindung wirtschaftlicher, sozialer und ökologischer Ziele auf europ. Ebene Europa in der Welt Sozioökonomische und wissenschaftliche Indikatoren Nächste Ausschreibung: Veröffentlichung: vorauss. Sommer 2008 Ende der Einreichfrist: vorauss. Herbst 2008 Budget: ? Informationen: http://rp7.ffg.at/ssh Themenauswahl: noch keine Themen vorhanden Seite 43 43

Weltraum Thematische Schwerpunkte mit Umweltrelevanz: Area 9.1.1: Pre-operational validation of GMES services and products SPA.2007.1.1.01 Development of upgraded capabilities for existing GMES Fast-Track Services and related (pre)operational services SPA.2007.1.1.02 Developing pre-operational GMES pilot services in new application fields Nächste Ausschreibung: Veröffentlichung: Ende 2008 Ende der Einreichfrist: Anfang 2009 Budget: ? Informationen: http://rp7.ffg.at/weltraum Seite 44 44

Sicherheit Thematische Schwerpunkte: Schutz der BürgerInnen Sicherheit von Infrastrukturen und Versorgungseinrichtungen Grenzschutz und intelligente Überwachung Wiederherstellung der Sicherheit im Krisenfall 2. Ausschreibung: Veröffentlichung: vorauss. Juli 2008 Ende der Einreichfrist: vorauss. November 2008 1. Draft Arbeitsprogramm: Beginn 2008 Informationen: http://rp7.ffg.at/sicherheit Seite 45 45

Das 7. EU-Rahmenprogramm (2007-2013) COOPERATION – Kollaborative Forschung Vordefinierte Themen, modifizierte “Instrumente” IDEAS – Pionier Forschung Individuelle Anträge, Europäischer Forschungsrat PEOPLE – “Human Potential” Mobilität von ForscherInnen CAPACITIES – Forschungskapazitäten Infrastruktur, KMU, Wissensregionen,… Joint Research Center + EURATOM Seite 46

Programme IDEEN und MENSCHEN Grundlagenorientierte Spitzenforschung High-tech KMU Einzelprojekte (Team, kein Forschungskonsortium) Keine thematische Vorgabe MENSCHEN Personalfinanzierung Marie Curie Netzwerke Zusammenarbeit Universität/Unternehmen Intra-Europäische und Internationale „Fellowships“ Ideen: Grundlagen-orientierte Forschung, Bottom up Prinzip Menschen: Förderung der Mobilität von Forschern, Bottom up Prinzip, Ausbildungs- und Trainingsaktivitäten durch Marie Curie Netzwerke, Seite 47 47

IDEEN Thematische Schwerpunkte mit Umweltrelevanz: Bottom-up Nächste Ausschreibungen: Call Identifier: ERC-2008-AdG ERC Adavcnced Investigators Grant Publikation des Calls: November/Dezember 2007 Einreichprozedere: einstufiges Einreichverfahren/zweistufiges Evaluationsverfahren Einreichfrist: Panel PE1 – PE10: 28. Februar 2008 Panel SH1 – SH6: 18. März 2008 Panel LS1 – LS9: 22. April 2008 Budget: 516,950 Mio € Call Identifier: ERC-2008-StG ERC Starting Independent Researcher Grant Publikation des Calls: Sommer 2008 Einreichprozedere: einstufig/zweistufig ? Einreichfrist: Herbst 2008 Budget: 290 Mio € Informationen: http://rp7.ffg.at/ideen_ausschreibungen Seite 48 48

MENSCHEN Thematische Schwerpunkte mit Umweltrelevanz: Thematisch ungebunden Nächste Ausschreibung: Publikation der Calls: 16.11.07, 30.11.07,19.03.08, 04.04.08, 19.11.09 Einreichprozedere: einstufig Maßnahme/Budget/Ausschreibungszeitraum: Marie Curie Initial Training Networks (ITN), 185 Mio. € - 04. April 08 / 02.Sep. 08 Marie Curie Intra European Fellowships (IEF), 75 Mio. € - 19. März 08 / 19. Aug. 08 Marie Curie European Reintegration Grants (ERG), 7 Mio € - 03. April 08 und 08. Okt. 08 MC Co-funding of regional, national and international Programmes (COFUND), 65 Mio € - 13. März 08 Marie Curie Industry-Academia Partnership and Pathways (IAPP), 45 Mio. € - 25. März 08 Marie Curie International Outgoing Fellowships (IOF), 25 Mio. € - 19. März 08 / 19. Aug. 08 Marie Curie International Incoming Fellowships (IIF), 25 Mio. € - 19. März 08 / 19. Aug. 08 Marie Curie International Reintegration Grants (IRG), 17 Mio. € - 03. April 08 und 08. Okt. 08 Marie Curie International Research Exchange Scheme (IRSES) 25 Mio. € - 28.März 08 Marie Curie Researchers‘ Night (NIGHT) 3 Mio € - 05. März 08 Informationen: http://rp7.ffg.at/menschen_ausschreibungen Seite 49 49

Das 7. EU-Rahmenprogramm (2007-2013) COOPERATION – Kollaborative Forschung Vordefinierte Themen, modifizierte “Instrumente” IDEAS – Pionier Forschung Individuelle Anträge, Europäischer Forschungsrat PEOPLE – “Human Potential” Mobilität von ForscherInnen CAPACITIES – Forschungskapazitäten Infrastruktur, KMU, Wissensregionen,… Joint Research Center + EURATOM Seite 50

Forschungsinfrastrukturen 3. Ausschreibung (Unterstützung für bestehende Forschungsinfrastrukturen) Veröffentlichung: 30.11.2007 Ende der Einreichfrist: 26.02.2008 Budget: 277 Mio. EURO Informationen: http://rp7.ffg.at/resinf Rahmenbedingungen: Kombination von Bottom up + targeted approach Kombination von CP + CSA Umweltrelevante Themenauswahl: Das Programm ist themenoffen Zusätzlich ausgeschriebene Themen: e-infrastructure for earth system’s understanding and modelling; seismic engineering research and testing infrastructure; network of hydrological observatories, river basin networks and databases for water resources research; integrating existing monitoring and observation stations in Arctic and Antarctic for polar research Seite 51 51

Wissensorientierte Regionen Thematische Schwerpunkte mit Umweltrelevanz: Regional contribution to the reduction of CO2 emissions Nächste Ausschreibung: Veröffentlichung: 30.11.2007 Ende der Einreichfrist: 14.03.2008 Budget: 9,3 Mio Euro Informationen: http://rp7.ffg.at/regionen Seite 52 52

Forschungspotenzial Thematische Schwerpunkte mit Umweltrelevanz: any research topic covered by the EC FP7 Nächste Ausschreibung: Veröffentlichung: 30.11.2007 Ende der Einreichfrist: 14.03.2008 Budget: rd. 29 Mio Euro Informationen: http://rp7.ffg.at/forschungspotenzial Wichtige Information: Projects should complement actions for research entities co-financed through the cohesion policy programmes for 2007-2013 (specifically through the European Regional Development Fund) The projects must be proposed by a single public or private research entity which is established as a legal entity in the EU's convergence regions and outermost regions. Seite 53 53

Wissenschaft in der Gesellschaft Thematische Schwerpunkte mit Umweltrelevanz: Ethik-Forschung Nächste Ausschreibung: Veröffentlichung: 30.11.2007 Ende der Einreichfrist: 18.03.2008 Budget: rd. 28,8 Mio Euro Informationen: http://rp7.ffg.at/sis Themenauswahl: SiS-2008-1.1.2.1 Ethics and new and emerging fields of science and technology Seite 54 54

Internationale Kooperationen Thematische Schwerpunkte mit Umweltrelevanz: keine Nächste Ausschreibung: Veröffentlichung: 02.10.2007 Ende der Einreichfrist: 12.02.2008 Budget: rd. 11 Mio Euro Informationen: http://rp7.ffg.at/inco_ausschreibungen Themenauswahl: ERA-NET, ERA-NET Plus “International Cooperation” Seite 55 55

KMU im Programm KAPAZITÄTEN Forschung zugunsten KMU und KMU-Verbände Auslagerung des Grossteils der Forschung Bottom-up v.a. KMU ohne oder nicht ausreichendem Forschungspotenzial und zur Ergänzung der Kernkompetenz Klares Nutzungspotenzial für KMU Seite 56

Forschung zugunsten von KMU I Alle KMU, die Forschungsaktivitäten auslagern müssen: - hauptsächlich für KMU, die über kein oder nicht ausreichendes Forschungspotenzial verfügen - für F&E-betreibende KMU, die zur Ergänzung ihrer Kernkompetenz Forschungsaktivitäten auslagern Lösung gemeinsamer oder komplementärer technologischer Probleme: bottom-up! Relative kurze Laufzeit Orientierung am Innovationsbedarf der KMU Auslagerung der Forschung an FTE-Akteure Klares Nutzungspotential für KMU Seite 57

Other organisations/end-user Forschung zugunsten von KMU II Schema Industrie ForscherInnen mind. 3 KMU aus mind. 3 Staaten Universitäten Forschungsinstitute High-Tech KMU Forschungslabore der Industrie Other organisations/end-user Seite 58

Forschung zugunsten von KMU - Zusammenschlüssen Industrielle Vereinigungen/-gruppierungen vergeben Forschungs- und Innovationsaktivitäten an externe Forschungsdienstleister gewisse Anzahl einzelner KMU im Projekt mittlere Laufzeit Themen (bottom-up) von Interesse für große Anzahl von KMU bzw. KMU-Sektoren, z.B. gemeinsame Probleme / Herausforderungen (z.B. Umwelt / Sicherheit etc.) Pränormative Forschung technologische Grundlagen eines gesamten Sektors stärken technologische Werkzeuge entwickeln (z.B. Diagnose, Sicherheitsausrüstung etc.) Seite 59 59

Forschung zugunsten von KMU – Überblick I Veröffentlichung: 30.11.2007 Einreichfrist: 11.04.2008 Budget: rund 93 M€ Forschung zugunsten KMU Zusammenschlüssen Veröffentlichung: Juni 2008 Einreichfrist: 26.09.2008 (2.Stufe: März 09) Budget: min. 58 M€ Budget: 1,336 Mrd. Euro (2007-2013) entspricht durchschn. jährlicher Budget-Steigerung von rund 60% gegenüber 6.RP Seite 60

Forschung zugunsten von KMU – Überblick II Weitere wichtige Informationen im Zusammenhang mit den Arbeitsprogrammen und ersten Ausschreibungen Research for SMEs Research for SME associations Duration 1 - 2 years 2 - 3 years Number of partners 5-10 10-15 Total budget* € 0.5 – 1.5 Million € 1.5 – 4 Million Activities R&D, demonstration, management, other activities Neu: treshold für Bewertungskriterium „impact“ wurde von 3 auf 4 erhöht (und als Konsequenz der overall treshold von 10 auf 11) Neu: Konsortialabkommen muss vor Vertragsabschluss fertiggestellt sein (bisher: als erstes Deliverable im Projekt selbst) * Share of R&D carried out by RTD performers : bulk of the project Quelle: Europäische Kommission Seite 61 Seite 61 61 61

Zusammenfassung: Forschung zugunsten KMU & KMU Zusammenschlüssen weitgehende Harmonisierung der beiden Förderschemen stärkere Betonung der Auslagerung der Forschung an Dritte: „bulk of the project“ Förderhöhe: abhängig von beteiligten Organisationstypen und deren Projekt-Aktivitäten, ca. 75% (+/-) der Projektgesamtkosten Other enterprises und Enduser in beiden Schemen zugelassen Demonstration und Training in beiden Schemen möglich mehr Flexibilität bei Regeln hinsichtlich Eigentums- und Zugangsrechte: „trade-off“ Seite 62

Gesamtüberblick öst. CRAFT-Projekte aus dem 6.RP detaillierte Projektbeschreibungen CRAFT / 6.RP sämtliche Themenbereiche http://rp7.ffg.at/kmu_Musterprojekte Seite 63

Weitere europäische Ausschreibungen ERA-NET aktueller/nächster call Thema / Zielgruppe Bemerkung www BiodivERsA Deadline: 3.3.2008 (12:00 CET) Global Change and biodiversity dynamics, Ecosystem functioning, Ecosystem services www.eurobiodiversa.org IWRM.NET Deadline: 28.2.2008 Hydrological and morphological pressures and impacts on ecological status, Water Governance www.iwrm-net.org/ Cornet 15.Jänner- 30.April 2008 collective research   www.cornet-era.net EraSME 2.1. - 31.3.2008 alle Themen / SME AT Mitwirkung zu bestätigen Eurostars Cut of dates 2008: Februar u November alle Themen /SME www.eurostars-eureka.eu/ EraStar Beginn 2008 (genauen Daten tbc) GALILEO, GMES & Technology Applications www.era-star.net Eurotransbio 09.11.2007 - 15.02.2008 All sectors of modern biotechnology; SME / (Research institutions/Industry) www.eurotransbio.net BioEnergy ab 1.1.2008 Short Rotation Coppice/ Firmen und Forscher www.eranetbioenergy.net Key features no additional costs –saves on courier bills relies on the Internet – so submit in advance yes it operates at night and the week-end. Support is CET only note that it relies on HTTPS and is thus very secure Seite 64 64

Deadline for Submission: 31st January 2008 Calls of the Austrian Science and Research Liaison Offices Ljubljana and Sofia 1. South Eastern Europe's Scientific Response to: Biodiversity protection, climate change and energy scarcity Funding: € 119.000, max. € 12.000 per project Consortium: A+SLO/BG (eligible as contractors) +WB and RO 2. Thematically open call for research cooperation and networking between Austria, Kosovo/UNMIK and South Eastern Europe This Call for Proposals has no thematic restriction, but a networking approach and added value for solving society driven current or upcoming problems in Kosovo must be shown. Funding: € 120.000, max. € 12.000 per project Consortium: A (eligible as contractor)+Kosovo+SEE The main goal is to promote networking and the exchange of research results and know-how, comparative studies and know-how exchange on European standards and practices in the specified areas. ...The activities should build on already existing scientific results. Deadline for Submission: 31st January 2008 Link to ASO-Calls: http://aso.zsi.at/en/all/ausschreibung/list 25. Februar 2005 Präsentationstitel der FFG 65

Referat für Umwelt, Sicherheit und sozio-ökonomische Forschung Cooperation KMU Services Referat für Umwelt, Sicherheit und sozio-ökonomische Forschung Mag. Andrea Höglinger - Referatsleiterin und stv. Bereichsleiterin Nationale Kontaktstelle für Wissenschaft in der Gesellschaft, Nationale Kontaktstelle für Wirtschafts-, Sozial- und Geisteswissenschaften +43 (0)5 7755 - 4002, andrea.hoeglinger@ffg.at DI Andrea Hoffmann Nationale Kontaktstelle für Umwelt (einschl. Klimaänderung), Nationale Kontaktstelle für Sicherheit +43 (0)5 7755 - 4401, andrea.hoffmann@ffg.at DI Susanne Dragosits Nationale Kontaktstelle für KMU, Expertin Umwelt und Sicherheit +43 (0)5 7755 - 4403, susanne.dragosits@ffg.at Dr. Michalis Tzatzanis Experte Umwelt, Wissenschaft in der Gesellschaft und Wirtschafts-, Sozial- und Geisteswissenschaften +43 (0)5 7755 - 4405, michalis.tzatzanis@ffg.at Solveig Gutzelnig - Assistentin +43 (0)5 7755 - 4411, solveig.gutzelnig@ffg.at MMag. Bettina Asamer-Laganda - derzeit in Karenz

Vielen Dank für Ihre Aufmerksamkeit! Andrea Hoffmann und Susanne Dragosits Bereich für Europäische und Internationale Programme Österreichische Forschungsförderungsgesellschaft www.ffg.at http://rp7.ffg.at