Power Supplies at BESSY II

Slides:



Advertisements
Ähnliche Präsentationen
Digital Output Board and Motherboard
Advertisements

Cadastre for the 21st Century – The German Way
An new European Power Network: Student Power
Klicken Sie, um das Titelformat zu bearbeiten Klicken Sie, um die Formate des Vorlagentextes zu bearbeiten Zweite Ebene Dritte Ebene Vierte Ebene Fünfte.
SION Vacuum Circuit-Breakers 3AE5 and 3AE1
Themenportal Europäische Geschichte / Web portal European History
Beam Based Alignment von Quadrupol-Magneten in den HERA Bögen
Energy Supply in the Region Ulm / Neu-Ulm
PPTmaster_BRC_ pot Rexroth Inline compact I/O technology in your control cabinet SERCOS III Components Abteilung; Vor- und Nachname.
IndraMotion MLC RoCo Electric Drives and Controls
Transponder Systems for Identification and Micro-Telemetry Dr
Jugendherberge Berlin Reflexiv- verben Bilder Alles geht.
Relativpronomen Fill in Rel.pron. Kombiniert! Konjunktiv Fill.
An OGC Standards Driven Geodata Online Access for DLRs National Remote Sensing Data Library (NRSDL) Torsten Heinen German Remote Sensing Data Center (DLR/DFD)
Synchro-betatron Resonanzen: eine Einführung und Berechnung der Resonanzstärken für verschiedene HERA Optiken F. Willeke Betriebsseminar Salzau 5-8. Mai.
Wir schaffen Wissen – heute für morgen 8. Januar 2014PSI,8. Januar 2014PSI, Paul Scherrer Institut Markus Stadler BPM test facilities at PSI June 24, 2010.
e - Entwicklung e Business e Commerce e Cash e Banking e Shops m ...
Peter Marwedel TU Dortmund, Informatik 12
Aufgabenbesprechung Programming Contest. Order 7 Bo Pat Jean Kevin Claude William Marybeth 6 Jim Ben Zoe Joey Frederick Annabelle 0 SET 1 Bo Jean Claude.
Telling Time in German Deutsch 1 Part 1 Time in German There are two ways to tell time in German. There are two ways to tell time in German. Standard.
Dokumentation des Umul Projektes documentation of the Umul Project der 8R3: by the 8R3: Energiesparen im Klassenraum saving of energy in the classroom.
NUMEX – Numerical experiments for the GME Fachhochschule Bonn-Rhein-Sieg Wolfgang Joppich PFTOOL - Precipitation forecast toolbox Semi-Lagrangian Mass-Integrating.
1 Dirk Wiedner Straw Detectors for the Large Hadron Colider.
Three minutes presentation I ArbeitsschritteW Seminar I-Prax: Inhaltserschließung visueller Medien, Spree WS 2010/2011 Giving directions.
Dumpline Status We have a leak of ~10 -4 mbar in the section inside the concrete shielding The leak is likely to be at a flange connection of the BPM (Ti/SS.
Testing Novel TOF ELBE STATUS REPORT F. Dohrmann, E. Grosse, K. Heidel, B. Kämpfer, R. Kotte, L.Naumann Forschungszentrum Rossendorf Institut.
Forschungszentrum Jülich In der Helmholtz-Gemeinschaft Rolf Stassen IKP/ COSY Darmstadt 1 Status report HESR 1: RF Cavity.
KAE praxis verstehen chancen erkennen zukunft gestalten understanding reality facing challenges creating future Laboratory of Integrated Energy Systems.
Kern- und Teilchenphysik
Front end low Temperature
Integration of renewable energies: competition between storage, the power grid and flexible demand Thomas Hamacher.
Sekundärprophylaxe – HPV-Impfung nach Konisation
Alles ist eins Die toten Hosen
Own photographs Fachgebiet Schienenfahrwege und Bahnbetrieb Prof. Dr.-Ing. habil. J. Siegmann Dipl.-Ing. Helge Stuhr Technische Universität Berlin Institut.
Studying at ETH Zürich Dauer Graduiertenstufe Untergraduierten stufe Graduiertenstudium Doktorat Masterstudium (Total 3000) Bachelorstudium (Total 6000)
Tag um Tag, Jahr um Jahr, Tag um Tag, Jahr um Jahr, Day by day, year by year, Wenn ich durch diese Straßen geh', When I go through these streets, Seh ich.
Question words and word order By the end of this lesson you will have revised question words By the end of this lesson you will be able to use question.
Laurie Clarcq The purpose of language, used in communication, is to create a picture in the mind and/or the heart of another.
Unwanted Beam Observations at ELBE
Institut AIFB, Universität Karlsruhe (TH) Forschungsuniversität gegründet 1825 Towards Automatic Composition of Processes based on Semantic.
Institut für Solare Energieversorgungstechnik Verein an der Universität Kassel Bereich Energetische Biomassenutzung, Hanau Dipl.-Ing. J. Müller Bioturbine,
René Bart, Head of Organization Service January 2013 platinn Service Organization 4 Stages Reference Process platinn is an initiative of the cantons of.
FINSB01FINSB02FINSB03FINSB04 Phase 2: Phase Burkhalter (Inauguration or Phase 2a): FINSB01FINSB02FINSB03 FINSB01FINSB02FINSB03FINSB04 Phase 3 (some time.
Status and Future Plans for the SRF Gun at ELBE
Bildungssystem Indiens
1 Ein kurzer Sprung in die tiefe Vergangenheit der Erde.
Ich möchte ein Eisberg sein. Last time … 3 icebergs Triangels Unique connections Ich möchte ein Eisberg sein
Ü bersetzen VokabelnFragenKulturBilder
Technische Universität Berlin Fakultät für Verkehrs- und Maschinensysteme, Institut für Mechanik Lehrstuhl für Kontinuumsmechanik und Materialtheorie,
Angry Olympics Part Eight – Time trials Did you see me win the 100 metres last week? Hast du gesehen, wie ich letzte Woche den Hundert- Meter-Lauf gewonnen.
The Ground-Based Millimeter Wave Radiometer MIRA2 Forschungszentrum Karlsruhe in der Helmholtz-Gemeinschaft Forschungszentrum Karlsruhe in der Helmholtz-Gemeinschaft.
Workers build a footpath around the vertiginous slopes of Shifou Mountain in China. Arbeiter bauen einen Weg rund um die schwin-delerregenden Wände des.
Der LHC Proton-Proton Collider und seine supraleitende Magnete Rüdiger Schmidt - CERN Universität Wien Februar 2002.
Mein Stammbaum.
Fusszeilentext – bitte in (Ansicht – Master – Folienmaster, 1. Folie oben) individuell ändern! Danach wieder zurück in Normalansicht gehen! 1 OTR Shearography.
SAN der zweiten Generation Compellent … in weniger Speicher investieren Christian Browers – BDM - DE / A / CH.
By: Jade Bowerman. German numbers are quite a bit like our own. You start with one through ten and then you add 20, 30, 40 or 50 to them. For time you.
Wind Energy in Germany 2004 Ralf Christmann, BMU Joachim Kutscher, PTJ
Titelmasterformat durch Klicken bearbeiten Textmasterformate durch Klicken bearbeiten Zweite Ebene Dritte Ebene Vierte Ebene Fünfte Ebene 1 Titelmasterformat.
1 Intern | ST-IN/PRM-EU | | © Robert Bosch GmbH Alle Rechte vorbehalten, auch bzgl. jeder Verfügung, Verwertung, Reproduktion, Bearbeitung,
Component 4 Frankfurt (Oder) & Slubice Seite 1 COMPONENT 4: – in Frankfurt (Oder) & Slubice 1.All participants presented themselves.
Selectivity in the German Mobility Panel Tobias Kuhnimhof Institute for Transport Studies, University of Karlsruhe Paris, May 20th, 2005.
Instrumente und Unterhaltung End of Unit Assessment.
Carbon Nanotubes (CNTs)
Präzisions-Physik mit Neutronen / 1. Neutronenquellen
SiPass standalone.
Freitag den 21. März Time-manner-place
Bremse brake Welcher Roller hat eine Fussbremse, welcher hat eine Handbremse? Which scooter has a footbrake, which one has a handbrake?
Du bist am dicksten und am dümmsten.
Ferrite Material Modeling (1) : Kicker principle
 Präsentation transkript:

Power Supplies at BESSY II

Types of power supplies installed at BESSY II and MLS Layout Who is HZB?    Bessy II Storage Ring   The Metrology Light Source (MLS) of the PTB Types of power supplies installed at BESSY II and MLS Upgrade Programm for BESSY II Topping up Fast orbit feedback Future Project     BERLin Pro Berlin Energy Recovery Linac Prototype POCPA 2010 /K. Burkmann-Gehrlein, T.Schneegans

Helmholtz-Zentrum Berlin Who is HZB? Former HMI Former BESSY Since 1st of January 2009 Helmholtz-Zentrum Berlin Für Material und Energie BER II ISL Photovoltaic BESSY II MLS SC RF POCPA 2010 /K. Burkmann-Gehrlein, T.Schneegans

BESSY II Storage Ring: Circumference 240 m Electron energy 1.7 GeV e- beam current up to 300 mA 32 Bending Magnets 144 Quadrupole Magnets 112 Sextupole Magnets 144 Corrector User operation since 1998 4 POCPA 2010 /K. Burkmann-Gehrlein, T.Schneegans

The Metrology Light Source (MLS) of the PTB MLS Storage Ring: Circumference 48 m Electron energy 105-630 MeV e- beam current 1 pA to 200 mA 8 Bending Magnets 24 Quadrupole Magnets 24 Sextupole Magnets 28 Corrector User operation since 2008 POCPA 2010 /K. Burkmann-Gehrlein, T.Schneegans

Types of power supplies installed at BESSY II and MLS 130 devices made by: BESSY 100 W–1 kW 240 devices made by: BESSY Rohrer (GER) WME (GER) 1 kW–10 kW 50 devices made by: Delta (NL) Danfysik (DK) 10 kW–100 kW 60 devices made by: Danfysik (DK) Jäger (GER) > 100 kW 5 devices made by: Danfysik (DK) Jäger (GER) In The year 2004: 485 power supplies and 1 beamloss per month: MTBF = 40 years POCPA 2010 /K. Burkmann-Gehrlein, T.Schneegans

Upgrade Programm for BESSY II: Topping Up Today: 3 injections a day Future (2013): Topping Up In the Top-Up operation lost electrons are replaced continuously after minutes rather than every eight hours in order to keep a nearly constant beam current.  A new 50 MeV Linac for Top Up and flexible fill pattern (Operation starts erly 2011) Sextupole PS for 10 Hz dynamic cromaticity correction in the booster synchrotron (Operation starts end 2010) POCPA 2010 /K. Burkmann-Gehrlein, T.Schneegans

Upgrade Programm for BESSY II: Fast orbit feedback Today: 0.2 Hz transversal global orbit feedback Overall there are 122 corrector magnets installed as auxilliary windings in the 112 sextupole magnets. 48 for horizontal plane 74 for vertical plane POCPA 2010 /K. Burkmann-Gehrlein, T.Schneegans

Old Power supplies for the slow (0.2 Hz) transversal orbit feedback Old Corrector PS Power Supplies ROHREr Stability: ±100 ppm ripple +drift 3db bandwidth: <10 Hz Digital controls Digital Status CAN-Bus Two analog readbacks 16 bit resolution. One Slow High precission ADC One 100 kHz ADC ADA 16 IO8 Interfaceboard Embedded Controller Trigger Setpoint Mains Terminal Analog Setpoint Resolution up to 19 Bit Ext Interlock Terminal + Shunt resistor Magnet + Linear Power Stage Shunt resistor POCPA 2010 /K. Burkmann-Gehrlein, T.Schneegans

Eliminate perturbation sources wherever possible No Noise is better than Anti-Noise: R.Müller BPM Measurement Caused by switching of muliplexers on the Interfaceboard POCPA 2010 /K. Burkmann-Gehrlein, T.Schneegans

Upgrade Programm for BESSY II: Fast orbit feedback Future (2012): Fast Orbit Feedback 200 Hz The concentration of almost 50 experimental stations in the experimental hall increases environmental noise, thereby adversely affecting the resolution and stability of measurement setups.  Phase I replacement of all corrector power supplies aims at higher correction speed (20Hz – 60Hz) Phase II replace today’s multiplexed analog beam position monitors (BPMs) by parallel processing fast digital units to increase correction precision: POCPA 2010 /K. Burkmann-Gehrlein, T.Schneegans

New power supplies for the fast (200 Hz) transversal orbit feedback New Corrector PS Power Supplies WME PA4008\11 Stability: ±100 ppm ripple +drift 3db bandwidth: 1 kHz Digital controls Digital Status CAN-Bus Two analog readbacks 16 bit resolution. One Slow High precission ADC One 100 kHz ADC ADA 16 IO8 Interfaceboard Embedded Controller Trigger Setpoint Mains Terminal Analog Setpoint Resolution up to 19 Bit Analog Modulation Input Second Analog Setpoint +/-10V for +/-Imax Ext Interlock Terminal + DCCT1-Regulation DCCT2-Monitor Magnet + Linear Power Stage DCCT1-Regulation POCPA 2010 /K. Burkmann-Gehrlein, T.Schneegans

New power supplies for the fast (200 Hz) transversal orbit feedback Transfer function for the complete system: power supply →magnet (auxilliary coils in BESSY II sextupoles ) →vacuum chamber →magnetic field at the place of the e-beam Conclusion: Up to several 100 Hz the correlation is rather linear POCPA 2010 /K. Burkmann-Gehrlein, T.Schneegans

New power supplies for the fast (200 Hz) transversal orbit feedback Output current an voltage: Due to the limited output voltage of 40 V and the inductances of the different loads the output current of 8 A at DC-operation will be limited for AC operation as shown below POCPA 2010 /K. Burkmann-Gehrlein, T.Schneegans

New power supplies for the fast (200 Hz) transversal orbit feedback Time schedule 2009 Installation und Inbetriebnahme der schnellen Datenübertragungen Aufbereitungen der schnellen Strahllagemessung 2010 Entwicklung des FOFB-Systems zur Einsatzreife, Einsatz des Pilotsystems im Betrieb Ausstehend: Bestellung der ersten Charge „schnelle Powersupplies“ 2011 Einbau der Powersupplies, sobald geliefert und Shutdownzeit vorhanden Inbetriebnahme und Ausbau der entsprechenden FOFB-Stufe Bestellung und Lieferung der fehlenden „schnelle Powersupplies“, Inbetriebnahme… 2012 Charakterisierung und Tuning 2013 R.Müller POCPA 2010 /K. Burkmann-Gehrlein, T.Schneegans

Future Project: BERLinPro Berlin Energy Recovery Linac Prototype What can be the succsessor for our 3rd generation lightsource BESSY II? ERLs hold the promise of becoming the future backbone of the SR sources, satisfying the needs of the current user community. BERLinPro is designed to develop and to demonstrate the CW LINAC technology and expertise required to drive next-generation light sources that are based on ERL principle 03/2011 first beam of srf photo electron source conceptual design report ready 2016 recirculation, energy recovery → start of accelerator physics experiments POCPA 2010 /K. Burkmann-Gehrlein, T.Schneegans

Thank you very much for your attention. Power Supplies at BESSY II Thank you very much for your attention. POCPA 2010 /K. Burkmann-Gehrlein, T.Schneegans

New power supplies for the fast (200 Hz) transversal orbit feedback POCPA 2010 /K. Burkmann-Gehrlein, T.Schneegans

New power supplies for the fast (200 Hz) transversal orbit feedback N. Hubert-SOLEIL 2009 DIPAC POCPA 2010 /K. Burkmann-Gehrlein, T.Schneegans

Erste Stufe der Realisierung des FOFB Power Supplies WME PA4008\11 Digital controls Digital Status CAN-Bus Two analog readbacks 16 bit resolution. One Slow High precission ADC One 100 kHz ADC ADA 16 IO8 Interfaceboard Embedded Controller Trigger Setpoint Analog Setpoint Resolution up to 19 Bit + Ansteuerung nur über den vorhanden CAN-Bus Anschluss. Zu erwarten sind Bandbreiten > 10 Hz. Die obere Grenze ist durch die Ansteuerung gegeben und erst im realen Test zu bestimmen Die zur Zeit global eingebauten alten Netzgeräte sind nur unterhalb 10 Hz, und das auch erst nach Umbau aller Geräte, einsetzbar DCCT1-Regulation DCCT2-Monitor + Linear Power Stage INom= ± 8 A UNom= ± 40 V

Zweite Stufe der Realisierung des FOFB Power Supplies WME PA4008\11 ADA 16 IO8 Interfaceboard Analog Setpoint Resolution up to 19 Bit Two analog readbacks 16 bit resolution. One Slow High precission ADC One 100 kHz ADC Digital Status Digital controls Trigger Setpoint + DCCT2-Monitor DCCT1-Regulation Linear Power Stage Second Analog Setpoint +/-10V for +/-Imax CAN-Bus Embedded Controller Analog Modulation Input Ansteuerung (z.B. auch für ein langsames Feedback <1 Hz) über den vorhanden CAN-Bus Anschluss. Zusätzlich Sollwertvorgabe über den Modulationseingang der Netzgeräte aus dem unabhängig aufgebauten schnellen Feedbacksystem stammend. INom= ± 8 A UNom= ± 40 V DCCT2-Monitor

Mögliche weitere Stufe drei der Realisierung des FOFB Power Supplies WME PA4008\11 Analog Setpoint including Modulation Analog readbacks Slow and Fast Digital Status Digital controls Trigger Setpoint DCCT2-Monitor DCCT1-Regulation Linear Power Stage + Neue Interfacekarte. Bisher noch nicht geplant. Eventuell nur neuen Embedded Controler auf alter ADA 16 CAN-Bus Für Remote Control Schneller Netzwerkanschluss für das komplette Feedback Ansteuerung über den vorhanden CAN-Bus Anschluss. Nur noch Remote Control und eventuell konstante Setzwerte werden hierüber zugestellt. Die Werte aus dem unabhängig aufgebauten schnellen Feedbacksystem werden digital über einen schnellen neuen Netzwerkanschluss zugestellt. INom= ± 8 A UNom= ± 40 V

Mögliche weitere Stufe vier der Realisierung des FOFB Power Supplies WME PA4008\11 Digital controls Neue Interfacekarte. Bisher noch nicht geplant. Digital Status Analog readbacks Slow and Fast Schneller Netzwerkanschluss für das komplette Feedback Trigger Setpoint Analog Setpoint including Modulation Remote Control über einen schnellen neuen Netzwerkanschluss. Auch die Werte aus dem schnellen Feedbacksystem werden digital über einen schnellen neuen Netzwerkanschluss zugestellt. DCCT1-Regulation DCCT2-Monitor + Linear Power Stage INom= ± 8 A UNom= ± 40 V

POCPA 2010 /K. Burkmann-Gehrlein, T.Schneegans Dietmar Simmering POCPA 2010 /K. Burkmann-Gehrlein, T.Schneegans

POCPA 2010 /K. Burkmann-Gehrlein, T.Schneegans Dietmar Simmering POCPA 2010 /K. Burkmann-Gehrlein, T.Schneegans