4ter Schweizer Workshop

Slides:



Advertisements
Ähnliche Präsentationen
Weinviertel-Südmähren-Westslowakei
Advertisements

Cadastre for the 21st Century – The German Way
PRESENTATION HEADLINE
An new European Power Network: Student Power
Peter S. Niess Steinbeis-Europa-Zentrum
Environmental Assessment in Germany Environmental Assessment in Federations: Current Dynamics and Emerging Issues September , 2009 Ottawa, Canada.
Vernetzung von Repositorien : DRIVER Guidelines Dr Dale Peters, SUB Goettingen 4. Helmholtz Open Access Workshop Potsdam, 17 Juni 2008.
The „Metropolitankonferenz Zürich“ – a new model for regional co-operation? AER Summerschool Wilfried Anreiter Amt für Verkehr Kanton.
Guten Tag! Good morning! ¡Buenos días! Bongiorno!.
E-Solutions mySchoeller.com for Felix Schoeller Imaging
Energy Supply in the Region Ulm / Neu-Ulm
P R O B e r u f ProBeruf e.V. Angelika Bühler Arbeitstreffen EP-EvaluatorInnen und der Programm-Evaluation EQUAL, 15. / 16. Dez. 2004, Berlin Mehrwert.
Managing the Transition from School-to-Work Empirical Findings from a Mentoring Programme in Germany Prof. i.V. Dr. Martin Lang.
R. Zankl – Ch. Oelschlegel – M. Schüler – M. Karg – H. Obermayer R. Gottanka – F. Rösch – P. Keidler – A. Spangler th Expert Meeting Business.
First Seminar in Brussels, 15th of December 2010
Institut für Umweltschutz in der Berufsbildung e.V. Folie 1 ALBATROS Ziele Jahreskonferenz 2004 Ziele der Albatros-Jahreskonferenz 2004 Objectives of the.
Die Senatorin für Arbeit, Frauen, Gesundheit, Jugend und Soziales ESF-Verwaltungsbehörde Freie Hansestadt Bremen Hildegard Jansen, head of Unit labour.
Steinbeis Forschungsinstitut für solare und zukunftsfähige thermische Energiesysteme Nobelstr. 15 D Stuttgart WP 4 Developing SEC.
FAST-LAIN Meeting May 2011 in Saarbrücken Partner Profile – Template Please use information from your FAST-LAIN work book for your profile in the.
Lancing: What is the future? Lutz Heinemann Profil Institute for Clinical Research, San Diego, US Profil Institut für Stoffwechselforschung, Neuss Science.
Thomas Herrmann Software - Ergonomie bei interaktiven Medien Step 6: Ein/ Ausgabe Instrumente (Device-based controls) Trackball. Joystick.
Fachabteilung 16A Überörtliche Raumplanung Cross border co-operation from the view of a public administration unit.
Deutsche Gesellschaft für Technische Zusammenarbeit GmbH Integrated Experts as interface between technical cooperation and the private sector – An Example.
Methods Fuzzy- Logic enables the modeling of rule based knowledge by the use of fuzzy criteria instead of exact measurement values or threshold values.
Medical Universities‘ Teaching Staff Training in Bochum Germany
Own photographs Fachgebiet Schienenfahrwege und Bahnbetrieb Prof. Dr.-Ing. habil. J. Siegmann Dipl.-Ing. Helge Stuhr Technische Universität Berlin Institut.
Laurie Clarcq The purpose of language, used in communication, is to create a picture in the mind and/or the heart of another.
Case Study Session in 9th GCSM: NEGA-Resources-Approach
Institut AIFB, Universität Karlsruhe (TH) Forschungsuniversität gegründet 1825 Towards Automatic Composition of Processes based on Semantic.
A good view into the future Presented by Walter Henke BRIT/SLL Schweinfurt, 14. November 2006.
Centre for Public Administration Research E-Government for European Cities Thomas Prorok
BAS5SE | Fachhochschule Hagenberg | Daniel Khan | S SPR5 MVC Plugin Development SPR6P.
Alp-Water-Scarce Water Management Strategies against Water Scarcity in the Alps 4 th General Meeting Cambery, 21 st September 2010 Water Scarcity Warning.
Technische Universität München - Internalising external costs of transportation - Effective option for climate protection or academic exercise? Regine.
Bilateral coordination for the Enhancement and Development of S&T Partnerships between the EU and the USA Internationale strategische Kooperation EU –
INTAKT- Interkulturelle Berufsfelderkundungen als ausbildungsbezogene Lerneinheiten in berufsqualifizierenden Auslandspraktika DE/10/LLP-LdV/TOI/
States in the development of a new service During the development a service will pass through a chain of stages determining the service.
Group Talk Developing spontaneous target language interaction.
© Apr-14 Prof. Dr. Christian Zich, Folie 1 Unternehmensführung / Sendung 11 Neue Managementtrends II.
Institut für Öffentliche Dienstleistungen und Tourismus The role of universities for regional labour markets: the example of central Switzerland Simone.
Institut für Öffentliche Dienstleistungen und Tourismus Informal learning for regional development Manfred Walser Towards a Knowledge Society: Is Knowledge.
SIT-MOON ESPRIT Project Nr st Review, Brussels, 27th of April 1998 slide 1 Siemens AG Österreich Robotiker Technische Universität Wien Politecnico.
Faculty of Public Health Department of Health Economics and Management University of Bielefeld WP 3.1 and WP 4.1: Macrocost EUprimecare Plenary Meeting.
Criteria for Authorship
Berner Fachhochschule Hochschule für Agrar-, Forst- und Lebensmittelwissenschaften HAFL Recent activities on ammonia emissions: Emission inventory Rindvieh.
4th Symposium on Lidar Atmospheric Applications
Ein Projekt des Technischen Jugendfreizeit- und Bildungsvereins (tjfbv) e.V. kommunizieren.de Blended Learning for people with disabilities.
The NAMA Facility – Support for the Implementation of NAMAs Subsidiary Body for Implementation in-session workshop on NAMAs Ben Lyon, DECC Norbert Gorißen,
ESSnet Workshop Conclusions.
3rd Review, Vienna, 16th of April 1999 SIT-MOON ESPRIT Project Nr Siemens AG Österreich Robotiker Technische Universität Wien Politecnico di Milano.
Berner Fachhochschule Hochschule für Agrar-, Forst- und Lebensmittelwissenschaften HAFL 95% der Ammoniakemissionen aus der Landwirtschaft Rindvieh Pflanzenbau.
Ohne Rohstoffe keine Keramik No Ceramics Without Raw Materials
Wind Energy in Germany 2004 Ralf Christmann, BMU Joachim Kutscher, PTJ
Development Effectiveness High Level Forum IV Busan, Südkorea 29. Nov. bis 1. Dez Busan Partnership for Effective Development Cooperation, Dez
The NAMA Facility – Support for the Implementation of NAMAs Subsidiary Body for Implementation in-session workshop on NAMAs Ben Lyon, DECC Norbert Gorißen,
Component 4 Frankfurt (Oder) & Slubice Seite 1 COMPONENT 4: – in Frankfurt (Oder) & Slubice 1.All participants presented themselves.
Technische Universität München Spatial aspects of the formation of GMO-free or GMO clubs Maarten J. Punt Technische Universität München.
Lehrstuhl für Waldbau, Technische Universität MünchenBudapest, 10./11. December 2006 WP 1 Status (TUM) Bernhard Felbermeier.
Social Media and Social Innovation a Manifesto
Selectivity in the German Mobility Panel Tobias Kuhnimhof Institute for Transport Studies, University of Karlsruhe Paris, May 20th, 2005.
GenoMik: Funding of Genome Research on Bacteria 2001 – 2006 Network 1 Topic:Genome Research on Bacteria relevant for Agriculture, Environment and Biotechnology.
KGE Kommunalgrund GmbH Entwicklungsträger der Landeshauptstadt Magdeburg Presentation for the REDIS Project at the Interim Conference.
How to use and facilitate an OptionFinder Audience Response System.
Technische Universität München 1 CADUI' June FUNDP Namur G B I The FUSE-System: an Integrated User Interface Design Environment Frank Lonczewski.
Andreas Burger ZENTRUM FÜR MEDIZINISCHE LEHRE RUHR-UNIVERSITÄT BOCHUM Irkutsk October 2012 Report about the lecture "Report of the TEMPUS IV- Project Nr.
Leonardo da Vinci Zukunftsbau GmbH European basic qualifications for building professions.
Your next assignment is not a test but rather an essay. In order to help you write this essay, we are going to discuss the parts of an essay in German.
Proposal for a unified XML-file of the avalanche report... © Patrick NAIRZ, Avalanche Warning Center Tyrol - Why do we need a unified XML-file? - Integration.
© Handwerkskammer für München und Oberbayern, Max-Joseph-Straße 4, München Dietmar Schneider Foreign Trade Department of the Chamber of Trade and.
Start here First time that a concern has been raised? – start at Universal. Other professionals already involved with child? – start at Personalised. Child.
 Präsentation transkript:

4ter Schweizer Workshop CODE 24 / Pilot Actions 23.03.2012 – ETH Zürich Professur für Raumentwicklung Felix Günther, Cecilia Braun, Ilaria Tosoni

Inhalt Update von Corridor Info System Lagebeurteilung und strategische Pilot Aktionen Zwischenergebnisse Die gemeinsame Strategie Nächste Aktivitäten

CIS Update: Ausbauprojekte am Korridor Quelle: IRL, ETH, 11/2011, fg

CIS Update: Finanzielle Mittel

Hafenentwicklung Betrachtungsebene Häfen Strömen Welt Cargo Entwicklung Bearbeitungsebene Häfen Entwicklung Vertiefungsebene - Stadt Häfen Entwicklung Themen: Ungleichgewicht Nord-Süd Ungleiche Verteilung TEU-t zwischn Seehäfen und Binnenhäfen Frage: Ist Binnenhafenstrategie für TEU auch südlich von Duisburg möglich? Quelle: IRL, ETH, 11/2011, cb

CIS Update: Wasserstrassen und Eisenbahntrassen Source: ERI 12.2009, ETH Zurich

Oberhausen-Düsseldorf Rastätter Tunnel Basel-Olten By-Pass Bellinzona Engpässe Engpässe aufgrund von fehlenden Kapazitäten: Oberhausen-Düsseldorf Rastätter Tunnel Basel-Olten By-Pass Bellinzona Quelle: IRL, ETH, 11/2011, fg

Kapazitätsauslastung Engpässe aufgrund von komplexen Probleme, Konflikten, unterschiedlicher Interessen: Oberhausen-Emmerich Mittelrhein Frankfurt-Mannheim Offenburg-Basel Chiasso-Mailand Quelle: IRL, ETH, 11/2011, cb

Inhalt Update von Corridor Info System Lagebeurteilung und Strategische Pilot Aktionen Zwischenergebnisse Die gemeinsame Strategie Nächste Aktivitäten

Action Research Nicht nur Daten Sammlung sondern “Experimente” bei realen Prozessen; Integrierte Entwicklung: Siedlung, Infrastruktur, Landschaft, Soziale Aspekte, Wirtschaft; Erkundung und Klärungsprozesse auf interregionaler und Korridor Ebene; Ad-hoc Vertiefungen in verschiedenen Regionen 2 Arten von Klärungsprozessen: Ideen Konkurrenz Verfahren (Test Planung; Ideenwerkstatt) Collaborative Assessment ‚Erkundungsplanung‘ Klärungsprozess Formelle Planung Hypothesen Aktionsprogrammm Vorschläge

Verfahren Ideenwerkstatt (6 Monaten) Partizipatives Planungsverfahren Gilt für Situationen, in denen es Konflikte gibt. Hinsichtlich der Durchführung eines Projekts oder es gibt Aspekte, die noch geklärt werden müssen. Es ermöglicht in kurzer Zeit zu konkreten Vorschlägen zu kommen und komplexe räumliche Konflikte werden diskutiert. Das Verfahren involviert lokale Planungsbehörden, Experten und Planungsteams. Die Teams werden eingeladen eine wettbewerbsfähige Einstellung und innovative räumliche Lösungen für ein Problem entlang des Korridors, wo Investitionen nötig sind, zu produzieren. Das Verfahren schafft die Voraussetzungen, um mit direkten Investitionen fortzufahren. Ergebnisse des Verfahrens sind Vorentwürfe und Empfehlungen. Collaborative Assessment (2 Monaten) Die Aktion kombiniert quantitative und qualitative Methoden. Es basiert auf einem Vergleich verschiedener Raumentwicklungs-Strategien. Die Strategien werden von einer Gruppe von Experten entwickelt und mit einem Team von lokalen Akteuren diskutiert (1 Monat). Durch eine Auswertungsmethode, basierend auf einer Multi-Kriterien-Analyse, macht man mit einer Gruppe lokaler Experten eine erste Prüfung der Alternativen (1/2 Tag). Von der geführten Diskussion werden die Themen ausgewählt, die als strategisch für die Entwicklung des Gebiets betrachtet werden und die Lösungen, die angemessen erscheinen. Diese werden bei Expertengruppen in einer zweiten Session weiter überprüft und diskutiert (1/2 Tag). Ergebnisse des Verfahrens sind Empfehlungen für die Weiterentwicklung einer gemeinsamen Raumentwicklungs-Strategie.

Lagebeurteilung Arnhem – Oberhausen Frankfurt / Mannheim Basel / Jura Strategische Abschnitte für Vertiefungsprozesse Arnhem – Oberhausen Ideenwerkstatt Dezember 2010 – April 2011 Frankfurt / Mannheim Collaborative Assessment 19/20 März 2012 Basel / Jura Ticino / Lombardia Quelle: IRL, ETH, 11/2011, it

Ideenwerkstatt Arnhem – Oberhausen Frankfurt / Mannheim Basel / Jura Strategische Abschnitte für Vertiefungsprozesse Arnhem – Oberhausen Ideenwerkstatt Dezember 2010 – April 2011 Frankfurt / Mannheim Collaborative Assessment 19/20 März 2012 Basel / Jura Ticino / Lombardia Quelle: IRL, ETH, 11/2011, it

Landkreis Wesel Amsterdam Rotterdam Utrecht Oberhausen Duisburg Essen Arnhem Rotterdam Utrecht Zevenaar Wesel Oberhausen Duisburg Essen

Ideenwerkstatt Betuwe Linie DB plänt 3te Gleis (1 Mio Euro 77km * 14 M/km) 8-12 m Lärmschutz Opposition der Gemeinden

Ideenwerkstatt Begleitgremium Vertreter von Institutionen und Hochschulen Felix Günther, ETH Zürich Prof. Dr. Dirk Vallée, Institut für Stadtbauwesen und Stadtverkehr der RWTH Aachen Werner Kühlkamp-Winkelmann, Niederrheinische IHK Duisburg Wesel Lothar Ebbers Kleve, zu Duisburg Pro Bahn e. V. Steffen Kerth, Verband Deutscher Verkehrsunternehmen Ludger Drabiniok, Verkehrsverbund Rhein-Ruhr Vertreter der Kommunen Holger Schlierf, Arbeitsgruppe Betuwe Hans-Joachim Berg, Bürgermeister der Stadt Hamminkeln Martin Wegner, Kreis Wesel Stadt Hamminkeln Hans-Georg Haupt, Kreis Wesel Helmut Klein-Hitpaß, Stadt Wesel Karl-Heinz Rudorf, Stadt Dinslaken Peter Klunk, Stadt Oberhausen Vertreter des RVR Dr. habil. Thomas Rommelspacher Maria T. Wagener Herbert Beckmann Werner Bernadowitz Heinz-Jürgen Hohlmann Frank Joneit PLANUNGSTEAMS Büro Schüßler-Plan Büro Moik CODE24 (ETH, Politecnico Torino, Universität Utrecht)

Ideenwerkstatt Wesel Aufgabenstellung / Aufgabenbericht (07.2010) Kick-off Meeting (08.12.2010) Auftaktpräsentation (25.01.11) Zwischenpräsentation (16.02.2011) Abschlusspräsentation (30.03.2011) Empfehlungen der begleitenden Gruppe (13.04.2011)

Aufgabenstellung

Ideen - Lärm

Übersichten - Lärm

Ideen – Kosten Lärmschutz

Ideen – Betrieb

Strategie

Ergebnisse Verbesserung der Kapazität möglich ohne 3.te Gleis Synergie mit anderen Entwicklungen: Hafen Wesel Lärmschutz mit unkonventionellen Massnahmen: nicht kostspieliger aber muss akzeptiert werden Finanzierung von Lärmschutz durch Regionalentwicklung oder städtebauliche Massnahmen Verbesserung des grenz-überschreitenden Nahverkehrs auch möglich Es braucht eine Regionale Strategie: die Gemeinden sollten diese gemeinsam berarbeiten und die RVR sollte den Prozess begleiten

Lagebeurteilung Arnhem – Oberhausen Frankfurt / Mannheim Basel / Jura Strategische Abschnitte für Vertiefungsprozesse Arnhem – Oberhausen Ideenwerkstatt Dezember 2010 – April 2011 Frankfurt / Mannheim Collaborative Assessment 19/20 März 2012 Basel / Jura Ticino / Lombardia Quelle: IRL, ETH, 11/2011, it

Inputs from the Regional Workshops Busiest route on axis 700 trains running parallel on 3 double track Mixed traffic on all routes Plans to expand S-Bahn in both regions Increase in travel time for long- distance passenger traffic because of mixed use Strong residential developments along freight routes Mainz-Frankfurt corridor Ludwigshafen-Mainz corridor

Inputs from the Regional Workshops Sub-optimal use of the existing capacity: Bottlenecks due to mixed use on the lines and weak hierarchy among the nodes Spatial development issues (Frankfurt/Mainz / Koblenz): expanding settlements meet growing freight traffic and noise Metropolitan area of Frankfurt: high housing and offices demand and low settlement potentials (brown-field development already carried out) Metropolitan area of Mannheim: low housing and offices demand and high potentials (brown-fields) Uncoordinated logistic strategy

Projects Rhein-Main / Rhein-Neckar Length of the new line: 85 km   Length of the new line: 85 km Speed: 300 km/h Characteristics: 2 tracks (+ Darmstadt 1 track) ca. 100 Road and 30 Railway crossings (overpasses) ca. 19 km trench and 7 km in Tunnel By-pass Mannheim By-pass Darmstadt Costs 1800 M Euro

Collaborative Assessment

Collaborative Assessment 3 aspects are considered strategic to the positive implementation of the action: the use of visualization techniques in all stages of the action: to give the participants a concrete idea of the discussed measures and of the different impacts of their implementation; the active role of the participants who is delegated the responsibility of finding a common ground through a focused interaction; the informal setting of the action, aiming at providing the needed environment for a free and open interaction and a creative attitude.

3 possible Scenarios

Strategy1 Frankheim New high speed line connecting the 2 main cities of Frankfurt and Mannheim in about 20/25 minutes; Strong integration between the two core areas; Sustainable inner development strategy: availability of brownfields in Mannheim; (Büro Molitor, 2010) > 30M/Km*85Km = 2550 M Euro

Frankheim Strategy1 Investments Challenges Actors (Büro Molitor, 2010) New High Speed line Frankfurt Mannheim (85 Km) Maximum Speed 250 Km/h = total travel time 20/25 min No stop in Darmstadt (saved money 67/112 M€) No By pass Mannheim (saved money 435 M€) Total Costs 1280 M Euro (15 M€/KM) (DB, 2005) Total costs Köln/Rhein Main 5’500 M€ = 30M/Km Renewal of brownfield areas in the Mannheim Region Available Areas ha 1’475 (Inner development) Potential new Inhabitants 180’000/250’000   Challenges Mannheim has to empower its position through strong choices regarding the concentration of the development in the core area and the development of a strong functional address New role for the Ports Also Frankfurt has to reduce the sprawling tendency: concentration on the main nodes Actors National Government /EU Regions Cities and small Communities DB (Büro Molitor, 2010) > 30M/Km*85Km = 2550 M Euro

Net-Regio Strategy 2 Improvement of the existing transport network; Small investments; Separation of long distance form freight and regional traffic; “Diffuse but concentrated” settlement development; Multi-level hierarchy of centers. 10/15 M Euro/Km * 150 km = Costs Upgrade Emmerich- Oberhausen 14 M/Km Costs Upgrade Sbahn Münich 13 M/Km

Net-Regio Strategy 2 Investments Challenges 10/15 M Euro/Km * 150 km = Upgrade of the existing network (ca. 300 Km) Separation of traffic flows New signalling Improvement of regional connections Small changes in long-distance travel times Noise protection measures New Operational Concept Costs 1’000/1’500 M€ (rough estimation) Challenges Core investment on logistics Mannheim focuses on actual strenghts: logistics, R&D, industry Frankfurt focuses on the international connections Hierarchical regional structure in 3 levels Spatial development focuses on the regional transport: development concentrated also on the small nodes; Limited development possibility in proximity to the freight corridor.   Actors Regions /Communities DB 10/15 M Euro/Km * 150 km = Costs Upgrade Emmerich- Oberhausen 14 M/Km Costs Upgrade Sbahn Münich 13 M/Km

EuroHUB Strategy 3 Integrated logistic concept; Realization of a dedicated freight line; Additional three-modal logistic hubs; Consistent investment in the Mannheim hub (shunting yard, port and upgrade of the railway link); Frankfurt benefits from better organization of the logistic chain and from the shift of logistic uses from the core area: new potentials for housing and services development. Costs Betuwe Linie 14 M/Km  

EuroHUB Strategy 3 Investments Challenges Actors Separation of traffic flows: focus on freight traffic New freight network: - new line or - dedicated line New signalling No changes in travel times Up-grade of Mannheim Shunting Yard Up-grade of Mannheim and Frankfurt Ports Costs: New line 85 km * 15 M Km = 1’500 M€ Dedicated line 85 km * 3/5 Km = 300/500 M€ Challenges Polarisation on the Mannheim node Mannheim focuses logistics: three-modal Hub Search for the most suitable logistic areas among the brownfield in the region Actors EU/National Government Region Mannheim Private Companies Universities Costs Betuwe Linie 14 M/Km  

Analytic Network Process Assess 3 alternative development scenarios Through a questionnaire the participants were asked to assess the crucial features and components of each scenario and to come to a shared decisions about the desirability of each proposed situation. Outcomes are a set of preferences regarding: thematic issues, project components the 3 scenarios

ANP

ANP and strategic assessment discussion

ANP: Ergebnisse Preferences are strongly focused on passenger traffic Missing financial resources are the biggest worry of the group and the aspect meant to play the biggest role Benefits show up clearly regarding Strategy 2 – Net-Regio The least expensive/costly is Stretegy 2 Net-Regio Strategy 1 Frankheim and 3 EuroHUB are equally considered a less beneficial option The most costly scenario is Strategy 3 Huro-HUB

ANP: Ergebnisse Integrated development should be the goal Solving economic and transport problems creates resources for the social aspects Which is the better use for the existing brownfield? Housing or logistics Solutions that will enable better local rail connections will also improve the settlement development Costs of infrastructure development affect not only the building sites but also impact on real estates values, quality of the environment, etc. Political dimension is also an issue: the regions are not strong enough (they are not relevant lobbyists). Environmental and social costs are always underestimated We need to be integrated in the European transport network Attractive public regional transport is important for the development of the whole region; high-speed is more productive at the international/national level; Separation of flows is the most beneficial intervention The high-speed solution bring the most positive impacts on the network if combined with smaller investments on the rest of the lines; the two additional tracks are the first step of a bigger strategy; Small investments will produce the needed capacity also for freight traffic but provide resources also for compensation measures (noise protection, by-passes, etc.) Logistics can be a support for industrial conversion Rhein-Neckar without logistic development will not be able to grow in the needed way and redevelop the brownfield Funding of logistic investments is politically difficult to justify A dedicated line for freight in the region is difficult because of the slopes: we can not avoid mixed use of the tracks (?)

Strategic assessment 3 groups (of max 4/5 experts) 1st Step Thematic discussion (45 min): the teams debated the crucial themes highlighted during the ANP session. 3 main sets of topics were further analysed: Spatial quality: What does it mean integrated Settlement / Transport / Social Development? Optimal speed / Accessibility: What kind of railway network do we want? New services: How could logistics contribute to regional development?

Strategic assessment Recommendations: Presentation and discussion (1/2 h): each team presented the outcomes of its work and a plenary discussion followed. Recommendations: on the basis of the final discussion, participants elaborated the recommendations that will constitute the core components of the interregional strategy

Strategic Assessment: Ergebnisse A coordinated development strategy is needed for the two regions Solutions have to promote a better use of the existing capacities The new investments should focus on freight network in order to made it more efficient, minimize impacts and exploit the opportunities offered by the demand for logistic services in the region; The presence of logistic flow is a resource: it has to be integrated in the region through a sustainable strategy. No by-passes, but high-standard solutions The experts group should continue working and study a new alternative

Inhalt Update von Corridor Info System Lagebeurteilung und Strategische Pilot Aktionen Zwischenergebnisse Die gemeinsame Strategie Nächste Aktivitäten

Stakeholders engagement Neue funktionen für die Regionale Ebene: Koordination, Stretegische Entwicklung, Integration von verschiedenen Kompetenzen Lokale und interregionale Diskussion der Prioritäten aufgrund der gesemten Übersicht

Inhalt Update von Corridor Info System Lagebeurteilung und Strategische Pilot Aktionen Zwischenergebnisse Die gemeinsame Strategie Nächste Aktivitäten

Gemeinsame Strategie Beteiligung von Top Entscheidungsträgern WP1 Common Strategy & EGTC Kommunikation WP4 WP2 Lärm WP3 Logistik Beteiligung von lokalen und regionalen Interessengruppen, Bürgern, Experten, Investoren, Administratoren

NL DE CH IT Ilaria Grafik State Region / Land Province Structural Vision /National Guidelines Spatial planning Water resources management (Ministry of Infrastructure and the Environment) Housing Policies (Ministry of the Interior) Regional policies (Ministry of Economic Affairs, Agriculture and Innovation) Integration Plan: at local level if national interest at stake National Mobility Plan (Ministry of Transport) NS Development Plan (State owned private Railway Comp). Railinfratrust (network); Railned (capacity allocation and safety) Railinfrabeheer and Railverkeersleiding (signalling and maintenance by Transport and Waterways Ministry) Leitbilder der Raumordnung (Bundesministerium für Raumordnung; Ministerkonferenz für Raumordnung) Federal infrastructure master plan Verkehrsausschuss des Bundesrats Verkehrsministerkonferenz Verkehrsinfrastrukturfinanzierungsgesellschaft Eisenbahn-Bundesamt, EBA Raumkonzept (ARE) Sachplan Infrastrukture (BAV) Bahn 2030 / Step /Fabi SBB development Plan Infrastructure plan Legge Obiettivo Conferences State/Regions RFI development Plan Region / Land Randstad Region; Amsterdam Metropolitan Area Landesentwicklungsprogramm, -plan Regional railway services planning Richtsplan Piano Territoriale Regionale Legge Territoriale Regionale Piano regionale dei Trasporti Province Regional Structural Vision Integration Plan: at local level if provincial interest at stake Regional Traffic / Private Railway Companies Regionalplan (regionaler Raumordnungsplan) Metropolregionen Verkehrsverbunde Regional Plan Aggloprogramm Piano Territoriale di Coordinamento Provinciale Local Communities Local Structural Vision Zoning Scheme Stadtentwicklungsprogramm, Bauleitplanung (Flächennutzungsplan, Bebauungsplan) Nutzungsplan Piano Comunale Piano comunale della Mobilità Ilaria Grafik

Ausbauprogramm Korridor Verschiedene thematische und räumliche Zuständigkeiten von Gebietskörperschaften und konzessionierten Unternehmen verlangen eine vertikale wie horizontale Koordination der Planung Europa schlägt im Weissbuch die Co-Finanzierung von Infrastrukturvorhaben der Mitgliedsländer vor. Das Interreg-Projekt Code 24 schlägt vor, diese Investitionen an klare Vorgaben zu knüpfen. Finanzierte Projekte sollen: Eine regionale Trägerschaft aufweisen; die Partizipation bei ihrer Erarbeitung gewährleisten; auf einer gemeinsamen und integrierten regionalen Entwicklungsstrategie beruhen. (Diskussion, was ist die räuml. Einheit)

Änderung der Priorisierung Ausbauprogramm 1 Ausbauprogramm 2 Ausbauprogramm x A B C Zeithorizont 1 Zeithorizont 2 Zeithorizont 3 Zeithorizont 4 Zeithorizont x Änderung der Priorisierung Priorität C: Klärung der Machbarkeit, Trassenvarianten, Ideenkonkurrenz Priorität B: Projekt, Richtplaneintrag Priorität A: Planfestgestellt

Region 1 (national oder grenzüberschreitend) Programm 1 Programm 2 Programm x Region 1 (national oder grenzüberschreitend) Änderung und regionales Abstimmen der Priorisierung Region 2 (national oder grenzüberschreitend) Region X (national oder grenzüberschreitend) Code 24 EGTC ist das Organ, das die Abstimmung der verschiedenen regionalen Ausbauprogramme koordiniert.

Kriterien der Priorisierung Functionality: (common trains may operate) Exposure to serviceability Adaptation to new standards (4m, double-deck) Security and capacity of access public points Capacity Capacity along track: Succession of trains (constructional and operational control) Competition between operational modes (regional-freight-passengers) Capacity along traffic nodes Spatial compatibility Potentials for inner development around railway stations Noise emissions Transport of dangerous goods and relevant incidents (Störfallvorsorge) Velocity Competition between velocity modes (Geschwindigkeitsdifferenz) Efficiency of nodes (Knoteneffizienz und deren Anschlusszeiten) Substitution of short range air traffic Heute ist Standart 4 Spuren!

A B C Ausbauprogramm 1 Ausbauprogramm 2 Ausbauprogramm x Zeithorizont 1 Zeithorizont 2 Zeithorizont 3 Zeithorizont 4 Zeithorizont x Blockverdichtung Gotthard CH Zugersee Ost-West CH AxenTunnel CH 3. Juraquerung CH Bern-Münsigen CH Umfahrung Bellinzona CH Hafen Basel CH-D Priorität C: Klärung der Machbarkeit, Trassenvarianten, Ideenkonkurrenz Priorität B: Projekt, Richtplaneintrag Priorität A: Planfestgestellt Zimmerberg-Tunnel CH Logistikknoten TiLo CH-I Vollausbau Lötschberg CH … … Urmiberg-Tunnel CH Rivera-Tunnel CH Gronda Ovest CH-I ,,, ,,, Neat Südanschluss CH-I HGV-Zürich-Basel CH-D … …

Beteiligung der Schweiz Bahnfinanzierung aktuell Finanzierungsmodell Code 24 2030 2013 Nationale Infrastrukturfinanzierung Abzulösen Interregionale Infrastrukturfonds, Mitfinanzierung von EU und Staaten (inkl. Schweiz) Aushandelungsprozess EU, Staaten, Länder/Kantone/Regionen, Landkreise/Provinzen/…

Inhalt Update von Corridor Info System Lagebeurteilung und Strategische Pilot Aktionen Zwischenergebnisse Nächste Aktivitäten Die gemeinsame Strategie

Road Map 4th swiss Workshop Top level meetings 3rd swiss Workshop Actions 2nd 2011 1st 2012 2013 Visualization tool Scenarios development Workshops for scenarios assessment Official presentation to the public and politicians 1. Frankfurt - Mannheim 1st General Assessment 2. Basel - Jura 2nd General Assessment 3. Ticino - Lombardia

Nächste Schritte Preparation 23.-24.04.2012 Semiannual Project Meeting (Frankfurt) 11.05.2012 Workshop Freiburg 20.-21.09.2012 Semiannual Project Meeting (Genoa) 21.11.2012 CODE24 Conference + PAB + Summit Talk