TARGET I got the machine 6 and the objective consists of the analysis of the files in Excel, the availability and efficiency of each machine to calculate for each observation period from. Ceylan Isik Wirtschaftsingenieurwesen Maschinenbau und Logistik Betriebsinformatik und Programmieren (BIPR)
D ESCRIPTION OF THE SOLUTION Put the LOG file in exel LOG file open. Copy and paste it into a new Excel-file. Set the filter to your own machine (machine 6). Create another table standstill cause, with an additional table (SU_Text). Ceylan Isik Wirtschaftsingenieurwesen Maschinenbau und Logistik Betriebsinformatik und Programmieren (BIPR) S TEP 1
S TEP 2 Set a filter and order by ascending time Then calculate the : respective stoppage (see table), event time (TIME = (B2, C2, D2) and event transmission (= + I2 + TIME (0, 0, H2) See the picture: Ceylan Isik Wirtschaftsingenieurwesen Maschinenbau und Logistik Betriebsinformatik und Programmieren (BIPR)
S TEP 3 plausibility check Next day / previous day observed. First formula: = IF (I2 <J3, "positive", "negative") wrong still negative values, observed a day Final formula: = IF (I2 <J3, "positive", IF (A2 <A3, "positive", "negative")) correctly if everything is positive, false if there are negative statements. Ceylan Isik Wirtschaftsingenieurwesen Maschinenbau und Logistik Betriebsinformatik und Programmieren (BIPR)
S TEP 4 Ceylan Isik Wirtschaftsingenieurwesen Maschinenbau und Logistik Betriebsinformatik und Programmieren (BIPR) Then I calculated what is TRU (rest period), TI (technical difficulties) and TW (maintenance period). an overview of the downtime causes which I first converted in seconds (s) had the formula = SUMIF (F: F, 1, H: H) then formatted into the format of hours (h) The respective stoppage causes the respective region (TRU, TI, TW) ordered
STEP 5 Calculate efficiency formula: Formula for the utilization in Excel: = SUM (((C5-C6-C7-C8) / C5) * 100) SUM(((TB-TRU-TI-TW)/TB)*100 The utilization rate is 85,45% Ceylan Isik Wirtschaftsingenieurwesen Maschinenbau und Logistik Betriebsinformatik und Programmieren (BIPR)
S TEP 6 availability charge formula: MTBF = TB-TI MMTR =TI Availability: MTBF + MMTR Ceylan Isik Wirtschaftsingenieurwesen Maschinenbau und Logistik Betriebsinformatik und Programmieren (BIPR)