Indo-German Workshop „Disaster Management“ 17. Nov. 2011 Frank Schulze 26.08.08 Indo-German Workshop „Disaster Management“ 17. Nov. 2011 Frank Schulze www.thw.de © Technisches Hilfswerk
Technology and fun THW Sinzig You‘re welcome www.thw.de © Technisches Hilfswerk
Technisches Hilfswerk OV Sinzig Fascination of THW This year THW is 61 years old. But - 81% of the more than 80.000 volunteers are not older than 40 years, - nearly 20% of the active helpers are between 17 – 25 years old. - 10 % of the adults are women, - in the youth groups (10 – 17 years) 20% are girls and - in the Mini groups (6 – 9 years) are 25% girls. Why do people join and stay in THW? A poll among the members in our local section would give me always the three arguments: 1. Enjoying technics 2. Splendid feeling, when you are able to help other people 3. And most important: the camaraderie that contributes to the fascination with THW. 3
Organisational structure of the local section Sinzig Technisches Hilfswerk OV Sinzig Organisational structure of the local section Sinzig
Technisches Hilfswerk OV Sinzig Special group water dangers 31.03.2017 Local commissioner Frank Schulze Stand: 15.06.2007 Staff Command squad Dep. Local commissioner Rainer Deller Platoon leader Oliver Gansen Training commissioner Patrick Tarrach Command squad leader Daniel Gronwald Resp.for equipment Torsten Geis Voice radio operator Birgit Deutschmann Commissioner for PR Jochen Tarrach driver Rene Deller Leader youthgroup Birgit Deutschmann Jörg Dettmers Admanistrative helper Sven Ockenfels 1. Rescue team 2. Rescue team Special group water dangers Admanistrative helper Adrian Nießen Group leader Michael Rönn Group leader Hagen Hoppe Group leader Rene Linden Cook Carsten Kley Squad leader Bernd Link Squad leader Jens Fischer Squad leader Adrian Niessen Driver Jörg Dettmers Driver Rüdiger Schäfer Squad leader Sven Ockenfels Helper Vincenzo Fregapane Helper Tim Paffhausen Driver Michael Laß Helper Fabian Simanzik Helper Julia Rabe Helper Sascha Alfter Helper Tobias Möllmann Helper Bernd Crecelius Helper Georgia Pfleiderer Helper Lara Snoei Helper Lars Schmitt Helper Martin Knebel Helper Svenja Schnitzler Helper Andre LInden Helper Patrick Loerakker Helper Marcel Adam Helper Thomas Becker Helper Hans-Peter Wegener Helper Alexander Bildhoff Helper Susanne Wacht Helper Dirk Fokken
Technisches Hilfswerk OV Sinzig All in all in local section Sinzig: 53 active helpers, 11 women (20% female) Youth group with 25 adolescents (40 % girls) More than 17.000 hours of honorary work each year in 2009 – 2010 2.500 hours during operations each year On an average: 274 hours per helper and year Pupils, students, craftsmen, employees, civil servants and self employed
Technisches Hilfswerk OV Sinzig The kitchen Breakfast 7
Technisches Hilfswerk OV Sinzig 8
Technisches Hilfswerk OV Sinzig 9
Technisches Hilfswerk OV Sinzig Examples of local section Sinzig Basic training
Technisches Hilfswerk OV Sinzig Basic training 11
Technisches Hilfswerk OV Sinzig Basic training
Technisches Hilfswerk OV Sinzig Basic training 13
Technisches Hilfswerk OV Sinzig Basic training 14
Technisches Hilfswerk OV Sinzig Basic training 15
Technisches Hilfswerk OV Sinzig Specialist training
Technisches Hilfswerk OV Sinzig Breathing protection
Technisches Hilfswerk OV Sinzig Transport of injured persons by means of a ladder
Technisches Hilfswerk OV Sinzig Going by boat
Technisches Hilfswerk OV Sinzig
Technisches Hilfswerk OV Sinzig Construction of a ferry
Technisches Hilfswerk OV Sinzig
Training of the motorists Technisches Hilfswerk OV Sinzig Training of the motorists
Technisches Hilfswerk OV Sinzig
Technisches Hilfswerk OV Sinzig
Technisches Hilfswerk OV Sinzig
Technisches Hilfswerk OV Sinzig
Contributions on own account at the local section Technisches Hilfswerk OV Sinzig Contributions on own account at the local section
Technisches Hilfswerk OV Sinzig Flooding of the Rhein 1993 in Remagen-Oberwinter
Technisches Hilfswerk OV Sinzig
Technisches Hilfswerk OV Sinzig Grinding, priming and painting of a trailer
Technisches Hilfswerk OV Sinzig
Technisches Hilfswerk OV Sinzig Grinding, priming and painting of a trailer
Technisches Hilfswerk OV Sinzig Grinding, priming and painting of a trailer
Technisches Hilfswerk OV Sinzig
Technisches Hilfswerk OV Sinzig
Technisches Hilfswerk OV Sinzig
Technisches Hilfswerk OV Sinzig Selfmade lighting cross-beam for a MAN crane
Technisches Hilfswerk OV Sinzig The Youth Group
Technisches Hilfswerk OV Sinzig
Technisches Hilfswerk OV Sinzig
Technisches Hilfswerk OV Sinzig Competitions of youth-groups in all 16 federal states of Germany 42
Technisches Hilfswerk OV Sinzig In the following year the best youth group of each federal state takes part in the competion for the best youth group in Germany.
Technisches Hilfswerk OV Sinzig youth-group of Sinzig in competition 2011
Technisches Hilfswerk OV Sinzig 45
Technisches Hilfswerk OV Sinzig The bench is ready 46
Technisches Hilfswerk OV Sinzig Relationships with other organisations including professional emergency services providers 47
Technisches Hilfswerk OV Sinzig Training with firemen 15.3. 2008 48
Technisches Hilfswerk OV Sinzig 49
Technisches Hilfswerk OV Sinzig 50
Technisches Hilfswerk OV Sinzig 51
Technisches Hilfswerk OV Sinzig 52
Technisches Hilfswerk OV Sinzig Presentation of THW for federal armed forces
Technisches Hilfswerk OV Sinzig Visitors from China – presentation of THW and fire sevice
Technisches Hilfswerk OV Sinzig
Desinfektion for district Ahrweiler Technisches Hilfswerk OV Sinzig Construction of 2 disinfection facilities for the district, for example in case of Foot and mouth disease.
Technisches Hilfswerk OV Sinzig
Technisches Hilfswerk OV Sinzig Shooting for imagefilm
Truck Grand Prix - Nürburgring Technisches Hilfswerk OV Sinzig Truck Grand Prix - Nürburgring
Technisches Hilfswerk OV Sinzig Concert of country music with up to 30.000 spectators: Illuminating during a blackout 60
Technisches Hilfswerk OV Sinzig Juli 06: construction of a 200 meter pontoon bridge in Breisach over river Rhine
Technisches Hilfswerk OV Sinzig The operations
Technisches Hilfswerk OV Sinzig flooding of the Rhine
Technisches Hilfswerk OV Sinzig
Technisches Hilfswerk OV Sinzig The team during the flooding of the river Elbe 2002
Technisches Hilfswerk OV Sinzig Accident on the motorway with 3 deadly injured in 2002
Technisches Hilfswerk OV Sinzig
Technisches Hilfswerk OV Sinzig 2003: Whirlwind in Acht / Eifel, destroyed houses, illuminating the scenery
Technisches Hilfswerk OV Sinzig December 2003, Gas explosion in Oberzissen
Technisches Hilfswerk OV Sinzig Burning house, 30.03. 2008, working together firefighters and THW 70
Technisches Hilfswerk OV Sinzig 02.07.08 – second operation with fire service in 2008
Technisches Hilfswerk OV Sinzig
Technisches Hilfswerk OV Sinzig Catering for more than 100 firemen
Technisches Hilfswerk OV Sinzig 12.12.08 Truck accident on Autobahn
Technisches Hilfswerk OV Sinzig
Technisches Hilfswerk OV Sinzig
Technisches Hilfswerk OV Sinzig
Technisches Hilfswerk OV Sinzig 20. september 2009 – 300 burning bales of straw 78
Technisches Hilfswerk OV Sinzig 79
Technisches Hilfswerk OV Sinzig Wheel loader in action 80
Technisches Hilfswerk OV Sinzig 81
Technisches Hilfswerk OV Sinzig 82
Technisches Hilfswerk OV Sinzig 83
Technisches Hilfswerk OV Sinzig THW International Our helpers were deployed during operations in: Burkina-Faso, Cyprus, Ethiopia, France, Latvia, Liberia, Mauretania, Mosambique, Russia, Tunisia, Sierra Leone, USA,
Technisches Hilfswerk OV Sinzig 19.06.08 EXPO in Zaragossa, Spain World Expo in Spain had water as its theme
Technisches Hilfswerk OV Sinzig THW – volunteers well known as the „water people“ and as „blue angels“
Technisches Hilfswerk OV Sinzig New Orleans 05: THW in operation 87
Technisches Hilfswerk OV Sinzig Tunisia Technisches Hilfswerk OV Sinzig
Technisches Hilfswerk OV Sinzig
Technisches Hilfswerk OV Sinzig 90
Technisches Hilfswerk OV Sinzig 91
Technisches Hilfswerk OV Sinzig 92
Technisches Hilfswerk OV Sinzig 93
Technisches Hilfswerk OV Sinzig 94
Technisches Hilfswerk OV Sinzig 95
Technisches Hilfswerk OV Sinzig 96
Technisches Hilfswerk OV Sinzig
Technisches Hilfswerk OV Sinzig 98
Technisches Hilfswerk OV Sinzig Arles Technisches Hilfswerk OV Sinzig Flooding in December 2003.
Technisches Hilfswerk OV Sinzig Site investigation
Technisches Hilfswerk OV Sinzig Using the pumps
Technisches Hilfswerk OV Sinzig
Assessment Burkina Faso 05.-18.09.09 Bonn – Ouagadougou 4317 km air-line distance
Technisches Hilfswerk OV Sinzig Flooding in Burkina Faso 09. 01. 2009 – more than 150,000 people left homeless 104
Technisches Hilfswerk OV Sinzig 105
Technisches Hilfswerk OV Sinzig 5 victims, Roads, bridges and dams have been badly damaged 106
Technisches Hilfswerk OV Sinzig 107
Technisches Hilfswerk OV Sinzig 108
Technisches Hilfswerk OV Sinzig 109
Technisches Hilfswerk OV Sinzig 110
Technisches Hilfswerk OV Sinzig On-Site Operations Coordination Centre (OSOCC) 111
Technisches Hilfswerk OV Sinzig An electrical plant was destroyed, a water plant was flooded 112
Technisches Hilfswerk OV Sinzig Investigation of faults to prepare the exchange of several destroyed motor pumps (produced in Germany). 113
Technisches Hilfswerk OV Sinzig Dr. Nana, project leader of GTZ for water supply and sanitation 114
Technisches Hilfswerk OV Sinzig Water supply 115
Technisches Hilfswerk OV Sinzig Typical water distribution in the suburbs: water in a mobile tun is sold 116
Technisches Hilfswerk OV Sinzig Thank you for your attention!