GMRA Projekt Presentation und Genehmigungsverfahren Pr ä sentation: Chakib Chraibi - 30/09/2009.

Slides:



Advertisements
Ähnliche Präsentationen
Alexander Stuber & Partner
Advertisements

Cadastre for the 21st Century – The German Way
Service Oriented Architectures for Remote Instrumentation
Environmental Assessment in Germany Environmental Assessment in Federations: Current Dynamics and Emerging Issues September , 2009 Ottawa, Canada.
The „Metropolitankonferenz Zürich“ – a new model for regional co-operation? AER Summerschool Wilfried Anreiter Amt für Verkehr Kanton.
Andreas Lill, Fujitsu Technology Solutions GmbH
E-Solutions mySchoeller.com for Felix Schoeller Imaging
SION Vacuum Circuit-Breakers 3AE5 and 3AE1
Development of a Web-Service for the DIOXIN- Database of Germany
R. Zankl – Ch. Oelschlegel – M. Schüler – M. Karg – H. Obermayer R. Gottanka – F. Rösch – P. Keidler – A. Spangler th Expert Meeting Business.
EN.EFF Sofia, EN.EFF F urtherance of A cceptance and I ntegration of N et based L earning tools within the A pprenticeship of the B uilding.
Fakultät für informatik informatik 12 technische universität dortmund Optimizations Peter Marwedel TU Dortmund Informatik 12 Germany 2009/01/17 Graphics:
Qualitätssicherung von Software
Normen für Windenergieanlagen
Projekt steuern.
Änderungen bewerten Change_Request.doc Änderungen bewerten Projekt-
Dokumentation des Umul Projektes documentation of the Umul Project der 8R3: by the 8R3: Energiesparen im Klassenraum saving of energy in the classroom.
Das Integrierte EU-Projekt ORCHESTRA - Konzeption einer offenen Dienstearchitektur im Kontext der INSPIRE-Initiative Ulrich Bügel, Thomas Usländer, Fraunhofer.
Installation des Add-In SOLVERSTAT
Introduction to BOS Supplier Guidelines v6
POST MARKET CLINICAL FOLLOW UP
Deutsche Gesellschaft für Technische Zusammenarbeit GmbH Integrated Experts as interface between technical cooperation and the private sector – An Example.
Medical Universities‘ Teaching Staff Training in Bochum Germany
1. Austrian Sustainable Technology Showcase
HAW Hamburg, CARPE 2011, Prof. Dr. Rüdiger Weißbach, Revision : Bridging the Communication Gap in IT Projects - Enabling Non-IT Professionals.
Case Study Session in 9th GCSM: NEGA-Resources-Approach
Institut AIFB, Universität Karlsruhe (TH) Forschungsuniversität gegründet 1825 Towards Automatic Composition of Processes based on Semantic.
Institut für Solare Energieversorgungstechnik Verein an der Universität Kassel Bereich Energetische Biomassenutzung, Hanau Dipl.-Ing. J. Müller Bioturbine,
FINSB01FINSB02FINSB03FINSB04 Phase 2: Phase Burkhalter (Inauguration or Phase 2a): FINSB01FINSB02FINSB03 FINSB01FINSB02FINSB03FINSB04 Phase 3 (some time.
| Pranjic, DC-IA/MKT52 | © Bosch Rexroth AG Alle Rechte vorbehalten, auch bzgl. jeder Verfügung, Verwertung, Reproduktion, Bearbeitung,
Sanjay Patil Standards Architect – SAP AG April 2008
| DC-IAP/SVC3 | © Bosch Rexroth Pneumatics GmbH This document, as well as the data, specifications and other information set forth in.
A good view into the future Presented by Walter Henke BRIT/SLL Schweinfurt, 14. November 2006.
Centre for Public Administration Research E-Government for European Cities Thomas Prorok
BAS5SE | Fachhochschule Hagenberg | Daniel Khan | S SPR5 MVC Plugin Development SPR6P.
1 micro CHP - Stirling Technology TTGB/ENT-PL | | Dk121_80307_public_Info_Stirling_EN | © Robert Bosch GmbH Alle Rechte vorbehalten, auch.
3rd Review, Vienna, 16th of April 1999 SIT-MOON ESPRIT Project Nr Siemens AG Österreich Robotiker Technische Universität Wien Politecnico di Milano.
© All rights reserved. Zend Technologies, Inc. Jan Burkl System Engineer, Zend Technologies Zend Server im Cluster.
Zafh.net SolNet Course Milano Antoine Dalibard - PhD project SolNET PhD Course Milano – Italy March 2008 PhD project: Simulation and control.
Quelle: Standish Group, 2006 Fourth Quarter Research Report, CHAOS Research Results.
2 Software Management SCRUM, Project Management, Quality Management, Business Analysis Innovation and Technology Management, Coaching, R&D Processes Quality.
Department of Computer Science Homepage HTML Preprocessor Perl Database Revision Control System © 1998, Leonhard Jaschke, Institut für Wissenschaftliches.
Titelmasterformat durch Klicken bearbeiten Textmasterformate durch Klicken bearbeiten Zweite Ebene Dritte Ebene Vierte Ebene Fünfte Ebene 1 Development.
States in the development of a new service During the development a service will pass through a chain of stages determining the service.
Presentation Civil Engineering Sciences Faculty of Civil Engineering Sciences Graz, May Civil Engineering Sciences and Economics – Civil Engineering.
SIT-MOON ESPRIT Project Nr st Review, Brussels, 27th of April 1998 slide 1 Siemens AG Österreich Robotiker Technische Universität Wien Politecnico.
Faculty of Public Health Department of Health Economics and Management University of Bielefeld WP 3.1 and WP 4.1: Macrocost EUprimecare Plenary Meeting.
Fach: Informatik Thema: Maschinendatenerfassung Klasse: 2AHWILJahrgang: 2013/2014 Höhere Technische Bundes-Lehr-und Versuchsanstalt St.Pölten Fachbereich.
Ein Projekt des Technischen Jugendfreizeit- und Bildungsvereins (tjfbv) e.V. kommunizieren.de Blended Learning for people with disabilities.
3rd Review, Vienna, 16th of April 1999 SIT-MOON ESPRIT Project No Siemens AG Österreich Robotiker Technische Universität Wien Politecnico di Milano.
3rd Review, Vienna, 16th of April 1999 SIT-MOON ESPRIT Project Nr Siemens AG Österreich Robotiker Technische Universität Wien Politecnico di Milano.
3rd Review, Vienna, 16th of April 1999 SIT-MOON ESPRIT Project No Siemens AG Österreich Robotiker Technische Universität Wien Politecnico di Milano.
Virtuelle Fachhochschule Technische Fachhochschule Berlin University of Applied Sciences Project Virtuelle Fachhochschule (guiding project) State of Study.
1 1 Panda Managed Office Protection Switch from Antivirus to Security as a Service Sales training presentation.
PR LIVING IN FREEDOM: Counting the cost IN FREIHEIT LEBEN: Berechne die Kosten Copyright CIC 2009.
SBU Industry TRIFLOW_ENGLISCH SBU Industry TRIFLOW_ENGLISCH Standstill is a step back The Triflow product line is designed for the.
Draft DSAG-Thementage
KGE Kommunalgrund GmbH Entwicklungsträger der Landeshauptstadt Magdeburg Presentation for the REDIS Project at the Interim Conference.
EN/FAD Ericsson GmbH EDD/ Information im 21. Jahrundert muss Erwünscht Relevant Erreichbar Schnell Kostenlos!?
TUM in CrossGrid Role and Contribution Fakultät für Informatik der Technischen Universität München Informatik X: Rechnertechnik und Rechnerorganisation.
1 University of Freiburg Computer Networks and Telematics Prof. Christian Schindelhauer Bachelor & Master Theses in Computer Networks No Lecture
Strategic Wood-Fuel Development in Brandenburg Stephen Dahle/ IHK Potsdam-ETI RW INTERREG IIIC Wood Energy Week Eberswalde Brandenburgische.
Andreas Burger ZENTRUM FÜR MEDIZINISCHE LEHRE RUHR-UNIVERSITÄT BOCHUM Irkutsk October 2012 Report about the lecture "Report of the TEMPUS IV- Project Nr.
Structure of architecture documentation
Institut für Nachrichtentechnik U. Reimers Technische Universität Braunschweig The MultiMedia Home Platform (MHP): Hype or Reality ?
Microsoft Partner Network (MPN)
Leonardo da Vinci Zukunftsbau GmbH European basic qualifications for building professions.
© Handwerkskammer für München und Oberbayern, Max-Joseph-Straße 4, München Dietmar Schneider Foreign Trade Department of the Chamber of Trade and.
Management System Regulatory Body Operator
 Präsentation transkript:

GMRA Projekt Presentation und Genehmigungsverfahren Pr ä sentation: Chakib Chraibi - 30/09/2009

Start of the Project: Ziel des Projektes:Wasserversorgung der St ä dte an der libyschen K ü ste und Bew ä sserung der Landwirtschaft. ->Wasserversorgung der St ä dte ist erreicht seit mindestens 10 Jahren ->Die Projekte der Landwirtschaft sind angegangen und es ist zu er- warten und Investoren interessieren sich bereits f ü r die F ö rderung der Landwirtschaft. -> Zust ä ndigkeit f ü r Landwirtschaft :(GMRWUA Tochtergesellschaft von GMRA) Projekt Phasen: Sarir Sirt Tazerbo-Benghazi System (ausgef ü hrt durch Dongha Konsortium) Algardabiya Sdada System (ausgef ü hrt durch Vinci Grands Projets) Hassouna-Jeffara System (ausgef ü hrt durch lybisch/korianisches Konsortium) Jaaghboub Tobruk System (Ersetzt durch Desalination) Kufra Tazerbo link (under Execution) Ghadamis-Zwara-Zawia System (ausgef ü hrt durch Tochtergesellschaft von ANC)

Full Redundancy in all levelsInternal Lining for Pumps Beispiele für Special GMRA Requirements - Glasfaserflocken Auskleidung f ü r die Pumpen - Fusion bonded epoxy f ü r die Armaturen for Controllers, Communication Systems and Power Systems

Guarantee for Buildings: 50 Years Duration life for Equipments: 15 – 25 Years Designed for use in desert environments Redundancy at all levels On line configuration and maintenance plant availability GMRA Guarantee Requirements Empfehlung: Tender Specification sorgf ä ltig lesen und die Kosten einstellen f ü r die Genehmigungsphasen im Angebot. Remark I: Standardprodukte der Industrie werden in der Regel nicht genehmigt. Remark II:Produkte aus Billigl ä nder werden auch nicht genehmigt.

Scada & Control and Communication Project

Projektstruktur für die Genehmigungsphasen

Document Submission and Approval Approval Cycle StatusDefinition AAPDesign Fully Approved ACADesign Conditionally Approved ARRDesign Revise and Resubmit CAPConstruction Fully Approved CCAConstruction Conditionally Approved CRRConstruction Revise and Resubmit REJReject CMTComment NCTNo comment SUPSuperseded WDNWithdrawn Remark:According to GMRA answer to the submittals follows within max. 30 days.

Wichtigste Genehmigungsschritte Project Quality Manual Key Personal genehmigen (Organization Chart) Functional Design Specification erstellen Technology Transfer Program erstellen Vendor Audit in den Fabriken Vendor Assessment : 3 verschiedene Vendors einreichen Detailed Technical Specification erstellen Purchase Order FAT Specification (Werksabnahmen) genehmigen Installation Specification (Montage Procedures) SAT Inbetriebnahme und Commissioning Procedures Training Specification Operation & Maintenance Manuals PAC (Provisional Acceptance) FAC (Final Acceptance)

2.4.7Typical Project Organization for SCADA & Control project Project Manager PM Erection and Commissioning Commercial PM Progress Control Manager Local PM & Operations Quality Control Manager Engineering SCADA Control & Comm. Pipeline Simulation System Instrumentation Tele-Communication Local Engineering Local QA/QC